After the integration of large-scale DistributedGeneration(DG)into the distribution network,the randomness and volatility of its output result in a reduction of spatiotemporal alignment between power generation and de...After the integration of large-scale DistributedGeneration(DG)into the distribution network,the randomness and volatility of its output result in a reduction of spatiotemporal alignment between power generation and demand in the distribution network,exacerbating the phenomenon of wind and solar power wastage.As a novel power system model,the fundamental concept of Regional Autonomous Power Grids(RAPGs)is to achieve localized management and energy autonomy,thereby facilitating the effective consumption of DGs.Therefore,this paper proposes a distributed resource planning strategy that enhances the autonomy capabilities of regional power grids by considering multiple evaluation indexes for autonomy.First,a regional Energy Storage(ES)configuration strategy is proposed.This strategy can select a suitable reference value for the upper limit of ES configuration based on the regional load andDGoutput to maximize the elimination of source load deviations in the region as the upper limit constraint of ES capacity.Then,a control strategy for regional ES is proposed,the charging and discharging reference line of ES is set,and multiple autonomy and economic indexes are used as objective functions to select different proportions of ES to control the distributed resources of the regional power grid and establish evaluation indexes of the internal regional generation and load power ratio,the proportion of power supply matching hours,new energy consumption rate and tie line power imbalance outside the region to evaluate changes in the regional autonomy capabilities.The final simulation results showthat in the real regional grid example,the planning method in the planning year in the region of the overall power supply matching hour ratio and new energy consumption rate increased by 3.9%and 4.8%on average,and the power imbalance of the tie line decreased by 7.8%on average.The proposed planning approach enables the maximization of regional autonomy while effectively smoothing the fluctuation of power exchange between the regional grid and the higher-level grid.This presents a rational and effective planning solution for the regional grid,facilitating the coordinated development between the region and the distribution network.展开更多
A distribution network plays an extremely important role in the safe and efficient operation of a power grid.As the core part of a power grid’s operation,a distribution network will have a significant impact on the s...A distribution network plays an extremely important role in the safe and efficient operation of a power grid.As the core part of a power grid’s operation,a distribution network will have a significant impact on the safety and reliability of residential electricity consumption.it is necessary to actively plan and modify the distribution network’s structure in the power grid,improve the quality of the distribution network,and optimize the planning of the distribution network,so that the network can be fully utilized to meet the needs of electricity consumption.In this paper,a distribution network grid planning algorithm based on the reliability of electricity consumption was completed using ant colony algorithm.For the distribution network structure planning of dual power sources,the parallel ant colony algorithm was used to prove that the premise of parallelism is the interactive process of ant colonies,and the dual power distribution network structure model is established based on the principle of the lowest cost.The artificial ants in the algorithm were compared with real ants in nature,and the basic steps and working principle of the ant colony optimization algorithm was studied with the help of the travelling salesman problem(TSP).Then,the limitations of the ant colony algorithm were analyzed,and an improvement strategy was proposed by using python for digital simulation.The results demonstrated the reliability of model-building and algorithm improvement.展开更多
The planning environmental impact assessment (EIA) of transmission and transformation power grid at levels of 500 and 220 kV had been finished completely in the 13 municipalities of Jiangsu Province by the end of 20...The planning environmental impact assessment (EIA) of transmission and transformation power grid at levels of 500 and 220 kV had been finished completely in the 13 municipalities of Jiangsu Province by the end of 2012, which played important roles in guiding and planning the following transmission and transformation projects in environmental protection. In this paper, through the detail analysis on the objective and significance of the planning EIA of transmission and transformation power grid, legal basis and planning EIA practices, some suggestions and thinking about the planning EIA of transmission and transformation power grid were put forward.展开更多
Given the increasing uncertainties in power supply and load,this paper proposes the concept of power source and grid coordination uniformity planning.In this approach,the standard deviation of the transmission line lo...Given the increasing uncertainties in power supply and load,this paper proposes the concept of power source and grid coordination uniformity planning.In this approach,the standard deviation of the transmission line load rate is considered as the uniformity evaluation index for power source and grid planning.A multi-stage and multi-objective optimization model of the power source and grid expansion planning is established to minimize the comprehensive cost of the entire planning cycle.In this study,the improved particle swarm optimization algorithm and genetic algorithm are combined to solve the model,thus improving the efficiency and accuracy of the solution.The analysis of a simple IEEE Garver’s 6-node system shows that the model and solution method are effective and feasible.Moreover,they are suitable for the coordinated planning of the power source and grid under a diversified nature of power supply and load.展开更多
At present,the plan environmental impact assessment of power transmission and transformation grid is relatively mature. How to further improve the quality of plan environmental impact assessment of power grid during t...At present,the plan environmental impact assessment of power transmission and transformation grid is relatively mature. How to further improve the quality of plan environmental impact assessment of power grid during the "14^(th) Five-Year Plan" period is very important. In this paper,the plan environmental impact assessment of power grid in the Development Plan for Power Grid in Nanjing during the "13^(th) Five-Year Plan" Period is studied to further discuss the ideas,evaluation system and content framework of plan environmental impact assessment of power grid.展开更多
China Electricity Council organized competent authorities across the industry of electric power to work out the "Research Reports on the 12^th Five-Year Plan for Electric" Power lndustry "" in nearly one year, whi...China Electricity Council organized competent authorities across the industry of electric power to work out the "Research Reports on the 12^th Five-Year Plan for Electric" Power lndustry "" in nearly one year, which provides a reference/or governmental departments to formulate the 12^th Five-Year Plan on energy and electric power industry. The magazine should publish the serial reports inchliding power sources, power grids, equipment manufacture, energy and environment, and power economics. This paper presents the part of " power grids, " in which the strategies of developing power grids are put forward.展开更多
On the basis of summing up the development of electric power industry in the 10th Five-Year Plan period, the idea of electric power development planning from 2006 to 2020 is presented. The authors analyzed ten main pr...On the basis of summing up the development of electric power industry in the 10th Five-Year Plan period, the idea of electric power development planning from 2006 to 2020 is presented. The authors analyzed ten main problems that existed in electric development during the 10th Five-Year Plan period, forecasted the electricity generation from 2006 to 2020, put forward the development strategy of power industry, discussed the component and development program of hydropower, thermal power, nuclear power, natural gas power and renewable power, outlined the present situations of six regional power grids, power transmission from western to eastern regions, UHV AC/DC power transmission and nationwide power grid interconnections, and finally gave out seven suggestions about electric power development in the future.展开更多
In this paper the growing process of China power grid from formation of local power grids to nationwide interconnection is reviewed. The scale and structure of power grid construction in the near future, especially th...In this paper the growing process of China power grid from formation of local power grids to nationwide interconnection is reviewed. The scale and structure of power grid construction in the near future, especially the planning on sending power from west to east, North-South supplementation and nationwide interconnection are introduced. In addition, the technologies to be extended in future grid development are briefed, such as HVDC, FACTS and compact transmission line, etc.展开更多
The safety and stability study on Northeast, North, East, Northwest and Central China power grids had been carried out, which provided technical supports to planning design of regional power grids. By analyzing safety...The safety and stability study on Northeast, North, East, Northwest and Central China power grids had been carried out, which provided technical supports to planning design of regional power grids. By analyzing safety and stability under severe faults in regional power grids, revealed weaknesses on power grid configurations and measures for preventing from loss of stability were presented. In comparison of various schemes of power system safety and stability among parts of power grids, more than two recommended schemes can be chosen as reference in planning design for regional power grids. Considering the safety and stability control measures necessary for each power grids, it is believed the trunk networks of all power grids can fulfill the third criteria of Guideline for Power System Safety and Stability, while the weakness and predominated hydropower may deteriorate safety and stability of power grids. The power grid shall be regulated in line with the variation of boundary conditions.展开更多
In this paper the basic situation of the Northwest Region in China is introduced, the necessity for the Northwest Power Grid to develop 750 kV transmission line is analyzed, and the target for the power grid construct...In this paper the basic situation of the Northwest Region in China is introduced, the necessity for the Northwest Power Grid to develop 750 kV transmission line is analyzed, and the target for the power grid construction till 2010 as well as the planning for sending power from west to east and interconnection with adjacent grids are described.展开更多
The reasonability of the adopted capacity load ratio numerical value in urban power grid planning determines the economy of planning level yearly power grid.Too large capacity load ratio will result in the increasing ...The reasonability of the adopted capacity load ratio numerical value in urban power grid planning determines the economy of planning level yearly power grid.Too large capacity load ratio will result in the increasing investment in the early period of power grid construction, however, too small capacity load ratio will make the power grid have poor adaptability, affecting the power supply. Reasonably determining the adopted regional power grid capacity load ratio quantitative numerical value in planning has a strong guiding significance for constructing reliable and economic power grid and preventing power grid from excessive advance or lagging behind the load development. This paper, through the statistics and analysis of a certain regional power grid 2010-2012 three years' power grid daily load characteristics and the investment benefit evaluation of three years' 220KV power grid individual project, makes a preliminary analysis and puts forwards the specific advice on the reasonable values of power ~rid 35-220KV power transformation capacity load ratio.展开更多
基金supported by the State Grid Henan Economic Research Institute Science and Technology Project“Calculation and Demonstration of Distributed Photovoltaic Open Capacity Based on Multi-Source Heterogeneous Data”(5217L0230013).
文摘After the integration of large-scale DistributedGeneration(DG)into the distribution network,the randomness and volatility of its output result in a reduction of spatiotemporal alignment between power generation and demand in the distribution network,exacerbating the phenomenon of wind and solar power wastage.As a novel power system model,the fundamental concept of Regional Autonomous Power Grids(RAPGs)is to achieve localized management and energy autonomy,thereby facilitating the effective consumption of DGs.Therefore,this paper proposes a distributed resource planning strategy that enhances the autonomy capabilities of regional power grids by considering multiple evaluation indexes for autonomy.First,a regional Energy Storage(ES)configuration strategy is proposed.This strategy can select a suitable reference value for the upper limit of ES configuration based on the regional load andDGoutput to maximize the elimination of source load deviations in the region as the upper limit constraint of ES capacity.Then,a control strategy for regional ES is proposed,the charging and discharging reference line of ES is set,and multiple autonomy and economic indexes are used as objective functions to select different proportions of ES to control the distributed resources of the regional power grid and establish evaluation indexes of the internal regional generation and load power ratio,the proportion of power supply matching hours,new energy consumption rate and tie line power imbalance outside the region to evaluate changes in the regional autonomy capabilities.The final simulation results showthat in the real regional grid example,the planning method in the planning year in the region of the overall power supply matching hour ratio and new energy consumption rate increased by 3.9%and 4.8%on average,and the power imbalance of the tie line decreased by 7.8%on average.The proposed planning approach enables the maximization of regional autonomy while effectively smoothing the fluctuation of power exchange between the regional grid and the higher-level grid.This presents a rational and effective planning solution for the regional grid,facilitating the coordinated development between the region and the distribution network.
文摘A distribution network plays an extremely important role in the safe and efficient operation of a power grid.As the core part of a power grid’s operation,a distribution network will have a significant impact on the safety and reliability of residential electricity consumption.it is necessary to actively plan and modify the distribution network’s structure in the power grid,improve the quality of the distribution network,and optimize the planning of the distribution network,so that the network can be fully utilized to meet the needs of electricity consumption.In this paper,a distribution network grid planning algorithm based on the reliability of electricity consumption was completed using ant colony algorithm.For the distribution network structure planning of dual power sources,the parallel ant colony algorithm was used to prove that the premise of parallelism is the interactive process of ant colonies,and the dual power distribution network structure model is established based on the principle of the lowest cost.The artificial ants in the algorithm were compared with real ants in nature,and the basic steps and working principle of the ant colony optimization algorithm was studied with the help of the travelling salesman problem(TSP).Then,the limitations of the ant colony algorithm were analyzed,and an improvement strategy was proposed by using python for digital simulation.The results demonstrated the reliability of model-building and algorithm improvement.
基金Supported by the National Key Technology R&D Program(2012BAC20B1003)the Key National Social Science Fund Project(12&ZD214)the Special Fund Project for the Scientific Research of the Environmental Protection Welfare Industry(201209001)
文摘The planning environmental impact assessment (EIA) of transmission and transformation power grid at levels of 500 and 220 kV had been finished completely in the 13 municipalities of Jiangsu Province by the end of 2012, which played important roles in guiding and planning the following transmission and transformation projects in environmental protection. In this paper, through the detail analysis on the objective and significance of the planning EIA of transmission and transformation power grid, legal basis and planning EIA practices, some suggestions and thinking about the planning EIA of transmission and transformation power grid were put forward.
基金supported by Theoretical study of power system synergistic dispatch National Science Foundation of China(51477091).
文摘Given the increasing uncertainties in power supply and load,this paper proposes the concept of power source and grid coordination uniformity planning.In this approach,the standard deviation of the transmission line load rate is considered as the uniformity evaluation index for power source and grid planning.A multi-stage and multi-objective optimization model of the power source and grid expansion planning is established to minimize the comprehensive cost of the entire planning cycle.In this study,the improved particle swarm optimization algorithm and genetic algorithm are combined to solve the model,thus improving the efficiency and accuracy of the solution.The analysis of a simple IEEE Garver’s 6-node system shows that the model and solution method are effective and feasible.Moreover,they are suitable for the coordinated planning of the power source and grid under a diversified nature of power supply and load.
文摘At present,the plan environmental impact assessment of power transmission and transformation grid is relatively mature. How to further improve the quality of plan environmental impact assessment of power grid during the "14^(th) Five-Year Plan" period is very important. In this paper,the plan environmental impact assessment of power grid in the Development Plan for Power Grid in Nanjing during the "13^(th) Five-Year Plan" Period is studied to further discuss the ideas,evaluation system and content framework of plan environmental impact assessment of power grid.
文摘China Electricity Council organized competent authorities across the industry of electric power to work out the "Research Reports on the 12^th Five-Year Plan for Electric" Power lndustry "" in nearly one year, which provides a reference/or governmental departments to formulate the 12^th Five-Year Plan on energy and electric power industry. The magazine should publish the serial reports inchliding power sources, power grids, equipment manufacture, energy and environment, and power economics. This paper presents the part of " power grids, " in which the strategies of developing power grids are put forward.
文摘On the basis of summing up the development of electric power industry in the 10th Five-Year Plan period, the idea of electric power development planning from 2006 to 2020 is presented. The authors analyzed ten main problems that existed in electric development during the 10th Five-Year Plan period, forecasted the electricity generation from 2006 to 2020, put forward the development strategy of power industry, discussed the component and development program of hydropower, thermal power, nuclear power, natural gas power and renewable power, outlined the present situations of six regional power grids, power transmission from western to eastern regions, UHV AC/DC power transmission and nationwide power grid interconnections, and finally gave out seven suggestions about electric power development in the future.
文摘In this paper the growing process of China power grid from formation of local power grids to nationwide interconnection is reviewed. The scale and structure of power grid construction in the near future, especially the planning on sending power from west to east, North-South supplementation and nationwide interconnection are introduced. In addition, the technologies to be extended in future grid development are briefed, such as HVDC, FACTS and compact transmission line, etc.
文摘The safety and stability study on Northeast, North, East, Northwest and Central China power grids had been carried out, which provided technical supports to planning design of regional power grids. By analyzing safety and stability under severe faults in regional power grids, revealed weaknesses on power grid configurations and measures for preventing from loss of stability were presented. In comparison of various schemes of power system safety and stability among parts of power grids, more than two recommended schemes can be chosen as reference in planning design for regional power grids. Considering the safety and stability control measures necessary for each power grids, it is believed the trunk networks of all power grids can fulfill the third criteria of Guideline for Power System Safety and Stability, while the weakness and predominated hydropower may deteriorate safety and stability of power grids. The power grid shall be regulated in line with the variation of boundary conditions.
文摘In this paper the basic situation of the Northwest Region in China is introduced, the necessity for the Northwest Power Grid to develop 750 kV transmission line is analyzed, and the target for the power grid construction till 2010 as well as the planning for sending power from west to east and interconnection with adjacent grids are described.
文摘The reasonability of the adopted capacity load ratio numerical value in urban power grid planning determines the economy of planning level yearly power grid.Too large capacity load ratio will result in the increasing investment in the early period of power grid construction, however, too small capacity load ratio will make the power grid have poor adaptability, affecting the power supply. Reasonably determining the adopted regional power grid capacity load ratio quantitative numerical value in planning has a strong guiding significance for constructing reliable and economic power grid and preventing power grid from excessive advance or lagging behind the load development. This paper, through the statistics and analysis of a certain regional power grid 2010-2012 three years' power grid daily load characteristics and the investment benefit evaluation of three years' 220KV power grid individual project, makes a preliminary analysis and puts forwards the specific advice on the reasonable values of power ~rid 35-220KV power transformation capacity load ratio.