Analysis of the scattering parameters(S-parameters) of planar N-way metamaterial power dividers/combiners mostly uses commercial microwave circuit simulators due to the large circuit size involved. This paper presen...Analysis of the scattering parameters(S-parameters) of planar N-way metamaterial power dividers/combiners mostly uses commercial microwave circuit simulators due to the large circuit size involved. This paper presents an efficient circuit modeling approach, which is based on the multi-input and multi-output transmission matrix(T-matrix) method, to analyze the S-parameter of a planar nine-way metamaterial power-divider/combiner structure. S-parameter computation results are shown in good agreement with the simulation results by using the Agilent advanced design system(ADS) and measurement results. The computation time of an N-way metamaterial power divider/combiner with N=5, 9, 13, and 17 using T-matrix method is also compared with those of ADS and AWR Microwave Office(MWO) to demonstrate its computational efficiency.展开更多
The determination of source-side extracted heating parameters is of great significance to the economic operation of cogeneration systems.This paper investigated the coupling performance of a cogeneration heating and p...The determination of source-side extracted heating parameters is of great significance to the economic operation of cogeneration systems.This paper investigated the coupling performance of a cogeneration heating and power system multidimensionally based on the operating characteristics of the cogeneration units,the hydraulic and thermodynamic characteristics of the heating network,and the energy loads.Taking a steam network supported by a gas-steam combined cycle cogeneration system as the research case,the interaction effect among the source-side prime movers,the heating networks,and the terminal demand thermal parameters were investigated based on the designed values,the plant testing data,and the validated simulation.The operating maps of the gas-steam combined cycle cogeneration units were obtained using THERMOFLEX,and the minimum source-side steam parameters of the steam network were solved using an inverse solution procedure based on the hydro-thermodynamic coupling model.The cogeneration operating maps indicate that the available operating domain considerably narrows with the rise of the extraction steam pressure and flow rate.The heating network inverse solution demonstrates that the source-side steam pressure and temperature can be optimized from the originally designed 1.11 MPa and 238.8°C to 1.074 MPa and 191.15°C,respectively.Under the operating strategy with the minimum source-side heating parameters,the power peak regulation depth remarkably increases to 18.30%whereas the comprehensive thermal efficiency decreases.The operation under the minimum source-side heating steam parameters can be superior to the originally designed one in the economy at a higher price of the heating steam.At a fuel price of$0.38/kg and the power to fuel price of 0.18 kg/(kW·h),the critical price ratio of heating steam to fuel is 119.1 kg/t.The influence of the power-fuel price ratio on the economic deviation appears relatively weak.展开更多
Aiming at the problems of large-scale wind and solar grid connection,how to ensure the economy of system operation and how to realize fair scheduling between new energy power stations,a two-stage optimal dispatching m...Aiming at the problems of large-scale wind and solar grid connection,how to ensure the economy of system operation and how to realize fair scheduling between new energy power stations,a two-stage optimal dispatching model of wind power-photovoltaic-solar thermal combined system considering economic optimality and fairness is proposed.Firstly,the first stage dispatching model takes the overall economy optimization of the system as the goal and the principle of maximizing the consumption of wind and solar output,obtains the optimal output value under the economic conditions of each new energy station,and then obtains the maximum consumption space of the new energy station.Secondly,based on the optimization results of the first stage,the second stage dispatching model uses the dispatching method of fuzzy comprehensive ranking priority to prioritize the new energy stations,and then makes a fair allocation to the dispatching of the wind and solar stations.Finally,the analysis of a specific example shows that themodel can take into account the fairness of active power distribution of new energy stations on the basis of ensuring the economy of system operation,make full use of the consumption space,and realize the medium and long-term fairness distribution of dispatching plan.展开更多
A miniaturized broadband Wilkinson power divider is proposed. Micro-strip branch lines are introduced to replace multiple resistors used in multi-stage Wilkinson power dividers to increase the bandwidth of single-stag...A miniaturized broadband Wilkinson power divider is proposed. Micro-strip branch lines are introduced to replace multiple resistors used in multi-stage Wilkinson power dividers to increase the bandwidth of single-stage Wilkinson power dividers. To demonstrate its performance, an improved single-stage Wilkinson power divider with four micro-strip branch lines was designed. Simulated results show that the insert loss is better than 3.2 dB, the input return loss, output return loss, and isolation are better than 15 dB respectively, across a 76% bandwidth from 18 to 40 GHz. .展开更多
This paper briefs the configuration and performance of large size gas turbines and their composed combined cycle power plants designed and produced by four large renown gas turbine manufacturing firms in the world, pr...This paper briefs the configuration and performance of large size gas turbines and their composed combined cycle power plants designed and produced by four large renown gas turbine manufacturing firms in the world, providing reference for the relevant sectors and enterprises in importing advanced gas turbines and technologies.展开更多
Iran’s removing subsidy from energy carrier in four years ago leads to spike electricity price dramatically. This abrupt change increases the interest on distributed generation (DG) because of its several benefits su...Iran’s removing subsidy from energy carrier in four years ago leads to spike electricity price dramatically. This abrupt change increases the interest on distributed generation (DG) because of its several benefits such as lower electricity generation price. In Iran among all type of DGs, because of wide natural gas network infrastructure and several incentives that government legislated to support combined cooling, heat and power (CCHP) investors, this type of technology is more prevalent in comparison with other technologies. Between existing CCHP technologies, certain economic choices are to be taken into account. For different buildings with different load curves, suitable size and operation of CCHP should be calculated to make the project more feasible. If CCHP does not well suited for a position, then the whole energy efficiency would be plunged significantly. In this paper, a model to find the optimal size and operation of CCHP and auxiliary boiler for any users is proposed by considering an integrated view of electricity and natural gas network using GAMS software. Then this method is applying for a hospital in Tehran as a real case study. Finally, by applying COMFAR III software, useful financial parameters and sensitivity analysis are calculated.展开更多
In this paper,massive state-of-theart planar power dividers are presented and discussed. The innovations of these superiorly-performanced power dividers lie in the performance breakthrough,physical configurations and ...In this paper,massive state-of-theart planar power dividers are presented and discussed. The innovations of these superiorly-performanced power dividers lie in the performance breakthrough,physical configurations and function integrations. Eventually,based on the trend presented,the future of the power dividers is predicted. This paper might have inspiration significance to illuminate the way for the development of power dividers.展开更多
To improve the overall thermal efficiency of the organic Rankine cycle( ORC), a simulation study was carried out for a combined heat and power( CHP) system, using the Redlich-Kuang-Soave( RKS) equation of state....To improve the overall thermal efficiency of the organic Rankine cycle( ORC), a simulation study was carried out for a combined heat and power( CHP) system, using the Redlich-Kuang-Soave( RKS) equation of state. In the system,R245 fa was selected as the working fluid. A scroll expander was modeled with empirical isentropic expansion efficiency.Plate heat exchangers were selected as the evaporator and the condenser, and detailed heat transfer models were programmed for both one-phase and two-phase regions. Simulations were carried out at seven different heat source temperatures( 80,90, 100, 110, 120, 130, 140 ℃) in combination with eight different heat sink temperatures( 20, 25, 30, 35, 40, 45, 50,55 ℃). Results showthat in the ORC without an internal heat exchanger( IHE), the optimum cycle efficiencies are in the range of 7. 0% to 7. 3% when the temperature differences between the heat source and heat sink are in the range of 70 to90 ℃. Simulations on CHP reveal that domestic hot water can be produced when the heat sink inlet temperature is higher than40 ℃, and the corresponding exergy efficiency and overall thermal efficiency are 29% to 56% and 87% to 90% higher than those in the non-CHP ORC, respectively. It is found that the IHE has little effect on the improvement of work output and efficiencies for the CHP ORC.展开更多
The electromagnetic time-reversal(TR)technique has the characteristics of spatiotemporal focusing in a time-reversal cavity(TRC),which can be used for pulse compression,thus forming an electromagnetic pulse with high ...The electromagnetic time-reversal(TR)technique has the characteristics of spatiotemporal focusing in a time-reversal cavity(TRC),which can be used for pulse compression,thus forming an electromagnetic pulse with high peak power.A time-reversed pulse-compression method in a single channel has high pulse compression gain.However,single channel pulse compression can only generate limited gain.This paper proposes a novel TR power-combination method in a multichannel TRC to obtain higher peak power based on TR pulse-compression theory.First,the TR power-combination model is given,and the crosstalk properties of the associated channel and the influence of the reversal performance are studied.Then,the power-combination performances for the TR pulse compression,such as combined signal to noise ratio(SNR)and combined compression gain,are analyzed by numerical simulation and experimental methods.The results show that the proposed method has obvious advantages over pulse-compression methods using a single channel cavity,and is more convenient for power combination.展开更多
In this paper, two ultra-wide band power dividers are introduced. Compact equal power divider is considered firstly where an extended transmission lines and double open stubs are used in order to increase the bandwidt...In this paper, two ultra-wide band power dividers are introduced. Compact equal power divider is considered firstly where an extended transmission lines and double open stubs are used in order to increase the bandwidth. Secondly, an unequal UWB power divider is introduced where multi-stage impedance is used. The proposed power dividers are fabricated and measured. The overall sizes of the proposed power dividers are 11.37 × 17.87 mm2 for the equal one and 12.13 × 29.03 mm2 for the unequal power divider. The simulated results are compared with the measured results and good agreement is obtained.展开更多
A new power divider, composed of a novel composite right/left-handed (CRLH) transmission line (TL) unit, is proposed. The properties of the power divider based on four CRLH TL unit cells are investigated theoretically...A new power divider, composed of a novel composite right/left-handed (CRLH) transmission line (TL) unit, is proposed. The properties of the power divider based on four CRLH TL unit cells are investigated theoretically. By adjusting the parameters of the capacitors and the inductors, the power divider shows perfectly symmetric power division at 5.13 GHz, return loss up to ?24 dB, with the transmitted power being close to ?3.1 dB. The phenomena are demonstrated by simulation results. Being compact in size and low-cost, the proposed power divider is very suitable for microwave and millimeter wave integrated circuits.展开更多
Power Quality (PQ) combined disturbances become common along with ubiquity of voltage flickers and harmonics. This paper presents a novel approach to classify the different patterns of PQ combined disturbances. The cl...Power Quality (PQ) combined disturbances become common along with ubiquity of voltage flickers and harmonics. This paper presents a novel approach to classify the different patterns of PQ combined disturbances. The classification system consists of two parts, namely the feature extraction and the automatic recognition. In the feature extraction stage, Phase Space Reconstruction (PSR), a time series analysis tool, is utilized to construct disturbance signal trajectories. For these trajectories, several indices are proposed to form the feature vectors. Support Vector Machines (SVMs) are then implemented to recognize the different patterns and to evaluate the efficiencies. The types of disturbances discussed include a combination of short-term dis-turbances (voltage sags, swells) and long-term disturbances (flickers, harmonics), as well as their homologous single ones. The feasibilities of the proposed approach are verified by simulation with thousands of PQ events. Comparison studies based on Wavelet Transform (WT) and Artificial Neural Network (ANN) are also reported to show its advantages.展开更多
This paper presents the solution to the combined heat and power economic dispatch problem using a direct solution algorithm for constrained optimization problems. With the potential of Combined Heat and Power (CHP) pr...This paper presents the solution to the combined heat and power economic dispatch problem using a direct solution algorithm for constrained optimization problems. With the potential of Combined Heat and Power (CHP) production to increase the efficiency of power and heat generation simultaneously having been researched and established, the increasing penetration of CHP systems, and determination of economic dispatch of power and heat assumes higher relevance. The Combined Heat and Power Economic Dispatch (CHPED) problem is a demanding optimization problem as both constraints and objective functions can be non-linear and non-convex. This paper presents an explicit formula developed for computing the system-wide incremental costs corresponding with optimal dispatch. The circumvention of the use of iterative search schemes for this crucial step is the innovation inherent in the proposed dispatch procedure. The feasible operating region of the CHP unit three is taken into account in the proposed CHPED problem model, whereas the optimal dispatch of power/heat outputs of CHP unit is determined using the direct Lagrange multiplier solution algorithm. The proposed algorithm is applied to a test system with four units and results are provided.展开更多
To reduce the cost and increase the efficiency of plant genetic marker fingerprinting for variety discrimination,it is desirable to identify the optimal marker combinations.We describe a marker combination screening m...To reduce the cost and increase the efficiency of plant genetic marker fingerprinting for variety discrimination,it is desirable to identify the optimal marker combinations.We describe a marker combination screening model based on the genetic algorithm(GA)and implemented in a software tool,Loci Scan.Ratio-based variety discrimination power provided the largest optimization space among multiple fitness functions.Among GA parameters,an increase in population size and generation number enlarged optimization depth but also calculation workload.Exhaustive algorithm afforded the same optimization depth as GA but vastly increased calculation time.In comparison with two other software tools,Loci Scan accommodated missing data,reduced calculation time,and offered more fitness functions.In large datasets,the sample size of training data exerted the strongest influence on calculation time,whereas the marker size of training data showed no effect,and target marker number had limited effect on analysis speed.展开更多
To realize equal power splitting at two arbitrary gigahertz-frequencies, this paper presents a new type of Wilkinson dual frequency power divider, consisting of three-section transmission lines and a series RLC(resist...To realize equal power splitting at two arbitrary gigahertz-frequencies, this paper presents a new type of Wilkinson dual frequency power divider, consisting of three-section transmission lines and a series RLC(resistor, inductor and capacitor)circuit. By equating the [ABCD] matrix of the proposed circuit to that of the quarter-wave impedance transformer, coupled with even/odd mode analyses, the design equations of the proposed network are derived. For verification, two dual-frequency power dividers with dual-band operating frequencies at 0.6 GHz and 3.0 GHz, and 3.8 GHz and 10 GHz respectively are designed and simulated. Simulation results show that the dual-band ratio of the proposed power divider can be as large as 5. Comparisons of the simulation results at X-band and S-band with different power dividers indicate that the proposed dual-band power divider performs better under the scenario of the upper operating frequency extending to X-band.展开更多
In order to improve efficiency of a combined power system in which waste heat from exhaust gas could be efficiently recovered and cold energ^^ of liquefied natural gas (LNG) could be fully utilized as well. A system...In order to improve efficiency of a combined power system in which waste heat from exhaust gas could be efficiently recovered and cold energ^^ of liquefied natural gas (LNG) could be fully utilized as well. A system simulation and ther^nodynamic analysis were carried out, the Kalina cycle was reorganized by changing the concentration of “basic composition”, so that a better thermal matching in the heat exchanger could be obtained and the irreversibility of the system was decreased. It was found that the Kalina cycle generally used in the bottom of combined power cycle could also be used to recover the cold energy of LNG. The results show that the exergy efficiency of 42.97% is obtained. Compared with the previous system attained the exergy efficiency of 39.76%, the improved system has a better performance.展开更多
Recently, regression artificial neural networks are used to model various systems that have high dimensionality with nonlinear relations. The system under study must have enough dataset available to train the neural n...Recently, regression artificial neural networks are used to model various systems that have high dimensionality with nonlinear relations. The system under study must have enough dataset available to train the neural network. The aim of this work is to apply and experiment various options effects on feed-foreword artificial neural network (ANN) which used to obtain regression model that predicts electrical output power (EP) of combined cycle power plant based on 4 inputs. Dataset is obtained from an open online source. The work shows and explains the stochastic behavior of the regression neural, experiments the effect of number of neurons of the hidden layers. It shows also higher performance for larger training dataset size;at the other hand, it shows different effect of larger number of variables as input. In addition, two different training functions are applied and compared. Lastly, simple statistical study on the error between real values and estimated values using ANN is conducted, which shows the reliability of the model. This paper provides a quick reference to the effects of main parameters of regression neural networks.展开更多
This article presents the design and performance of a terahertz on-chip coupled-grounded coplanar waveguide(GCPW)power combiner using a 50μm-thick InP process.The proposed topology uses two coupled-GCPW lines at the ...This article presents the design and performance of a terahertz on-chip coupled-grounded coplanar waveguide(GCPW)power combiner using a 50μm-thick InP process.The proposed topology uses two coupled-GCPW lines at the end of the input port to substitute two quarter-wavelength GCPW lines,which is different from the conventional Wilkinson power combiner and can availably minimize the coverage area.According to the results obtained,for the frequency range of 210-250 GHz,the insertion losses for each two-way combiner and four-way combiner were lower than 1.05 dB and1.35 dB,respectively,and the in-band return losses were better than 11 dB.Moreover,the proposed on-chip GCPW-based combiners achieved a compromise in low-loss,broadband,and small-size,which can find wide applications in terahertz bands,such as power amplifiers and signal distribution networks.展开更多
As a potentially viable renewable energy, Enhanced Geothermal Systems(EGSs) extract heat from hot dry rock(HDR) reservoirs to produce electricity and heat, which promotes the progress towards carbon peaking and carbon...As a potentially viable renewable energy, Enhanced Geothermal Systems(EGSs) extract heat from hot dry rock(HDR) reservoirs to produce electricity and heat, which promotes the progress towards carbon peaking and carbon neutralization. The main challenge for EGSs is to reduce the investment cost. In the present study, thermo-economic investigations of EGS projects are conducted. The effects of geofluid mass flow rate, wellhead temperature and loss rate on the thermo-economic performance of the EGS organic Rankine cycle(ORC) are studied. A performance comparison between EGS-ORC and the EGS combined heating and power system(CHP) is presented. Considering the CO_(2)emission reduction benefits, the influence of carbon emission trading price on the levelized cost of energy(LCOE) is also presented. It is indicated that the geofluid mass flow rate is a critical parameter in dictating the success of a project. Under the assumed typical working conditions, the LCOE of EGS-ORC and EGS-CHP systems are 24.72 and 16.1 cents/k Wh, respectively. Compared with the EGS-ORC system, the LCOE of the EGS-CHP system is reduced by 35%. EGS-CHP systems have the potential to be economically viable in the future. With carbon emission trading prices of 12.76 USD/ton, the LCOE can be reduced by approximately 8.5%.展开更多
基金supported by MOST under Grant No.MOST 103-2221-E-002-050
文摘Analysis of the scattering parameters(S-parameters) of planar N-way metamaterial power dividers/combiners mostly uses commercial microwave circuit simulators due to the large circuit size involved. This paper presents an efficient circuit modeling approach, which is based on the multi-input and multi-output transmission matrix(T-matrix) method, to analyze the S-parameter of a planar nine-way metamaterial power-divider/combiner structure. S-parameter computation results are shown in good agreement with the simulation results by using the Agilent advanced design system(ADS) and measurement results. The computation time of an N-way metamaterial power divider/combiner with N=5, 9, 13, and 17 using T-matrix method is also compared with those of ADS and AWR Microwave Office(MWO) to demonstrate its computational efficiency.
基金Guangdong Province Key Laboratory of Efficient and Clean Energy Utilization(South China University of Technology)(2013A061401005)Research Fund(JMSWFW-2110-044)from Zhongshan Jiaming Electric Power Co.,Ltd.
文摘The determination of source-side extracted heating parameters is of great significance to the economic operation of cogeneration systems.This paper investigated the coupling performance of a cogeneration heating and power system multidimensionally based on the operating characteristics of the cogeneration units,the hydraulic and thermodynamic characteristics of the heating network,and the energy loads.Taking a steam network supported by a gas-steam combined cycle cogeneration system as the research case,the interaction effect among the source-side prime movers,the heating networks,and the terminal demand thermal parameters were investigated based on the designed values,the plant testing data,and the validated simulation.The operating maps of the gas-steam combined cycle cogeneration units were obtained using THERMOFLEX,and the minimum source-side steam parameters of the steam network were solved using an inverse solution procedure based on the hydro-thermodynamic coupling model.The cogeneration operating maps indicate that the available operating domain considerably narrows with the rise of the extraction steam pressure and flow rate.The heating network inverse solution demonstrates that the source-side steam pressure and temperature can be optimized from the originally designed 1.11 MPa and 238.8°C to 1.074 MPa and 191.15°C,respectively.Under the operating strategy with the minimum source-side heating parameters,the power peak regulation depth remarkably increases to 18.30%whereas the comprehensive thermal efficiency decreases.The operation under the minimum source-side heating steam parameters can be superior to the originally designed one in the economy at a higher price of the heating steam.At a fuel price of$0.38/kg and the power to fuel price of 0.18 kg/(kW·h),the critical price ratio of heating steam to fuel is 119.1 kg/t.The influence of the power-fuel price ratio on the economic deviation appears relatively weak.
基金a phased achievement of Gansu Province’s Major Science and Technology Project(19ZD2GA003)“Key Technologies and Demonstrative Applications of Market Consumption and Dispatching Control of Photothermal-Photovoltaic-Wind PowerNew Energy Base(Multi Energy System Optimization)”.
文摘Aiming at the problems of large-scale wind and solar grid connection,how to ensure the economy of system operation and how to realize fair scheduling between new energy power stations,a two-stage optimal dispatching model of wind power-photovoltaic-solar thermal combined system considering economic optimality and fairness is proposed.Firstly,the first stage dispatching model takes the overall economy optimization of the system as the goal and the principle of maximizing the consumption of wind and solar output,obtains the optimal output value under the economic conditions of each new energy station,and then obtains the maximum consumption space of the new energy station.Secondly,based on the optimization results of the first stage,the second stage dispatching model uses the dispatching method of fuzzy comprehensive ranking priority to prioritize the new energy stations,and then makes a fair allocation to the dispatching of the wind and solar stations.Finally,the analysis of a specific example shows that themodel can take into account the fairness of active power distribution of new energy stations on the basis of ensuring the economy of system operation,make full use of the consumption space,and realize the medium and long-term fairness distribution of dispatching plan.
文摘A miniaturized broadband Wilkinson power divider is proposed. Micro-strip branch lines are introduced to replace multiple resistors used in multi-stage Wilkinson power dividers to increase the bandwidth of single-stage Wilkinson power dividers. To demonstrate its performance, an improved single-stage Wilkinson power divider with four micro-strip branch lines was designed. Simulated results show that the insert loss is better than 3.2 dB, the input return loss, output return loss, and isolation are better than 15 dB respectively, across a 76% bandwidth from 18 to 40 GHz. .
文摘This paper briefs the configuration and performance of large size gas turbines and their composed combined cycle power plants designed and produced by four large renown gas turbine manufacturing firms in the world, providing reference for the relevant sectors and enterprises in importing advanced gas turbines and technologies.
文摘Iran’s removing subsidy from energy carrier in four years ago leads to spike electricity price dramatically. This abrupt change increases the interest on distributed generation (DG) because of its several benefits such as lower electricity generation price. In Iran among all type of DGs, because of wide natural gas network infrastructure and several incentives that government legislated to support combined cooling, heat and power (CCHP) investors, this type of technology is more prevalent in comparison with other technologies. Between existing CCHP technologies, certain economic choices are to be taken into account. For different buildings with different load curves, suitable size and operation of CCHP should be calculated to make the project more feasible. If CCHP does not well suited for a position, then the whole energy efficiency would be plunged significantly. In this paper, a model to find the optimal size and operation of CCHP and auxiliary boiler for any users is proposed by considering an integrated view of electricity and natural gas network using GAMS software. Then this method is applying for a hospital in Tehran as a real case study. Finally, by applying COMFAR III software, useful financial parameters and sensitivity analysis are calculated.
基金supported by National Basic Research Program of China(973 Program)(No.2014CB339900)National Natural Science Foundations of China(No.61422103,No.61671084,and No.61327806)
文摘In this paper,massive state-of-theart planar power dividers are presented and discussed. The innovations of these superiorly-performanced power dividers lie in the performance breakthrough,physical configurations and function integrations. Eventually,based on the trend presented,the future of the power dividers is predicted. This paper might have inspiration significance to illuminate the way for the development of power dividers.
基金Special Fund for IndustryUniversity and Research Cooperation(No.2011DFR61130)
文摘To improve the overall thermal efficiency of the organic Rankine cycle( ORC), a simulation study was carried out for a combined heat and power( CHP) system, using the Redlich-Kuang-Soave( RKS) equation of state. In the system,R245 fa was selected as the working fluid. A scroll expander was modeled with empirical isentropic expansion efficiency.Plate heat exchangers were selected as the evaporator and the condenser, and detailed heat transfer models were programmed for both one-phase and two-phase regions. Simulations were carried out at seven different heat source temperatures( 80,90, 100, 110, 120, 130, 140 ℃) in combination with eight different heat sink temperatures( 20, 25, 30, 35, 40, 45, 50,55 ℃). Results showthat in the ORC without an internal heat exchanger( IHE), the optimum cycle efficiencies are in the range of 7. 0% to 7. 3% when the temperature differences between the heat source and heat sink are in the range of 70 to90 ℃. Simulations on CHP reveal that domestic hot water can be produced when the heat sink inlet temperature is higher than40 ℃, and the corresponding exergy efficiency and overall thermal efficiency are 29% to 56% and 87% to 90% higher than those in the non-CHP ORC, respectively. It is found that the IHE has little effect on the improvement of work output and efficiencies for the CHP ORC.
基金Project supported by the National Key R&D Program of China(Grant No.2021YFC2203503)。
文摘The electromagnetic time-reversal(TR)technique has the characteristics of spatiotemporal focusing in a time-reversal cavity(TRC),which can be used for pulse compression,thus forming an electromagnetic pulse with high peak power.A time-reversed pulse-compression method in a single channel has high pulse compression gain.However,single channel pulse compression can only generate limited gain.This paper proposes a novel TR power-combination method in a multichannel TRC to obtain higher peak power based on TR pulse-compression theory.First,the TR power-combination model is given,and the crosstalk properties of the associated channel and the influence of the reversal performance are studied.Then,the power-combination performances for the TR pulse compression,such as combined signal to noise ratio(SNR)and combined compression gain,are analyzed by numerical simulation and experimental methods.The results show that the proposed method has obvious advantages over pulse-compression methods using a single channel cavity,and is more convenient for power combination.
文摘In this paper, two ultra-wide band power dividers are introduced. Compact equal power divider is considered firstly where an extended transmission lines and double open stubs are used in order to increase the bandwidth. Secondly, an unequal UWB power divider is introduced where multi-stage impedance is used. The proposed power dividers are fabricated and measured. The overall sizes of the proposed power dividers are 11.37 × 17.87 mm2 for the equal one and 12.13 × 29.03 mm2 for the unequal power divider. The simulated results are compared with the measured results and good agreement is obtained.
基金Project supported by the National Natural Science Foundation of China (Nos. 60577023 and 60378037), the National Basic Research Program (973) of China (No. 2004CB719802), China Postdoctoral Science Foundation, and Education Ministry Key Laboratory of Photoelectric Information Technology Science Foundation (No. 2005-20), China
文摘A new power divider, composed of a novel composite right/left-handed (CRLH) transmission line (TL) unit, is proposed. The properties of the power divider based on four CRLH TL unit cells are investigated theoretically. By adjusting the parameters of the capacitors and the inductors, the power divider shows perfectly symmetric power division at 5.13 GHz, return loss up to ?24 dB, with the transmitted power being close to ?3.1 dB. The phenomena are demonstrated by simulation results. Being compact in size and low-cost, the proposed power divider is very suitable for microwave and millimeter wave integrated circuits.
基金Project (No. 50437010) supported by the Key Program of the Na-tional Natural Science Foundation of China
文摘Power Quality (PQ) combined disturbances become common along with ubiquity of voltage flickers and harmonics. This paper presents a novel approach to classify the different patterns of PQ combined disturbances. The classification system consists of two parts, namely the feature extraction and the automatic recognition. In the feature extraction stage, Phase Space Reconstruction (PSR), a time series analysis tool, is utilized to construct disturbance signal trajectories. For these trajectories, several indices are proposed to form the feature vectors. Support Vector Machines (SVMs) are then implemented to recognize the different patterns and to evaluate the efficiencies. The types of disturbances discussed include a combination of short-term dis-turbances (voltage sags, swells) and long-term disturbances (flickers, harmonics), as well as their homologous single ones. The feasibilities of the proposed approach are verified by simulation with thousands of PQ events. Comparison studies based on Wavelet Transform (WT) and Artificial Neural Network (ANN) are also reported to show its advantages.
文摘This paper presents the solution to the combined heat and power economic dispatch problem using a direct solution algorithm for constrained optimization problems. With the potential of Combined Heat and Power (CHP) production to increase the efficiency of power and heat generation simultaneously having been researched and established, the increasing penetration of CHP systems, and determination of economic dispatch of power and heat assumes higher relevance. The Combined Heat and Power Economic Dispatch (CHPED) problem is a demanding optimization problem as both constraints and objective functions can be non-linear and non-convex. This paper presents an explicit formula developed for computing the system-wide incremental costs corresponding with optimal dispatch. The circumvention of the use of iterative search schemes for this crucial step is the innovation inherent in the proposed dispatch procedure. The feasible operating region of the CHP unit three is taken into account in the proposed CHPED problem model, whereas the optimal dispatch of power/heat outputs of CHP unit is determined using the direct Lagrange multiplier solution algorithm. The proposed algorithm is applied to a test system with four units and results are provided.
基金supported by the Scientific and Technological Innovation 2030 Major Project(2022ZD04019)the Science and Technology Innovation Capacity Building Project of BAAFS(KJCX20230303)+1 种基金Hainan Province Science and Technology Special Fund(ZDYF2023XDNY077)the Beijing Scholars Program(BSP041)。
文摘To reduce the cost and increase the efficiency of plant genetic marker fingerprinting for variety discrimination,it is desirable to identify the optimal marker combinations.We describe a marker combination screening model based on the genetic algorithm(GA)and implemented in a software tool,Loci Scan.Ratio-based variety discrimination power provided the largest optimization space among multiple fitness functions.Among GA parameters,an increase in population size and generation number enlarged optimization depth but also calculation workload.Exhaustive algorithm afforded the same optimization depth as GA but vastly increased calculation time.In comparison with two other software tools,Loci Scan accommodated missing data,reduced calculation time,and offered more fitness functions.In large datasets,the sample size of training data exerted the strongest influence on calculation time,whereas the marker size of training data showed no effect,and target marker number had limited effect on analysis speed.
文摘To realize equal power splitting at two arbitrary gigahertz-frequencies, this paper presents a new type of Wilkinson dual frequency power divider, consisting of three-section transmission lines and a series RLC(resistor, inductor and capacitor)circuit. By equating the [ABCD] matrix of the proposed circuit to that of the quarter-wave impedance transformer, coupled with even/odd mode analyses, the design equations of the proposed network are derived. For verification, two dual-frequency power dividers with dual-band operating frequencies at 0.6 GHz and 3.0 GHz, and 3.8 GHz and 10 GHz respectively are designed and simulated. Simulation results show that the dual-band ratio of the proposed power divider can be as large as 5. Comparisons of the simulation results at X-band and S-band with different power dividers indicate that the proposed dual-band power divider performs better under the scenario of the upper operating frequency extending to X-band.
基金Sponsored by the Liaoning Provincial Science and Technology Program Project(Grant No.2012219024)
文摘In order to improve efficiency of a combined power system in which waste heat from exhaust gas could be efficiently recovered and cold energ^^ of liquefied natural gas (LNG) could be fully utilized as well. A system simulation and ther^nodynamic analysis were carried out, the Kalina cycle was reorganized by changing the concentration of “basic composition”, so that a better thermal matching in the heat exchanger could be obtained and the irreversibility of the system was decreased. It was found that the Kalina cycle generally used in the bottom of combined power cycle could also be used to recover the cold energy of LNG. The results show that the exergy efficiency of 42.97% is obtained. Compared with the previous system attained the exergy efficiency of 39.76%, the improved system has a better performance.
文摘Recently, regression artificial neural networks are used to model various systems that have high dimensionality with nonlinear relations. The system under study must have enough dataset available to train the neural network. The aim of this work is to apply and experiment various options effects on feed-foreword artificial neural network (ANN) which used to obtain regression model that predicts electrical output power (EP) of combined cycle power plant based on 4 inputs. Dataset is obtained from an open online source. The work shows and explains the stochastic behavior of the regression neural, experiments the effect of number of neurons of the hidden layers. It shows also higher performance for larger training dataset size;at the other hand, it shows different effect of larger number of variables as input. In addition, two different training functions are applied and compared. Lastly, simple statistical study on the error between real values and estimated values using ANN is conducted, which shows the reliability of the model. This paper provides a quick reference to the effects of main parameters of regression neural networks.
基金Project supported in part by the National Natural Science Foundation of China(Grant No.61871072)。
文摘This article presents the design and performance of a terahertz on-chip coupled-grounded coplanar waveguide(GCPW)power combiner using a 50μm-thick InP process.The proposed topology uses two coupled-GCPW lines at the end of the input port to substitute two quarter-wavelength GCPW lines,which is different from the conventional Wilkinson power combiner and can availably minimize the coverage area.According to the results obtained,for the frequency range of 210-250 GHz,the insertion losses for each two-way combiner and four-way combiner were lower than 1.05 dB and1.35 dB,respectively,and the in-band return losses were better than 11 dB.Moreover,the proposed on-chip GCPW-based combiners achieved a compromise in low-loss,broadband,and small-size,which can find wide applications in terahertz bands,such as power amplifiers and signal distribution networks.
基金financial support provided by the National Key Research and Development Program of China(No.2018YFB1501805)China Geological Survey Project(Grant No.DD2019135,and No.DD20211336)。
文摘As a potentially viable renewable energy, Enhanced Geothermal Systems(EGSs) extract heat from hot dry rock(HDR) reservoirs to produce electricity and heat, which promotes the progress towards carbon peaking and carbon neutralization. The main challenge for EGSs is to reduce the investment cost. In the present study, thermo-economic investigations of EGS projects are conducted. The effects of geofluid mass flow rate, wellhead temperature and loss rate on the thermo-economic performance of the EGS organic Rankine cycle(ORC) are studied. A performance comparison between EGS-ORC and the EGS combined heating and power system(CHP) is presented. Considering the CO_(2)emission reduction benefits, the influence of carbon emission trading price on the levelized cost of energy(LCOE) is also presented. It is indicated that the geofluid mass flow rate is a critical parameter in dictating the success of a project. Under the assumed typical working conditions, the LCOE of EGS-ORC and EGS-CHP systems are 24.72 and 16.1 cents/k Wh, respectively. Compared with the EGS-ORC system, the LCOE of the EGS-CHP system is reduced by 35%. EGS-CHP systems have the potential to be economically viable in the future. With carbon emission trading prices of 12.76 USD/ton, the LCOE can be reduced by approximately 8.5%.
基金supported by Major International(Regional)Joint Research Project of the National Natural Science Foundation of China(61320106011)National High Technology Research and Development Program of China(863 Program)(2014AA052802)National Natural Science Foundation of China(61573224)