期刊文献+
共找到13篇文章
< 1 >
每页显示 20 50 100
Experience of Supervision over Fossil-fired Power Plant Construction Project
1
《Electricity》 1999年第1期49-52,共4页
关键词 Experience of Supervision over Fossil-fired power plant construction Project OVER
下载PDF
Geotechnical Engineering Plays an Important Role in Power Plant Construction
2
《Electricity》 1999年第1期36-38,共3页
关键词 Geotechnical Engineering Plays an Important Role in power plant construction In
下载PDF
Electron Beam Desulfurization Project of Chengdu Cogeneration Power Plant Started Construction - A new cooperation in environment protection between China and Japan
3
《Electricity》 1996年第2期28-28,共1页
On March 25 1996, the electron beam flue gas desulfurization demonstration project of Chengdu Cogeneration Power Plant started formal construction This is at present the largest electron beam desulfurization project i... On March 25 1996, the electron beam flue gas desulfurization demonstration project of Chengdu Cogeneration Power Plant started formal construction This is at present the largest electron beam desulfurization project in power plants in the world, and is jointly constructed by Sichuan Electric Power Bureau and the EBARA Works of Japan, This is an important cooperation project in environment protection between 展开更多
关键词 PROJECT A new cooperation in environment protection between China and Japan Electron Beam Desulfurization Project of Chengdu Cogeneration power plant Started construction
下载PDF
Construction of Houshi Power Plant (6×600 MW)
4
《Electricity》 1999年第4期7-13,共7页
关键词 construction of Houshi power plant
下载PDF
The construction of Zhangzhou Houshi Power Plant ofFujian Province is in full swing
5
《Electricity》 1998年第2期48-48,共1页
关键词 The construction of Zhangzhou Houshi power plant of Fujian Province is in full swing
下载PDF
Trial Demonstration of SupervisionDuring the Quality Guaranteed Period in Construction of Power Plant
6
作者 Peng Shumei Yu Baoxing(Northwest Electric Beijing-Sargent & LundyPower Design Institute Power Engineering Co.. Ltd.) 《Electricity》 1998年第3期34-37,共4页
The Supervision during construction of Thailand PTA Co-generation, Which was contracted by our country extended into the quality guaranteed period. The supervision during the quality guaranteed period includes the mon... The Supervision during construction of Thailand PTA Co-generation, Which was contracted by our country extended into the quality guaranteed period. The supervision during the quality guaranteed period includes the monitor of the operation and maintenance of power plant,organization of subcontractor to treat the problems and defects occurred in the field in time, technical consultancy and communication in time, delivery of spare parts, and assistance of clearing Contractor’s quality deposit. It is proved by the practice that it is necessary to early out the supervision during quality guaranteed period. 展开更多
关键词 Trial Demonstration of SupervisionDuring the Quality Guaranteed Period in construction of power plant
下载PDF
Design and Construction of the Power Plant Multi-flue Chimneys in East China Area
7
作者 Di Yuanhang 《Electricity》 1997年第4期53-56,共4页
This paper mainly introduces the designand construction of the multi-flue chimneysof Beilungang Power Plant, ShidongkouSecond Power Plant and Waigaoqiao PowerPlant which have been used in East Chinaarea. This paper co... This paper mainly introduces the designand construction of the multi-flue chimneysof Beilungang Power Plant, ShidongkouSecond Power Plant and Waigaoqiao PowerPlant which have been used in East Chinaarea. This paper contains the generalsituation of construction, material selection,lifting scheme of steel inner flue, designfeatures and construction method. It could bereferential to concerned design andconstruction companies. 展开更多
关键词 Design and construction of the power plant Multi-flue Chimneys in East China Area
下载PDF
CONSTRUCTION OF GUIZHOU PANXINA THERMAL POWER PLANT PHASE Ⅱ SPEED UP TO PROMOTE THE COURSE "SENDING POWER FROM WEST TO EAST
8
《Electricity》 2000年第3期49-49,共1页
关键词 SENDING power FROM WEST TO EAST construction OF GUIZHOU PANXINA THERMAL power plant PHASE SPEED UP TO PROMOTE THE COURSE
下载PDF
Construction of Ling'ao Nuclear Power Plant proceeds as scheduled
9
《Electricity》 1997年第2期22-22,共1页
关键词 construction of Ling’ao Nuclear power plant proceeds as scheduled
下载PDF
Lower Project Cost,Shorten Construction Schedule and Promote Market Competition of Fossil Power Plants
10
《Electricity》 1999年第3期23-27,共5页
关键词 PROJECT Lower Project Cost Shorten construction Schedule and Promote Market Competition of Fossil power plants
下载PDF
Constructing Large Capacity Power Plant on Collapsible Loess Stratum with Huge Thickness
11
作者 Huang Tianshi, Liu Houjian Northwest Electric Power Design Institute (NWEPDI) 《Electricity》 1996年第4期39-41,共3页
1 Preface In the northern and northwestern parts of China, quite a large portion of area, approximately 630,000 km^2, is covered by loess and loess-liked soils. The loess thickness ranges from several meters to severa... 1 Preface In the northern and northwestern parts of China, quite a large portion of area, approximately 630,000 km^2, is covered by loess and loess-liked soils. The loess thickness ranges from several meters to several hundred meters along the river’s terraces to those geomorphologic plateaus. In geology, "China Loess" has become a geologic term, because the loess in China has evolved with the widest distribution and greatest thickness in the world, and is also a typical and significant deposit in Quaternary Period. 展开更多
关键词 THAN MORE In TEST Constructing Large Capacity power plant on Collapsible Loess Stratum with Huge Thickness
下载PDF
Xiangfan Coal-fired Power Plant - a matched large power plant for Three Gorges Project starts to construct
12
《Electricity》 1996年第4期44-44,共1页
Xiangfan Coal-fired Power Plant, a key energy construction project matched with Three Gorges Project, approved by the State Council. formally started to build in the suburb of Xiangfan City, Hubei Province on November... Xiangfan Coal-fired Power Plant, a key energy construction project matched with Three Gorges Project, approved by the State Council. formally started to build in the suburb of Xiangfan City, Hubei Province on November 29, 1996. 展开更多
关键词 PROJECT Xiangfan Coal-fired power plant a matched large power plant for Three Gorges Project starts to construct
下载PDF
Synchronous Construction and Operation of Coal Mine and Power Plant in Mining Area
13
作者 Zheng Yonglian (Diector ,Power under Yongxia Area Management Committee ,Henan)Wang Jiawer (Yongxia Mining Area Management Committee ,Henan) 《China Coal》 1997年第S1期34-35,共2页
In accordance with the experience withSynchronous construction of coal mine andpower plant in Yongxia mining area, thispaper discusses the existing issues regardingmine mouth power plant including capital,power grid c... In accordance with the experience withSynchronous construction of coal mine andpower plant in Yongxia mining area, thispaper discusses the existing issues regardingmine mouth power plant including capital,power grid connection, electricity price for gridconnection, installed capacity generation setselection as well as self- protection of coalindustry. It is regarded that under marketeconomy as long as the benefits of the threesectors of coal, electricity and the local arecomprehensively considered, a suitable waycan be arrived for conl industry to operate electricity business. 展开更多
关键词 Synchronous construction and Operation of Coal Mine and power plant in Mining Area
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部