期刊文献+
共找到26篇文章
< 1 2 >
每页显示 20 50 100
Hybrid intelligence approach for multi-load level reactive power planning using VAR compensator in power transmission network 被引量:2
1
作者 Nihar Karmakar Biplab Bhattacharyya 《Protection and Control of Modern Power Systems》 2021年第1期330-346,共17页
This paper formulates and solves a techno-economic planning problem of reactive power (VAR) in power transmission systems under loadings. The objective of the proposed research work is to minimize the combination of i... This paper formulates and solves a techno-economic planning problem of reactive power (VAR) in power transmission systems under loadings. The objective of the proposed research work is to minimize the combination of installation cost of reactive power sources, power losses and operational cost while satisfying technical constraints. Initially, the positions for the placement of reactive power sources are determined technically. Different cost components such as VAR generation cost, line charging cost etc. are then added in the total operating cost in a most economical way. Finally, the optimal parameter setting subjected to reactive power planning (RPP) is obtained by taking advantages of hybrid soft computing techniques. For the justification of the efficiency and efficacy of the proposed approach the entire work is simulated on two inter-regional transmission networks. To validate the robustness and ease of the soft computing techniques in RPP the responses of benchmark functions and statistical proof are provided simultaneously. 展开更多
关键词 Active power loss Reactive power planning Hybrid algorithm Line charging Operating cost
原文传递
Power system planning with high renewable energy penetration considering demand response 被引量:3
2
作者 Peng Wang Ershun Du +2 位作者 Ning Zhang Xinzhi Xu Yi Gao 《Global Energy Interconnection》 CAS CSCD 2021年第1期69-80,共12页
Electric system planning with high variable renewable energy(VRE)penetration levels has attracted great attention world-wide.Electricity production of VRE highly depends on the weather conditions and thus involves lar... Electric system planning with high variable renewable energy(VRE)penetration levels has attracted great attention world-wide.Electricity production of VRE highly depends on the weather conditions and thus involves large variability,uncertainty,and low-capacity credit.This gives rise to significant challenges for power system planning.Currently,many solutions are proposed to address the issue of operational flexibility inadequacy,including flexibility retrofit of thermal units,inter-regional transmission,electricity energy storage,and demand response(DR).Evidently,the performance and the cost of various solutions are different.It is relevant to explore the optimal portfolio to satisfy the flexibility requirement for a renewable dominated system and the role of each flexibility source.In this study,the value of diverse DR flexibilities was examined and a stochastic investment planning model considering DR is proposed.Two types of DRs,namely interrupted DR and transferred DR,were modeled.Chronological load and renewable generation curves with 8760 hours within a whole year were reduced to 4 weekly scenarios to accelerate the optimization.Clustered unit commitment constraints for accommodating variability of renewables were incorporated.Case studies based on IEEE RTS-96 system are reported to demonstrate the effectiveness of the proposed method and the DR potential to avoid energy storage investment. 展开更多
关键词 Demand response High renewable penetration Operational flexibility power system planning
下载PDF
Southwest Power System Development Planning
3
《Electricity》 1999年第4期3-7,共5页
关键词 2010 KV Southwest power System Development planning
下载PDF
Power Sources Planning, Construction and Operation
4
《Electricity》 2001年第3期26-40,共15页
关键词 Construction and Operation power Sources planning
下载PDF
Overall Planning of Public Power and Expression of Private Rights in Cross-regional Trading of Construction Land Quotas
5
作者 Hong Yun 《Contemporary Social Sciences》 2021年第3期45-56,共12页
In China, the trading of construction land quotas has undergone an institutional evolution process characterized by gradual deregulation.In 2021, the Central Committee of the Communist Party of China(CPC) resolved to ... In China, the trading of construction land quotas has undergone an institutional evolution process characterized by gradual deregulation.In 2021, the Central Committee of the Communist Party of China(CPC) resolved to develop a national cross-regional trading mechanism for construction land quotas.Construction land quotas, which have attributes of both public power and private rights, share certain common grounds with the rights of land development, dumping and carbon emission.To build a national trading market for construction land quotas, it is necessary to make clarifications and innovations in macro-level ideas, meso-level mechanisms, and micro-level designs. 展开更多
关键词 construction land quotas overall planning of public power expression of private rights
下载PDF
The Principles and Methods of Power Development Planning in the Market Economic Situation of China
6
《Electricity》 1999年第1期7-9,24,共4页
关键词 The Principles and Methods of power Development planning in the Market Economic Situation of China
下载PDF
Planning Study on National Power Grid Interconnection Centered on Three Gorges Hydropower Station
7
作者 Zhou Xiaoqian(President, China Power Crid Construction Corporation) 《Electricity》 1999年第2期2-3,共2页
关键词 planning Study on National power Grid Interconnection Centered on Three Gorges Hydropower Station GRID
下载PDF
State Key Power Construction Projects in 1999 Issued from the State Development Planning Commission
8
《Electricity》 1999年第3期35-35,共1页
关键词 State Key power Construction Projects in 1999 Issued from the State Development planning Commission
下载PDF
Study of future power interconnection scheme in ASEAN 被引量:1
9
作者 Han Jiang Yi Gao +1 位作者 Pengfei Xu Jun Li 《Global Energy Interconnection》 2019年第6期550-560,共11页
The current energy supply trajectory in the Association of Southeast Asian Nations(ASEAN)region is not sustainable.Factors such as rising standards of living and demographic patterns,including population growth,lead t... The current energy supply trajectory in the Association of Southeast Asian Nations(ASEAN)region is not sustainable.Factors such as rising standards of living and demographic patterns,including population growth,lead to continuous increase in power demand,which is difficult to meet using limited fossil fuel resources.Thus,a transition toward clean energy sources is needed in the region.While ASEAN member countries are rich in clean energy resources,such resources are located far from demand centers;thus,allocation of clean energy is necessary to increase its utilization.In this study,power demand is forecasted using a combination of prediction methods.A model to evaluate the installed capacity and power exchange potential is proposed to deal with mismatch between the location of the clean energy base and the load center.Furthermore,the concept of cross-regional allocation of clean energy between the ASEAN region,China,and South Asia is presented.A power interconnection scheme among the ASEAN member countries as well as neighboring countries is proposed based on the power exchange potential.The proposed grid interconnection scheme contributes to the utilization of clean energy in the ASEAN region,increasing the proportion of clean energy in the generation mix,which ensures that the region becomes a sustainable and resilient society with a clean and low carbon development route.Furthermore,the proposed power interconnection scheme will generate valuable economic,social,environmental,and resource allocation benefits. 展开更多
关键词 power intercon nection power demand In stalled capacity plan ning power excha nge potential plan ning ASEAN
下载PDF
Information on Power Projects Planned in China
10
《Electricity》 2009年第3期53-54,共2页
关键词 PROJECT 2010 III HEAT Information on power Projects Planned in China
下载PDF
Information on Power Projects Planned in China
11
《Electricity》 2009年第4期52-54,共3页
关键词 2010 HEAT PROJECT Information on power Projects Planned in China
下载PDF
Information on Power Projects Planned in China
12
《Electricity》 2009年第1期52-54,共3页
关键词 PROJECT 2010 Information on power Projects Planned in China
下载PDF
Information on Power Projects Planned in China
13
《Electricity》 2010年第1期51-53,共3页
关键词 2010 PROJECT Information on power Projects Planned in China
下载PDF
Wind power airs growth plan
14
《Electricity》 1996年第1期53-53,共1页
The Dabancheng Windpower Farm in Northwest China’s Xinjiang Uygur Autonomous Region, the largest of its kind in China, plans to increase its present generating capacity of 10 MW to 100 MW by the year 2000. Situated i... The Dabancheng Windpower Farm in Northwest China’s Xinjiang Uygur Autonomous Region, the largest of its kind in China, plans to increase its present generating capacity of 10 MW to 100 MW by the year 2000. Situated in the vast desert to the southeast of Urumqi, capital city of Xinjiang, the farm has bountiful wind energy resources, with wind speeds as high as 38 metres per second. First built with the help of Danish Government loans in 1992, the farm now provides electricity for local people, especially those in remote areas which are not connected to a power grid. The farm is now seeking both domestic and overseas cooperation for technological improvements and expansion, according 展开更多
关键词 Wind power airs growth plan HIGH
下载PDF
Equipment delivery and quality problems affectingcompletion of 1997 Power Construction Plan
15
《Electricity》 1998年第2期43-44,共2页
关键词 Equipment delivery and quality problems affecting completion of 1997 power Construction Plan
下载PDF
Target for Power Construction in 9th Five-year Plan Period Set-up
16
《Electricity》 1996年第4期19-19,共1页
According to the National Meeting on Power Construction and Cost Control held in Beijing on 26th August 1996, the target for power construction in the period of 9th Five- year Plan is set-up as follows:
关键词 In Target for power Construction in 9th Five-year Plan Period Set-up
下载PDF
Power Plan
17
作者 Elias Meseret 《ChinAfrica》 2015年第2期36-36,共1页
a poster child for drought and famine to one of the fastest-growing economies in the world. However. this East African nation's energy production has not been on par with its rapid economic growth, often in double-di... a poster child for drought and famine to one of the fastest-growing economies in the world. However. this East African nation's energy production has not been on par with its rapid economic growth, often in double-digit figures, 展开更多
关键词 power Plan
下载PDF
A Study of Flue Cas Desulfurization Plan for a Power Plant Project
18
《Electricity》 1997年第4期26-28,共3页
关键词 A Study of Flue Cas Desulfurization Plan for a power Plant Project
下载PDF
8 large coal-fired generating units planned to be commissioned in Shandong Power Grid in 1997
19
《Electricity》 1997年第2期51-52,共2页
关键词 GRID large coal-fired generating units planned to be commissioned in Shandong power Grid in 1997
下载PDF
An Adaptive Many-objective Robust Optimization Model of Dynamic Reactive Power Sources for Voltage Stability Enhancement
20
作者 Yuan Chi Anqi Tao +2 位作者 Xiaolong Xu Qianggang Wang Niancheng Zhou 《Journal of Modern Power Systems and Clean Energy》 SCIE EI CSCD 2023年第6期1756-1769,共14页
The deployment of dynamic reactive power sourcecan effectively improve the voltage performance after a disturbance for a power system with increasing wind power penetration level and ubiquitous induction loads.To impr... The deployment of dynamic reactive power sourcecan effectively improve the voltage performance after a disturbance for a power system with increasing wind power penetration level and ubiquitous induction loads.To improve the voltage stability of the power system,this paper proposes an adaptive many-objective robust optimization model to deal with thedeployment issue of dynamic reactive power sources.Firstly,two metrics are adopted to assess the voltage stability of the system at two different stages,and one metric is proposed to assess the tie-line reactive power flow.Then,a robustness index isdeveloped to assess the sensitivity of a solution when subjectedto operational uncertainties,using the estimation of acceptablesensitivity region(ASR)and D-vine Copula.Five objectives areoptimized simultaneously:①total equipment investment;②adaptive short-term voltage stability evaluation;③tie-line power flow evaluation;④prioritized steady-state voltage stabilityevaluation;and⑤robustness evaluation.Finally,an anglebased adaptive many-objective evolutionary algorithm(MaOEA)is developed with two improvements designed for the application in a practical engineering problem:①adaptive mutationrate;and②elimination procedure without a requirement for athreshold value.The proposed model is verified on a modifiedNordic 74-bus system and a real-world power system.Numerical results demonstrate the effectiveness and efficiency of theproposed model. 展开更多
关键词 Voltage stability reactive power planning robust many-objective optimization TIE-LINE correlated uncertainty
原文传递
上一页 1 2 下一页 到第
使用帮助 返回顶部