This article analyzes the differential settlement of new and old roadbeds after widening and its characteristics based on a highway reconstruction and expansion project case study.The research proposes a subgrade sett...This article analyzes the differential settlement of new and old roadbeds after widening and its characteristics based on a highway reconstruction and expansion project case study.The research proposes a subgrade settlement control standard that states that the maximum differential settlement value should be less than 5 cm when the embankment fill height exceeds 20 m.Similarly,the maximum differential settlement value should be less than 10 cm when the embankment fill height does not exceed 20 m.The findings of the study can provide a useful reference for the design of roadbed widening in highway reconstruction and expansion projects.展开更多
Based on reasonable assumptions that simplified the calculational model,a simple and practical method was proposed to calculate the post-construction settlement of high-speed railway bridge pile foundation by using th...Based on reasonable assumptions that simplified the calculational model,a simple and practical method was proposed to calculate the post-construction settlement of high-speed railway bridge pile foundation by using the Mesri creep model to describe the soil characteristics and the Mindlin-Geddes method considering pile diameter to calculate the vertical additional stress of pile bottom.A program named CPPS was designed for this method to calculate the post-construction settlement of a high-speed railway bridge pile foundation.The result indicates that the post-construction settlement in 100 years meets the requirements of the engineering specifications,and in the first two decades,the post-construction settlement is about 80% of its total settlement,while the settlement in the rest eighty years tends to be stable.Compared with the measured settlement after laying railway tracks,the calculational result is closed to that of the measured,and the results are conservative with a high computational accuracy.It is noted that the method can be used to calculate the post-construction settlement for the preliminary design of high-speed railway bridge pile foundation.展开更多
In order to ensure that the tunnel deformation and surface settlement are controlled within the allowable range during the construction process,the design unit has compiled technical measures and monitoring schemes fo...In order to ensure that the tunnel deformation and surface settlement are controlled within the allowable range during the construction process,the design unit has compiled technical measures and monitoring schemes for ground settlement control of this project.Based on the example of a shallow tunneling project on Subway line 8,this paper analyzes and discusses the shallow tunneling method in detail and puts forward corresponding technical measures for ground settlement control.展开更多
China's infrastructure has gradually achieved large-scale development,and transportation construction has also shifted from east to west,transitioning from plains to mountainous areas.High-fill embankments of diff...China's infrastructure has gradually achieved large-scale development,and transportation construction has also shifted from east to west,transitioning from plains to mountainous areas.High-fill embankments of different sizes in mountainous areas are unavoidable,and the settlement of high-fill embankments is usually the most concerned issue in high-fill projects.According to the current research of highway projects,most of the high embankments in mountainous areas are soil-rock mixed embankments or rock-filled embankments,and their post-construction settlements are directly related to construction technology and the type of filler used.In this paper,the problems in the settlement control of earth-filled embankment and related factors are analyzed in detail.The settlement control technology of high-fill embankment in high-cold and high-altitude areas is also discussed,so as to ensure the overall quality of high-fill embankment.展开更多
The study mainly discusses the issues of the settlement of differences that occurs in the process of highway subgrade widening. Firstly, it briefly introduces the settlement of difference and its harms;then it analyze...The study mainly discusses the issues of the settlement of differences that occurs in the process of highway subgrade widening. Firstly, it briefly introduces the settlement of difference and its harms;then it analyzes the mechanism of settlement of differences in the process of difference widening, including four aspects: the new and old roadbeds themselves, design, construction and other links;finally, based on the above analysis of the mechanism, it discusses the corresponding control measures, mainly proposing these suggestions as followings: the use of lightweight materials, the foundation treatment, the cut slope excavation steps, and the strict control of the degree of compaction, etc. The paper is expected to provide some theoretical basis for the control measures of highway subgrade widening settlement of difference.展开更多
Since different underground engineering contains different geological conditions,structure and excavation methods,their disturbing degree on the ground also differs,but ground surface settlement caused by excavation h...Since different underground engineering contains different geological conditions,structure and excavation methods,their disturbing degree on the ground also differs,but ground surface settlement caused by excavation has one common point that they will form a ground surface settlement curve.Based on data statistical analysis,the article puts forward the relationship between point of inflection in digging tunnels with shallowburied method and the span of tunnel excavation against typical geological conditions in Changchun so as to predict the impact of tunnel excavation and improve reasonable ground surface settlement control standard.Research result will be useful for study on ground surface control standard in digging tunnels with shallow-buried method and setting settlement standard.展开更多
Overall figures of rural settlement landscapes on Guanzhong Plain were summarized,material components of these landscapes were classified into living landscape facilities and production landscape facilities,and then i...Overall figures of rural settlement landscapes on Guanzhong Plain were summarized,material components of these landscapes were classified into living landscape facilities and production landscape facilities,and then introduced respectively.From the perspective of rural central landscapes,rural yard landscapes,rural cluster landscapes and rural road landscapes,evolution of rural landscape spatial forms on Guanzhong Plain was analyzed.Moreover,problems of present rural landscapes were proposed,necessity and urgency of controlling evolution of rural settlement landscapes were stressed,and a rural landscape control mode in view of regional characteristics of Guanzhong Plain was given.展开更多
文摘This article analyzes the differential settlement of new and old roadbeds after widening and its characteristics based on a highway reconstruction and expansion project case study.The research proposes a subgrade settlement control standard that states that the maximum differential settlement value should be less than 5 cm when the embankment fill height exceeds 20 m.Similarly,the maximum differential settlement value should be less than 10 cm when the embankment fill height does not exceed 20 m.The findings of the study can provide a useful reference for the design of roadbed widening in highway reconstruction and expansion projects.
基金Projects(2009G008-B,2010G018-E-3) supported by Key Projects of China Railway Ministry Science and Technology Research and Development ProgramProject(CX2013B076) supported by Hunan Provincial Innovation Foundation For Postgraduate,China
文摘Based on reasonable assumptions that simplified the calculational model,a simple and practical method was proposed to calculate the post-construction settlement of high-speed railway bridge pile foundation by using the Mesri creep model to describe the soil characteristics and the Mindlin-Geddes method considering pile diameter to calculate the vertical additional stress of pile bottom.A program named CPPS was designed for this method to calculate the post-construction settlement of a high-speed railway bridge pile foundation.The result indicates that the post-construction settlement in 100 years meets the requirements of the engineering specifications,and in the first two decades,the post-construction settlement is about 80% of its total settlement,while the settlement in the rest eighty years tends to be stable.Compared with the measured settlement after laying railway tracks,the calculational result is closed to that of the measured,and the results are conservative with a high computational accuracy.It is noted that the method can be used to calculate the post-construction settlement for the preliminary design of high-speed railway bridge pile foundation.
文摘In order to ensure that the tunnel deformation and surface settlement are controlled within the allowable range during the construction process,the design unit has compiled technical measures and monitoring schemes for ground settlement control of this project.Based on the example of a shallow tunneling project on Subway line 8,this paper analyzes and discusses the shallow tunneling method in detail and puts forward corresponding technical measures for ground settlement control.
文摘China's infrastructure has gradually achieved large-scale development,and transportation construction has also shifted from east to west,transitioning from plains to mountainous areas.High-fill embankments of different sizes in mountainous areas are unavoidable,and the settlement of high-fill embankments is usually the most concerned issue in high-fill projects.According to the current research of highway projects,most of the high embankments in mountainous areas are soil-rock mixed embankments or rock-filled embankments,and their post-construction settlements are directly related to construction technology and the type of filler used.In this paper,the problems in the settlement control of earth-filled embankment and related factors are analyzed in detail.The settlement control technology of high-fill embankment in high-cold and high-altitude areas is also discussed,so as to ensure the overall quality of high-fill embankment.
文摘The study mainly discusses the issues of the settlement of differences that occurs in the process of highway subgrade widening. Firstly, it briefly introduces the settlement of difference and its harms;then it analyzes the mechanism of settlement of differences in the process of difference widening, including four aspects: the new and old roadbeds themselves, design, construction and other links;finally, based on the above analysis of the mechanism, it discusses the corresponding control measures, mainly proposing these suggestions as followings: the use of lightweight materials, the foundation treatment, the cut slope excavation steps, and the strict control of the degree of compaction, etc. The paper is expected to provide some theoretical basis for the control measures of highway subgrade widening settlement of difference.
文摘Since different underground engineering contains different geological conditions,structure and excavation methods,their disturbing degree on the ground also differs,but ground surface settlement caused by excavation has one common point that they will form a ground surface settlement curve.Based on data statistical analysis,the article puts forward the relationship between point of inflection in digging tunnels with shallowburied method and the span of tunnel excavation against typical geological conditions in Changchun so as to predict the impact of tunnel excavation and improve reasonable ground surface settlement control standard.Research result will be useful for study on ground surface control standard in digging tunnels with shallow-buried method and setting settlement standard.
文摘Overall figures of rural settlement landscapes on Guanzhong Plain were summarized,material components of these landscapes were classified into living landscape facilities and production landscape facilities,and then introduced respectively.From the perspective of rural central landscapes,rural yard landscapes,rural cluster landscapes and rural road landscapes,evolution of rural landscape spatial forms on Guanzhong Plain was analyzed.Moreover,problems of present rural landscapes were proposed,necessity and urgency of controlling evolution of rural settlement landscapes were stressed,and a rural landscape control mode in view of regional characteristics of Guanzhong Plain was given.