This paper formulates and solves a techno-economic planning problem of reactive power (VAR) in power transmission systems under loadings. The objective of the proposed research work is to minimize the combination of i...This paper formulates and solves a techno-economic planning problem of reactive power (VAR) in power transmission systems under loadings. The objective of the proposed research work is to minimize the combination of installation cost of reactive power sources, power losses and operational cost while satisfying technical constraints. Initially, the positions for the placement of reactive power sources are determined technically. Different cost components such as VAR generation cost, line charging cost etc. are then added in the total operating cost in a most economical way. Finally, the optimal parameter setting subjected to reactive power planning (RPP) is obtained by taking advantages of hybrid soft computing techniques. For the justification of the efficiency and efficacy of the proposed approach the entire work is simulated on two inter-regional transmission networks. To validate the robustness and ease of the soft computing techniques in RPP the responses of benchmark functions and statistical proof are provided simultaneously.展开更多
Electric system planning with high variable renewable energy(VRE)penetration levels has attracted great attention world-wide.Electricity production of VRE highly depends on the weather conditions and thus involves lar...Electric system planning with high variable renewable energy(VRE)penetration levels has attracted great attention world-wide.Electricity production of VRE highly depends on the weather conditions and thus involves large variability,uncertainty,and low-capacity credit.This gives rise to significant challenges for power system planning.Currently,many solutions are proposed to address the issue of operational flexibility inadequacy,including flexibility retrofit of thermal units,inter-regional transmission,electricity energy storage,and demand response(DR).Evidently,the performance and the cost of various solutions are different.It is relevant to explore the optimal portfolio to satisfy the flexibility requirement for a renewable dominated system and the role of each flexibility source.In this study,the value of diverse DR flexibilities was examined and a stochastic investment planning model considering DR is proposed.Two types of DRs,namely interrupted DR and transferred DR,were modeled.Chronological load and renewable generation curves with 8760 hours within a whole year were reduced to 4 weekly scenarios to accelerate the optimization.Clustered unit commitment constraints for accommodating variability of renewables were incorporated.Case studies based on IEEE RTS-96 system are reported to demonstrate the effectiveness of the proposed method and the DR potential to avoid energy storage investment.展开更多
In China, the trading of construction land quotas has undergone an institutional evolution process characterized by gradual deregulation.In 2021, the Central Committee of the Communist Party of China(CPC) resolved to ...In China, the trading of construction land quotas has undergone an institutional evolution process characterized by gradual deregulation.In 2021, the Central Committee of the Communist Party of China(CPC) resolved to develop a national cross-regional trading mechanism for construction land quotas.Construction land quotas, which have attributes of both public power and private rights, share certain common grounds with the rights of land development, dumping and carbon emission.To build a national trading market for construction land quotas, it is necessary to make clarifications and innovations in macro-level ideas, meso-level mechanisms, and micro-level designs.展开更多
The current energy supply trajectory in the Association of Southeast Asian Nations(ASEAN)region is not sustainable.Factors such as rising standards of living and demographic patterns,including population growth,lead t...The current energy supply trajectory in the Association of Southeast Asian Nations(ASEAN)region is not sustainable.Factors such as rising standards of living and demographic patterns,including population growth,lead to continuous increase in power demand,which is difficult to meet using limited fossil fuel resources.Thus,a transition toward clean energy sources is needed in the region.While ASEAN member countries are rich in clean energy resources,such resources are located far from demand centers;thus,allocation of clean energy is necessary to increase its utilization.In this study,power demand is forecasted using a combination of prediction methods.A model to evaluate the installed capacity and power exchange potential is proposed to deal with mismatch between the location of the clean energy base and the load center.Furthermore,the concept of cross-regional allocation of clean energy between the ASEAN region,China,and South Asia is presented.A power interconnection scheme among the ASEAN member countries as well as neighboring countries is proposed based on the power exchange potential.The proposed grid interconnection scheme contributes to the utilization of clean energy in the ASEAN region,increasing the proportion of clean energy in the generation mix,which ensures that the region becomes a sustainable and resilient society with a clean and low carbon development route.Furthermore,the proposed power interconnection scheme will generate valuable economic,social,environmental,and resource allocation benefits.展开更多
The Dabancheng Windpower Farm in Northwest China’s Xinjiang Uygur Autonomous Region, the largest of its kind in China, plans to increase its present generating capacity of 10 MW to 100 MW by the year 2000. Situated i...The Dabancheng Windpower Farm in Northwest China’s Xinjiang Uygur Autonomous Region, the largest of its kind in China, plans to increase its present generating capacity of 10 MW to 100 MW by the year 2000. Situated in the vast desert to the southeast of Urumqi, capital city of Xinjiang, the farm has bountiful wind energy resources, with wind speeds as high as 38 metres per second. First built with the help of Danish Government loans in 1992, the farm now provides electricity for local people, especially those in remote areas which are not connected to a power grid. The farm is now seeking both domestic and overseas cooperation for technological improvements and expansion, according展开更多
According to the National Meeting on Power Construction and Cost Control held in Beijing on 26th August 1996, the target for power construction in the period of 9th Five- year Plan is set-up as follows:
a poster child for drought and famine to one of the fastest-growing economies in the world. However. this East African nation's energy production has not been on par with its rapid economic growth, often in double-di...a poster child for drought and famine to one of the fastest-growing economies in the world. However. this East African nation's energy production has not been on par with its rapid economic growth, often in double-digit figures,展开更多
The deployment of dynamic reactive power sourcecan effectively improve the voltage performance after a disturbance for a power system with increasing wind power penetration level and ubiquitous induction loads.To impr...The deployment of dynamic reactive power sourcecan effectively improve the voltage performance after a disturbance for a power system with increasing wind power penetration level and ubiquitous induction loads.To improve the voltage stability of the power system,this paper proposes an adaptive many-objective robust optimization model to deal with thedeployment issue of dynamic reactive power sources.Firstly,two metrics are adopted to assess the voltage stability of the system at two different stages,and one metric is proposed to assess the tie-line reactive power flow.Then,a robustness index isdeveloped to assess the sensitivity of a solution when subjectedto operational uncertainties,using the estimation of acceptablesensitivity region(ASR)and D-vine Copula.Five objectives areoptimized simultaneously:①total equipment investment;②adaptive short-term voltage stability evaluation;③tie-line power flow evaluation;④prioritized steady-state voltage stabilityevaluation;and⑤robustness evaluation.Finally,an anglebased adaptive many-objective evolutionary algorithm(MaOEA)is developed with two improvements designed for the application in a practical engineering problem:①adaptive mutationrate;and②elimination procedure without a requirement for athreshold value.The proposed model is verified on a modifiedNordic 74-bus system and a real-world power system.Numerical results demonstrate the effectiveness and efficiency of theproposed model.展开更多
文摘This paper formulates and solves a techno-economic planning problem of reactive power (VAR) in power transmission systems under loadings. The objective of the proposed research work is to minimize the combination of installation cost of reactive power sources, power losses and operational cost while satisfying technical constraints. Initially, the positions for the placement of reactive power sources are determined technically. Different cost components such as VAR generation cost, line charging cost etc. are then added in the total operating cost in a most economical way. Finally, the optimal parameter setting subjected to reactive power planning (RPP) is obtained by taking advantages of hybrid soft computing techniques. For the justification of the efficiency and efficacy of the proposed approach the entire work is simulated on two inter-regional transmission networks. To validate the robustness and ease of the soft computing techniques in RPP the responses of benchmark functions and statistical proof are provided simultaneously.
基金jointly supported by Youth Program of National Natural Science Foundation of China(No.51907100)Technical Program of Global Energy Interconnection Group Co.,Ltd(No.1100/2020-75001B)
文摘Electric system planning with high variable renewable energy(VRE)penetration levels has attracted great attention world-wide.Electricity production of VRE highly depends on the weather conditions and thus involves large variability,uncertainty,and low-capacity credit.This gives rise to significant challenges for power system planning.Currently,many solutions are proposed to address the issue of operational flexibility inadequacy,including flexibility retrofit of thermal units,inter-regional transmission,electricity energy storage,and demand response(DR).Evidently,the performance and the cost of various solutions are different.It is relevant to explore the optimal portfolio to satisfy the flexibility requirement for a renewable dominated system and the role of each flexibility source.In this study,the value of diverse DR flexibilities was examined and a stochastic investment planning model considering DR is proposed.Two types of DRs,namely interrupted DR and transferred DR,were modeled.Chronological load and renewable generation curves with 8760 hours within a whole year were reduced to 4 weekly scenarios to accelerate the optimization.Clustered unit commitment constraints for accommodating variability of renewables were incorporated.Case studies based on IEEE RTS-96 system are reported to demonstrate the effectiveness of the proposed method and the DR potential to avoid energy storage investment.
基金a phased research achievement of Sichuan's social science programming project in 2019 titled“Overall Planning of Public Power and Expression of Private Rights in Inter-provincial Trading of Construction Land Quotas of Impoverished Regions”(project number:SC19B093)。
文摘In China, the trading of construction land quotas has undergone an institutional evolution process characterized by gradual deregulation.In 2021, the Central Committee of the Communist Party of China(CPC) resolved to develop a national cross-regional trading mechanism for construction land quotas.Construction land quotas, which have attributes of both public power and private rights, share certain common grounds with the rights of land development, dumping and carbon emission.To build a national trading market for construction land quotas, it is necessary to make clarifications and innovations in macro-level ideas, meso-level mechanisms, and micro-level designs.
基金supported by the Science and Technology Foundation of GEIG (No.524500180014)
文摘The current energy supply trajectory in the Association of Southeast Asian Nations(ASEAN)region is not sustainable.Factors such as rising standards of living and demographic patterns,including population growth,lead to continuous increase in power demand,which is difficult to meet using limited fossil fuel resources.Thus,a transition toward clean energy sources is needed in the region.While ASEAN member countries are rich in clean energy resources,such resources are located far from demand centers;thus,allocation of clean energy is necessary to increase its utilization.In this study,power demand is forecasted using a combination of prediction methods.A model to evaluate the installed capacity and power exchange potential is proposed to deal with mismatch between the location of the clean energy base and the load center.Furthermore,the concept of cross-regional allocation of clean energy between the ASEAN region,China,and South Asia is presented.A power interconnection scheme among the ASEAN member countries as well as neighboring countries is proposed based on the power exchange potential.The proposed grid interconnection scheme contributes to the utilization of clean energy in the ASEAN region,increasing the proportion of clean energy in the generation mix,which ensures that the region becomes a sustainable and resilient society with a clean and low carbon development route.Furthermore,the proposed power interconnection scheme will generate valuable economic,social,environmental,and resource allocation benefits.
文摘The Dabancheng Windpower Farm in Northwest China’s Xinjiang Uygur Autonomous Region, the largest of its kind in China, plans to increase its present generating capacity of 10 MW to 100 MW by the year 2000. Situated in the vast desert to the southeast of Urumqi, capital city of Xinjiang, the farm has bountiful wind energy resources, with wind speeds as high as 38 metres per second. First built with the help of Danish Government loans in 1992, the farm now provides electricity for local people, especially those in remote areas which are not connected to a power grid. The farm is now seeking both domestic and overseas cooperation for technological improvements and expansion, according
文摘According to the National Meeting on Power Construction and Cost Control held in Beijing on 26th August 1996, the target for power construction in the period of 9th Five- year Plan is set-up as follows:
文摘a poster child for drought and famine to one of the fastest-growing economies in the world. However. this East African nation's energy production has not been on par with its rapid economic growth, often in double-digit figures,
基金supported by the International Postdoctoral Exchange Fellowship Program (Talent-Introduction Program)(No.YJ20210337)the Fundamental Research Funds for the Central Universities (No.2022CDJXY-007)。
文摘The deployment of dynamic reactive power sourcecan effectively improve the voltage performance after a disturbance for a power system with increasing wind power penetration level and ubiquitous induction loads.To improve the voltage stability of the power system,this paper proposes an adaptive many-objective robust optimization model to deal with thedeployment issue of dynamic reactive power sources.Firstly,two metrics are adopted to assess the voltage stability of the system at two different stages,and one metric is proposed to assess the tie-line reactive power flow.Then,a robustness index isdeveloped to assess the sensitivity of a solution when subjectedto operational uncertainties,using the estimation of acceptablesensitivity region(ASR)and D-vine Copula.Five objectives areoptimized simultaneously:①total equipment investment;②adaptive short-term voltage stability evaluation;③tie-line power flow evaluation;④prioritized steady-state voltage stabilityevaluation;and⑤robustness evaluation.Finally,an anglebased adaptive many-objective evolutionary algorithm(MaOEA)is developed with two improvements designed for the application in a practical engineering problem:①adaptive mutationrate;and②elimination procedure without a requirement for athreshold value.The proposed model is verified on a modifiedNordic 74-bus system and a real-world power system.Numerical results demonstrate the effectiveness and efficiency of theproposed model.