Advanced carbon emission factors of a power grid can provide users with effective carbon reduction advice,which is of immense importance in mobilizing the entire society to reduce carbon emissions.The method of calcul...Advanced carbon emission factors of a power grid can provide users with effective carbon reduction advice,which is of immense importance in mobilizing the entire society to reduce carbon emissions.The method of calculating node carbon emission factors based on the carbon emissions flow theory requires real-time parameters of a power grid.Therefore,it cannot provide carbon factor information beforehand.To address this issue,a prediction model based on the graph attention network is proposed.The model uses a graph structure that is suitable for the topology of the power grid and designs a supervised network using the loads of the grid nodes and the corresponding carbon factor data.The network extracts features and transmits information more suitable for the power system and can flexibly adjust the equivalent topology,thereby increasing the diversity of the structure.Its input and output data are simple,without the power grid parameters.We demonstrated its effect by testing IEEE-39 bus and IEEE-118 bus systems with average error rates of 2.46%and 2.51%.展开更多
Using the improved prospect theory with the linear transformations of rewarding good and punishing bad(RGPBIT),a new investment ranking model for power grid construction projects(PGCPs)is proposed.Given the uncertaint...Using the improved prospect theory with the linear transformations of rewarding good and punishing bad(RGPBIT),a new investment ranking model for power grid construction projects(PGCPs)is proposed.Given the uncertainty of each index value under the market environment,fuzzy numbers are used to describe qualitative indicators and interval numbers are used to describe quantitative ones.Taking into account decision-maker’s subjective risk attitudes,a multi-criteria decision-making(MCDM)method based on improved prospect theory is proposed.First,the[−1,1]RGPBIT operator is proposed to normalize the original data,to obtain the best andworst schemes of PGCPs.Furthermore,the correlation coefficients between interval/fuzzy numbers and the best/worst schemes are defined and introduced to the prospect theory to improve its value function and loss function,and the positive and negative prospect value matrices of the project are obtained.Then,the optimization model with the maximum comprehensive prospect value is constructed,the optimal attribute weight is determined,and the PGCPs are ranked accordingly.Taking four PGCPs of the IEEERTS-79 node system as examples,an illustration of the feasibility and effectiveness of the proposed method is provided.展开更多
Distributed photovoltaic power (PV) is the main development model of distributed generation. It is necessary to research on dispatching and operation management with large-scale distributed PV connected. This paper an...Distributed photovoltaic power (PV) is the main development model of distributed generation. It is necessary to research on dispatching and operation management with large-scale distributed PV connected. This paper analyzes development status, technical requirement and dispatching and operation management situation of distributed PV in Germany and China. Then introduce the preparation of distributed PV dispatching and operation management criterion. Through summarizing the experiences and lessons of large-scale distributed PV development in Germany, it gives advice to the development of distributed PV dispatching and operation management in China.展开更多
Optimization and placement of spinning reserve is an important issue in power system planning and operation. Systematic way for security assessment of operating reserve needs to study. A security assessment index syst...Optimization and placement of spinning reserve is an important issue in power system planning and operation. Systematic way for security assessment of operating reserve needs to study. A security assessment index system for operating reserve in large interconnected power grids is presented in this paper. Firstly, classification and determination methods of operating reserve at home and abroad are investigated, and operating reserve is divided into transient state operating reserve and quasi-steady state operating reserve from the view of security assessment. Secondly, assessment indexes and optimization methods for transient state operating reserve are studied. Thirdly, optimization model, deterministic and probabilistic optimization methods for quasi-steady state operating reserve are explored. Finally, some principles for determination of operating reserve are suggested, and a security assessment index system is put forward. The proposed index system, considering both transient and quasi-steady state, both deterministic and probabilistic methods, provides a systematic way to assessment and arrangement of operating reserve.展开更多
At the end of last year, the editors from Power and Electrical Engineers interviewed Zhou Xiaoxin on "Fundamental Research on Enhancing Operation Reliability for Large-Scale Interconnected Power Grids", a pr...At the end of last year, the editors from Power and Electrical Engineers interviewed Zhou Xiaoxin on "Fundamental Research on Enhancing Operation Reliability for Large-Scale Interconnected Power Grids", a project of "973 Program". Mr. Zhou, the chief engineer of China Electric Power Research Institute(CEPRI) and an academician of Chinese Academy of Sciences, is the chief scientist in charge of this research project.展开更多
To address the issue of climate change caused by the use of polluting, non-renewable energy sources, the use of renewable energy has gained momentum worldwide. Consequently, the increased integration of renewable ener...To address the issue of climate change caused by the use of polluting, non-renewable energy sources, the use of renewable energy has gained momentum worldwide. Consequently, the increased integration of renewable energy sources into power grids has necessitated the inclusion of flexible capacities in the power systems to solve problems of intermittent and fluctuating characteristics associated with renewable generation outputs. In this work, we study the regulating cost of a power system with high renewable penetration using an improved time-series system production simulation analysis method. The operational cost of the system is considered as the objective function. Three different methods to increase regulating capacities, including using interconnection lines, building additional flexible power capacities, and retrofitting existing thermal power plants, are adopted and simulated to compare the costs of accommodating renewable energy in the system in these cases. Our results indicate that increasing the flexibility of thermal power plants and developing crossregional connection lines are cost-effective methods of increasing renewable energy consumption.展开更多
This paper studies the reactive power and voltage coordinated control scheme. According to the characteristics of Hunan power grid, the coordinated schemes about Hunan power grid with Central China Power Grid, as well...This paper studies the reactive power and voltage coordinated control scheme. According to the characteristics of Hunan power grid, the coordinated schemes about Hunan power grid with Central China Power Grid, as well as Changsha power grid are proposed. At the same time, this paper builds a two-way interactive and multiple dispatching reactive power and voltage coordinated control mode, and can be successfully applied in Hunan power grid. The operation results show that this control scheme fulfills the ability of large power grids in optimal allocating of resources, effectively integrates the reactive power resources of the entire grid, achieves the purpose of reducing power grid loss, improving voltage quality, reducing the operating numbers of the reactive power equipment.展开更多
For Chinese power enterprises,investing overseas and actively seeking international cooperation in energy resources for mutual benefit accords with not only the desires of themselves to become bigger and stronger,but ...For Chinese power enterprises,investing overseas and actively seeking international cooperation in energy resources for mutual benefit accords with not only the desires of themselves to become bigger and stronger,but also China's energy strategy. Having won the first overseas state-level power-grid operation right,the State Grid Corporation of China (SGCC) took the lead in carrying out the strategy of "going out."展开更多
The first stage project of Jiuquan wind energy base with 5.5-GW installed capacity is about to be completed. However, there exist several technical issues such as power transfer capability, electricity accommodation, ...The first stage project of Jiuquan wind energy base with 5.5-GW installed capacity is about to be completed. However, there exist several technical issues such as power transfer capability, electricity accommodation, frequency control and peak load regulation as well as system stability. In addition, the high capital cost and operation cost of the supporting transmission project invested and constructed by the Gansu Provincial Power Company will definitely have significant impacts on the management and economic profit of the Company. Through analysis of the construction and operation cost changes resulting from the wind power collection and delivery project, the author carried out research into the effects of developing large-scale wind power base on the management and economic benefits of power grid enterprises and proposed corresponding suggestions to make the related policies perfect.展开更多
基金This work is supposed by the Science and Technology Projects of China Southern Power Grid(YNKJXM20222402).
文摘Advanced carbon emission factors of a power grid can provide users with effective carbon reduction advice,which is of immense importance in mobilizing the entire society to reduce carbon emissions.The method of calculating node carbon emission factors based on the carbon emissions flow theory requires real-time parameters of a power grid.Therefore,it cannot provide carbon factor information beforehand.To address this issue,a prediction model based on the graph attention network is proposed.The model uses a graph structure that is suitable for the topology of the power grid and designs a supervised network using the loads of the grid nodes and the corresponding carbon factor data.The network extracts features and transmits information more suitable for the power system and can flexibly adjust the equivalent topology,thereby increasing the diversity of the structure.Its input and output data are simple,without the power grid parameters.We demonstrated its effect by testing IEEE-39 bus and IEEE-118 bus systems with average error rates of 2.46%and 2.51%.
文摘Using the improved prospect theory with the linear transformations of rewarding good and punishing bad(RGPBIT),a new investment ranking model for power grid construction projects(PGCPs)is proposed.Given the uncertainty of each index value under the market environment,fuzzy numbers are used to describe qualitative indicators and interval numbers are used to describe quantitative ones.Taking into account decision-maker’s subjective risk attitudes,a multi-criteria decision-making(MCDM)method based on improved prospect theory is proposed.First,the[−1,1]RGPBIT operator is proposed to normalize the original data,to obtain the best andworst schemes of PGCPs.Furthermore,the correlation coefficients between interval/fuzzy numbers and the best/worst schemes are defined and introduced to the prospect theory to improve its value function and loss function,and the positive and negative prospect value matrices of the project are obtained.Then,the optimization model with the maximum comprehensive prospect value is constructed,the optimal attribute weight is determined,and the PGCPs are ranked accordingly.Taking four PGCPs of the IEEERTS-79 node system as examples,an illustration of the feasibility and effectiveness of the proposed method is provided.
文摘Distributed photovoltaic power (PV) is the main development model of distributed generation. It is necessary to research on dispatching and operation management with large-scale distributed PV connected. This paper analyzes development status, technical requirement and dispatching and operation management situation of distributed PV in Germany and China. Then introduce the preparation of distributed PV dispatching and operation management criterion. Through summarizing the experiences and lessons of large-scale distributed PV development in Germany, it gives advice to the development of distributed PV dispatching and operation management in China.
文摘Optimization and placement of spinning reserve is an important issue in power system planning and operation. Systematic way for security assessment of operating reserve needs to study. A security assessment index system for operating reserve in large interconnected power grids is presented in this paper. Firstly, classification and determination methods of operating reserve at home and abroad are investigated, and operating reserve is divided into transient state operating reserve and quasi-steady state operating reserve from the view of security assessment. Secondly, assessment indexes and optimization methods for transient state operating reserve are studied. Thirdly, optimization model, deterministic and probabilistic optimization methods for quasi-steady state operating reserve are explored. Finally, some principles for determination of operating reserve are suggested, and a security assessment index system is put forward. The proposed index system, considering both transient and quasi-steady state, both deterministic and probabilistic methods, provides a systematic way to assessment and arrangement of operating reserve.
文摘At the end of last year, the editors from Power and Electrical Engineers interviewed Zhou Xiaoxin on "Fundamental Research on Enhancing Operation Reliability for Large-Scale Interconnected Power Grids", a project of "973 Program". Mr. Zhou, the chief engineer of China Electric Power Research Institute(CEPRI) and an academician of Chinese Academy of Sciences, is the chief scientist in charge of this research project.
基金supported by National Key Research and Development Programe of China (No.2018YFB0904000)the State Grid Science & Technology Project (Title: Northeast Asia Power Grid Interconnection Feasibility Study)
文摘To address the issue of climate change caused by the use of polluting, non-renewable energy sources, the use of renewable energy has gained momentum worldwide. Consequently, the increased integration of renewable energy sources into power grids has necessitated the inclusion of flexible capacities in the power systems to solve problems of intermittent and fluctuating characteristics associated with renewable generation outputs. In this work, we study the regulating cost of a power system with high renewable penetration using an improved time-series system production simulation analysis method. The operational cost of the system is considered as the objective function. Three different methods to increase regulating capacities, including using interconnection lines, building additional flexible power capacities, and retrofitting existing thermal power plants, are adopted and simulated to compare the costs of accommodating renewable energy in the system in these cases. Our results indicate that increasing the flexibility of thermal power plants and developing crossregional connection lines are cost-effective methods of increasing renewable energy consumption.
文摘This paper studies the reactive power and voltage coordinated control scheme. According to the characteristics of Hunan power grid, the coordinated schemes about Hunan power grid with Central China Power Grid, as well as Changsha power grid are proposed. At the same time, this paper builds a two-way interactive and multiple dispatching reactive power and voltage coordinated control mode, and can be successfully applied in Hunan power grid. The operation results show that this control scheme fulfills the ability of large power grids in optimal allocating of resources, effectively integrates the reactive power resources of the entire grid, achieves the purpose of reducing power grid loss, improving voltage quality, reducing the operating numbers of the reactive power equipment.
文摘For Chinese power enterprises,investing overseas and actively seeking international cooperation in energy resources for mutual benefit accords with not only the desires of themselves to become bigger and stronger,but also China's energy strategy. Having won the first overseas state-level power-grid operation right,the State Grid Corporation of China (SGCC) took the lead in carrying out the strategy of "going out."
文摘The first stage project of Jiuquan wind energy base with 5.5-GW installed capacity is about to be completed. However, there exist several technical issues such as power transfer capability, electricity accommodation, frequency control and peak load regulation as well as system stability. In addition, the high capital cost and operation cost of the supporting transmission project invested and constructed by the Gansu Provincial Power Company will definitely have significant impacts on the management and economic profit of the Company. Through analysis of the construction and operation cost changes resulting from the wind power collection and delivery project, the author carried out research into the effects of developing large-scale wind power base on the management and economic benefits of power grid enterprises and proposed corresponding suggestions to make the related policies perfect.