In order to meet the requirements of Decree of the State Council of the People's Republic of China (No.599), this paper presents a three-defense line coordination strategy based on the Decree of the State Council ...In order to meet the requirements of Decree of the State Council of the People's Republic of China (No.599), this paper presents a three-defense line coordination strategy based on the Decree of the State Council (No.599). Taking the Guizhou power grid of 220 kV&500 kV as an example, the security and stability problem of the Guizhou power grid is analyzed. The strategy using three-defense line coordination for lowering the level of electricity safety accidents is researched. The analysis results show that the proposed coordination strategy is feasible, which can lower the level of electricity safety accidents under the same fault in same operation mode. Through studying the three-defense line of the Guizhou power grid, this paper presents a basic idea of the three-defense line coordination strategy based on the Decree of the State Council (No.599). The three-defense line coordination strategy provides reference for other provinces power grid.展开更多
In the past decade,several efforts around the world were started with the goal of introducing "smart metering" capabilities into the power grid.These efforts have spurred renewed interest in the design of ne...In the past decade,several efforts around the world were started with the goal of introducing "smart metering" capabilities into the power grid.These efforts have spurred renewed interest in the design of next generation Narrowband Power Line Communications(NB-PLC) transceivers.In the past few years,ITU-T and IEEE have standardized a family of next generation OFDM-based NB-PLC transceivers some of which are today being considered for massive deployments in Europe and Asia.This paper addresses the important role that PLC has not only for smart metering but also for many other Smart Grid applications,and also gives an overview of the main differences between these next generation NB-PLC standards.展开更多
To address the issue of climate change caused by the use of polluting, non-renewable energy sources, the use of renewable energy has gained momentum worldwide. Consequently, the increased integration of renewable ener...To address the issue of climate change caused by the use of polluting, non-renewable energy sources, the use of renewable energy has gained momentum worldwide. Consequently, the increased integration of renewable energy sources into power grids has necessitated the inclusion of flexible capacities in the power systems to solve problems of intermittent and fluctuating characteristics associated with renewable generation outputs. In this work, we study the regulating cost of a power system with high renewable penetration using an improved time-series system production simulation analysis method. The operational cost of the system is considered as the objective function. Three different methods to increase regulating capacities, including using interconnection lines, building additional flexible power capacities, and retrofitting existing thermal power plants, are adopted and simulated to compare the costs of accommodating renewable energy in the system in these cases. Our results indicate that increasing the flexibility of thermal power plants and developing crossregional connection lines are cost-effective methods of increasing renewable energy consumption.展开更多
Based on conventional static line rating method, the actual current carrying capability of overhead conductors cannot be judged. Due to continuous increment in electricity demand and the difficulties associated with n...Based on conventional static line rating method, the actual current carrying capability of overhead conductors cannot be judged. Due to continuous increment in electricity demand and the difficulties associated with new line constructions, the overhead lines are therefore required to be rated based on a method that should establish their real-time capability in terms of electricity transmission. The method used to determine the real-time ampacity of overhead conductors not only can enhance their transmission capacity but can also help in allowing excessive renewable generation in the electricity network. In this research work, the issues related to analyzing an impact of wind power on periodical loading of overhead line as well as finding its static and dynamic ampacities with line current are investigated in detail. Moreover, the investigation related to finding a suitable location for the construction of a 60 MW wind farm is taken on board. Thereafter, the wind park is integrated with a regional grid, owned by Fortum Distribution AB. In addition to that, the electricity generated from the wind park is also calculated in this project. Later on, the work is devoted to finding the static and dynamic line ratings for “VL3” overhead conductor by using IEEE-738-2006 standard. Furthermore, the project also deals with finding the line current and making its comparison with maximum capacity of overhead conductor (VL3) for loading it in such a way that no any violation of safe ground clearance requirements is observed at all. Besides, the line current, knowing the conductor temperature when it transmits the required electricity in the presence of wind power generation is also an important factor to be taken into consideration. Therefore, based on real-time ambient conditions with actual line loading and with the help of IEEE-738-2006 standard, the conductor temperature is also calculated in this project. At the end, an economic analysis is performed to evaluate the financial advantages related to applying the dynamic line ratings approach in place of traditional static line ratings technique across an overhead conductor (VL3) and to know how much beneficial it is to temporarily postpone the rebuilding and/or construction of a new transmission line. Furthermore, an economic analysis related to wind power system is taken into consideration as well to get familiar with the costs related to building and connecting a 60 MW wind farm with the regional grid.展开更多
The existing liability division methods for harmonic pollution are either inexplicit or incomplete in physical meaning. To compensate these defects, two new methods are proposed based on line-transferred power compone...The existing liability division methods for harmonic pollution are either inexplicit or incomplete in physical meaning. To compensate these defects, two new methods are proposed based on line-transferred power components in this paper. At first, all harmonic sources are represented by ideal equivalent current source, line current components and bus voltage components of a source are determined by stimulation of this source with all other sources disabled. Then, the line-trans- ferred power component owing to a source under all sources action together is determined by the theory of line-transferred power components, and called source’s line-transferred power component. At last, the liability of a source for line-end harmonic pollution is divided by two methods: the ration of the source’s line-transferred active power component to the total line-transferred power, and the ration of projection of the source’s line-transferred complex power component to absolute value of the total line-transferred complex power. These two methods are taken into account not only harmonic voltage but also harmonic current in the liability division. Simulation results show that the proposed liability division method based on active power component is the most effective and ideal one.展开更多
Broadband over Power Line (BPL) is an alternative means of providing high-speed Internet access, Voice over Internet Protocol (VoIP), and other broadband services to homes and businesses by using the existing medium v...Broadband over Power Line (BPL) is an alternative means of providing high-speed Internet access, Voice over Internet Protocol (VoIP), and other broadband services to homes and businesses by using the existing medium voltage (MV) and low voltage (LV) power lines. This paper provides a comprehensive understanding about BPL with its implementation prospects. In this context, the existing power grid infrastructures are discussed elaborately. BPL system functionality with its components and its benefits over other access technologies is also pointed out. Implementation scenarios for various deployment options are illustrated here. The different implementation challenges for BPL system, such as the characteristics of power lines, attenuation problem, noise, potential interference with the other radio frequencies are also presented with their remedies. Comparative analysis between several broadband access technologies shows the feasibility of BPL deployments all over the world.展开更多
文摘In order to meet the requirements of Decree of the State Council of the People's Republic of China (No.599), this paper presents a three-defense line coordination strategy based on the Decree of the State Council (No.599). Taking the Guizhou power grid of 220 kV&500 kV as an example, the security and stability problem of the Guizhou power grid is analyzed. The strategy using three-defense line coordination for lowering the level of electricity safety accidents is researched. The analysis results show that the proposed coordination strategy is feasible, which can lower the level of electricity safety accidents under the same fault in same operation mode. Through studying the three-defense line of the Guizhou power grid, this paper presents a basic idea of the three-defense line coordination strategy based on the Decree of the State Council (No.599). The three-defense line coordination strategy provides reference for other provinces power grid.
文摘In the past decade,several efforts around the world were started with the goal of introducing "smart metering" capabilities into the power grid.These efforts have spurred renewed interest in the design of next generation Narrowband Power Line Communications(NB-PLC) transceivers.In the past few years,ITU-T and IEEE have standardized a family of next generation OFDM-based NB-PLC transceivers some of which are today being considered for massive deployments in Europe and Asia.This paper addresses the important role that PLC has not only for smart metering but also for many other Smart Grid applications,and also gives an overview of the main differences between these next generation NB-PLC standards.
基金supported by National Key Research and Development Programe of China (No.2018YFB0904000)the State Grid Science & Technology Project (Title: Northeast Asia Power Grid Interconnection Feasibility Study)
文摘To address the issue of climate change caused by the use of polluting, non-renewable energy sources, the use of renewable energy has gained momentum worldwide. Consequently, the increased integration of renewable energy sources into power grids has necessitated the inclusion of flexible capacities in the power systems to solve problems of intermittent and fluctuating characteristics associated with renewable generation outputs. In this work, we study the regulating cost of a power system with high renewable penetration using an improved time-series system production simulation analysis method. The operational cost of the system is considered as the objective function. Three different methods to increase regulating capacities, including using interconnection lines, building additional flexible power capacities, and retrofitting existing thermal power plants, are adopted and simulated to compare the costs of accommodating renewable energy in the system in these cases. Our results indicate that increasing the flexibility of thermal power plants and developing crossregional connection lines are cost-effective methods of increasing renewable energy consumption.
文摘Based on conventional static line rating method, the actual current carrying capability of overhead conductors cannot be judged. Due to continuous increment in electricity demand and the difficulties associated with new line constructions, the overhead lines are therefore required to be rated based on a method that should establish their real-time capability in terms of electricity transmission. The method used to determine the real-time ampacity of overhead conductors not only can enhance their transmission capacity but can also help in allowing excessive renewable generation in the electricity network. In this research work, the issues related to analyzing an impact of wind power on periodical loading of overhead line as well as finding its static and dynamic ampacities with line current are investigated in detail. Moreover, the investigation related to finding a suitable location for the construction of a 60 MW wind farm is taken on board. Thereafter, the wind park is integrated with a regional grid, owned by Fortum Distribution AB. In addition to that, the electricity generated from the wind park is also calculated in this project. Later on, the work is devoted to finding the static and dynamic line ratings for “VL3” overhead conductor by using IEEE-738-2006 standard. Furthermore, the project also deals with finding the line current and making its comparison with maximum capacity of overhead conductor (VL3) for loading it in such a way that no any violation of safe ground clearance requirements is observed at all. Besides, the line current, knowing the conductor temperature when it transmits the required electricity in the presence of wind power generation is also an important factor to be taken into consideration. Therefore, based on real-time ambient conditions with actual line loading and with the help of IEEE-738-2006 standard, the conductor temperature is also calculated in this project. At the end, an economic analysis is performed to evaluate the financial advantages related to applying the dynamic line ratings approach in place of traditional static line ratings technique across an overhead conductor (VL3) and to know how much beneficial it is to temporarily postpone the rebuilding and/or construction of a new transmission line. Furthermore, an economic analysis related to wind power system is taken into consideration as well to get familiar with the costs related to building and connecting a 60 MW wind farm with the regional grid.
文摘The existing liability division methods for harmonic pollution are either inexplicit or incomplete in physical meaning. To compensate these defects, two new methods are proposed based on line-transferred power components in this paper. At first, all harmonic sources are represented by ideal equivalent current source, line current components and bus voltage components of a source are determined by stimulation of this source with all other sources disabled. Then, the line-trans- ferred power component owing to a source under all sources action together is determined by the theory of line-transferred power components, and called source’s line-transferred power component. At last, the liability of a source for line-end harmonic pollution is divided by two methods: the ration of the source’s line-transferred active power component to the total line-transferred power, and the ration of projection of the source’s line-transferred complex power component to absolute value of the total line-transferred complex power. These two methods are taken into account not only harmonic voltage but also harmonic current in the liability division. Simulation results show that the proposed liability division method based on active power component is the most effective and ideal one.
文摘Broadband over Power Line (BPL) is an alternative means of providing high-speed Internet access, Voice over Internet Protocol (VoIP), and other broadband services to homes and businesses by using the existing medium voltage (MV) and low voltage (LV) power lines. This paper provides a comprehensive understanding about BPL with its implementation prospects. In this context, the existing power grid infrastructures are discussed elaborately. BPL system functionality with its components and its benefits over other access technologies is also pointed out. Implementation scenarios for various deployment options are illustrated here. The different implementation challenges for BPL system, such as the characteristics of power lines, attenuation problem, noise, potential interference with the other radio frequencies are also presented with their remedies. Comparative analysis between several broadband access technologies shows the feasibility of BPL deployments all over the world.