A distribution network plays an extremely important role in the safe and efficient operation of a power grid.As the core part of a power grid’s operation,a distribution network will have a significant impact on the s...A distribution network plays an extremely important role in the safe and efficient operation of a power grid.As the core part of a power grid’s operation,a distribution network will have a significant impact on the safety and reliability of residential electricity consumption.it is necessary to actively plan and modify the distribution network’s structure in the power grid,improve the quality of the distribution network,and optimize the planning of the distribution network,so that the network can be fully utilized to meet the needs of electricity consumption.In this paper,a distribution network grid planning algorithm based on the reliability of electricity consumption was completed using ant colony algorithm.For the distribution network structure planning of dual power sources,the parallel ant colony algorithm was used to prove that the premise of parallelism is the interactive process of ant colonies,and the dual power distribution network structure model is established based on the principle of the lowest cost.The artificial ants in the algorithm were compared with real ants in nature,and the basic steps and working principle of the ant colony optimization algorithm was studied with the help of the travelling salesman problem(TSP).Then,the limitations of the ant colony algorithm were analyzed,and an improvement strategy was proposed by using python for digital simulation.The results demonstrated the reliability of model-building and algorithm improvement.展开更多
The planning environmental impact assessment (EIA) of transmission and transformation power grid at levels of 500 and 220 kV had been finished completely in the 13 municipalities of Jiangsu Province by the end of 20...The planning environmental impact assessment (EIA) of transmission and transformation power grid at levels of 500 and 220 kV had been finished completely in the 13 municipalities of Jiangsu Province by the end of 2012, which played important roles in guiding and planning the following transmission and transformation projects in environmental protection. In this paper, through the detail analysis on the objective and significance of the planning EIA of transmission and transformation power grid, legal basis and planning EIA practices, some suggestions and thinking about the planning EIA of transmission and transformation power grid were put forward.展开更多
Given the increasing uncertainties in power supply and load,this paper proposes the concept of power source and grid coordination uniformity planning.In this approach,the standard deviation of the transmission line lo...Given the increasing uncertainties in power supply and load,this paper proposes the concept of power source and grid coordination uniformity planning.In this approach,the standard deviation of the transmission line load rate is considered as the uniformity evaluation index for power source and grid planning.A multi-stage and multi-objective optimization model of the power source and grid expansion planning is established to minimize the comprehensive cost of the entire planning cycle.In this study,the improved particle swarm optimization algorithm and genetic algorithm are combined to solve the model,thus improving the efficiency and accuracy of the solution.The analysis of a simple IEEE Garver’s 6-node system shows that the model and solution method are effective and feasible.Moreover,they are suitable for the coordinated planning of the power source and grid under a diversified nature of power supply and load.展开更多
At present,the plan environmental impact assessment of power transmission and transformation grid is relatively mature. How to further improve the quality of plan environmental impact assessment of power grid during t...At present,the plan environmental impact assessment of power transmission and transformation grid is relatively mature. How to further improve the quality of plan environmental impact assessment of power grid during the "14^(th) Five-Year Plan" period is very important. In this paper,the plan environmental impact assessment of power grid in the Development Plan for Power Grid in Nanjing during the "13^(th) Five-Year Plan" Period is studied to further discuss the ideas,evaluation system and content framework of plan environmental impact assessment of power grid.展开更多
China Electricity Council organized competent authorities across the industry of electric power to work out the "Research Reports on the 12th Five-Year Plan for Electric Power Industry" in nearly one year, w...China Electricity Council organized competent authorities across the industry of electric power to work out the "Research Reports on the 12th Five-Year Plan for Electric Power Industry" in nearly one year, which provides a reference for governmental departments to formulate the 12th Five-Year Plan on energy and electric power industry. The magazine should publish the serial reports including power sources, power grids, equipment manufacture, energy and environment, and power economics. This paper presents the part of " power grids," in which the strategies of developing power grids are put forward.展开更多
On the basis of summing up the development of electric power industry in the 10th Five-Year Plan period, the idea of electric power development planning from 2006 to 2020 is presented. The authors analyzed ten main pr...On the basis of summing up the development of electric power industry in the 10th Five-Year Plan period, the idea of electric power development planning from 2006 to 2020 is presented. The authors analyzed ten main problems that existed in electric development during the 10th Five-Year Plan period, forecasted the electricity generation from 2006 to 2020, put forward the development strategy of power industry, discussed the component and development program of hydropower, thermal power, nuclear power, natural gas power and renewable power, outlined the present situations of six regional power grids, power transmission from western to eastern regions, UHV AC/DC power transmission and nationwide power grid interconnections, and finally gave out seven suggestions about electric power development in the future.展开更多
The safety and stability study on Northeast, North, East, Northwest and Central China power grids had been carried out, which provided technical supports to planning design of regional power grids. By analyzing safety...The safety and stability study on Northeast, North, East, Northwest and Central China power grids had been carried out, which provided technical supports to planning design of regional power grids. By analyzing safety and stability under severe faults in regional power grids, revealed weaknesses on power grid configurations and measures for preventing from loss of stability were presented. In comparison of various schemes of power system safety and stability among parts of power grids, more than two recommended schemes can be chosen as reference in planning design for regional power grids. Considering the safety and stability control measures necessary for each power grids, it is believed the trunk networks of all power grids can fulfill the third criteria of Guideline for Power System Safety and Stability, while the weakness and predominated hydropower may deteriorate safety and stability of power grids. The power grid shall be regulated in line with the variation of boundary conditions.展开更多
文摘A distribution network plays an extremely important role in the safe and efficient operation of a power grid.As the core part of a power grid’s operation,a distribution network will have a significant impact on the safety and reliability of residential electricity consumption.it is necessary to actively plan and modify the distribution network’s structure in the power grid,improve the quality of the distribution network,and optimize the planning of the distribution network,so that the network can be fully utilized to meet the needs of electricity consumption.In this paper,a distribution network grid planning algorithm based on the reliability of electricity consumption was completed using ant colony algorithm.For the distribution network structure planning of dual power sources,the parallel ant colony algorithm was used to prove that the premise of parallelism is the interactive process of ant colonies,and the dual power distribution network structure model is established based on the principle of the lowest cost.The artificial ants in the algorithm were compared with real ants in nature,and the basic steps and working principle of the ant colony optimization algorithm was studied with the help of the travelling salesman problem(TSP).Then,the limitations of the ant colony algorithm were analyzed,and an improvement strategy was proposed by using python for digital simulation.The results demonstrated the reliability of model-building and algorithm improvement.
基金Supported by the National Key Technology R&D Program(2012BAC20B1003)the Key National Social Science Fund Project(12&ZD214)the Special Fund Project for the Scientific Research of the Environmental Protection Welfare Industry(201209001)
文摘The planning environmental impact assessment (EIA) of transmission and transformation power grid at levels of 500 and 220 kV had been finished completely in the 13 municipalities of Jiangsu Province by the end of 2012, which played important roles in guiding and planning the following transmission and transformation projects in environmental protection. In this paper, through the detail analysis on the objective and significance of the planning EIA of transmission and transformation power grid, legal basis and planning EIA practices, some suggestions and thinking about the planning EIA of transmission and transformation power grid were put forward.
基金supported by Theoretical study of power system synergistic dispatch National Science Foundation of China(51477091).
文摘Given the increasing uncertainties in power supply and load,this paper proposes the concept of power source and grid coordination uniformity planning.In this approach,the standard deviation of the transmission line load rate is considered as the uniformity evaluation index for power source and grid planning.A multi-stage and multi-objective optimization model of the power source and grid expansion planning is established to minimize the comprehensive cost of the entire planning cycle.In this study,the improved particle swarm optimization algorithm and genetic algorithm are combined to solve the model,thus improving the efficiency and accuracy of the solution.The analysis of a simple IEEE Garver’s 6-node system shows that the model and solution method are effective and feasible.Moreover,they are suitable for the coordinated planning of the power source and grid under a diversified nature of power supply and load.
文摘At present,the plan environmental impact assessment of power transmission and transformation grid is relatively mature. How to further improve the quality of plan environmental impact assessment of power grid during the "14^(th) Five-Year Plan" period is very important. In this paper,the plan environmental impact assessment of power grid in the Development Plan for Power Grid in Nanjing during the "13^(th) Five-Year Plan" Period is studied to further discuss the ideas,evaluation system and content framework of plan environmental impact assessment of power grid.
文摘China Electricity Council organized competent authorities across the industry of electric power to work out the "Research Reports on the 12th Five-Year Plan for Electric Power Industry" in nearly one year, which provides a reference for governmental departments to formulate the 12th Five-Year Plan on energy and electric power industry. The magazine should publish the serial reports including power sources, power grids, equipment manufacture, energy and environment, and power economics. This paper presents the part of " power grids," in which the strategies of developing power grids are put forward.
文摘On the basis of summing up the development of electric power industry in the 10th Five-Year Plan period, the idea of electric power development planning from 2006 to 2020 is presented. The authors analyzed ten main problems that existed in electric development during the 10th Five-Year Plan period, forecasted the electricity generation from 2006 to 2020, put forward the development strategy of power industry, discussed the component and development program of hydropower, thermal power, nuclear power, natural gas power and renewable power, outlined the present situations of six regional power grids, power transmission from western to eastern regions, UHV AC/DC power transmission and nationwide power grid interconnections, and finally gave out seven suggestions about electric power development in the future.
文摘The safety and stability study on Northeast, North, East, Northwest and Central China power grids had been carried out, which provided technical supports to planning design of regional power grids. By analyzing safety and stability under severe faults in regional power grids, revealed weaknesses on power grid configurations and measures for preventing from loss of stability were presented. In comparison of various schemes of power system safety and stability among parts of power grids, more than two recommended schemes can be chosen as reference in planning design for regional power grids. Considering the safety and stability control measures necessary for each power grids, it is believed the trunk networks of all power grids can fulfill the third criteria of Guideline for Power System Safety and Stability, while the weakness and predominated hydropower may deteriorate safety and stability of power grids. The power grid shall be regulated in line with the variation of boundary conditions.