Given the actual working of a fully mechanized plough at a mining face, we have proposed a formula for running constraints between powered supports and a coal plough under assumed geological conditions of the coal fac...Given the actual working of a fully mechanized plough at a mining face, we have proposed a formula for running constraints between powered supports and a coal plough under assumed geological conditions of the coal face and, on this basis, established an automatic control model of powered supports for the coal plough face. We introduced the working principle of the powered support control system of the plough at the mining face. We established three advanced characteristics of this control system: response speed, reliability and easy maintenance of the system. As well, we briefly introduced, the principal function of primary and subordinate controllers and the realization of the communication system by a Single Bus. Ten controllers were constructed and tested in our laboratorium. The results show that the control model is practical and meets actual conditions. It provides a theoretical basis for designing a comouter control system for a oowered support system of a plough at a mining face.展开更多
An integrated laser diode driver(LDD) driving an edge-emitting laser diode was designed and fabricated by 0.35 μm BiCMOS technology. This paper proposes a scheme which combines the automatic power control loop and te...An integrated laser diode driver(LDD) driving an edge-emitting laser diode was designed and fabricated by 0.35 μm BiCMOS technology. This paper proposes a scheme which combines the automatic power control loop and temperature com-pensation for modulation current in order to maintain constant extinction ratio and average optical power. To implement tem-perature compensation for modulation current,a novel circuit which generates a PTAT current by using the injecting base current of a bipolar transistor in saturation region,and alternates the amplifier feedback loop(closed or not) to control the state of the current path is presented. Simulation results showed that programmed by choice of external resistors,the IC can provide modu-lation current from 5 mA to 85 mA with temperature compensation adjustments and independent bias current from 4 mA to 100 mA. Optical test results showed that clear eye-diagrams can be obtained at 155 Mbps,with the output optical power being nearly constant,and the variation of extinction ratio being lower than 0.7 dB.展开更多
Currently, the high-speed serial fiber-optic ring net communication is a main method for performing the distributed control network topology and control mode. Because of a network transmission delay inherent in the to...Currently, the high-speed serial fiber-optic ring net communication is a main method for performing the distributed control network topology and control mode. Because of a network transmission delay inherent in the topology, synchronization between nodes has become a critical issue which needs to be studied. The existing synchronization methods largely depend on the complex communication protocol. Therefore, this paper has proposed a method of automatic measurement and compensation of synchronization delay, and analyzed its operating principle and implementation procedure in detail. The results obtained from the experiments prove the proposed method to be correct, effective and practicable.展开更多
It is need to establish site project department during the construction of electric power project.The head office should design and build the main structure,continually improve structure of project department,meantime...It is need to establish site project department during the construction of electric power project.The head office should design and build the main structure,continually improve structure of project department,meantime,positively apply principle of automatic control to improve the site management of electric power construction.In this article,the application strategy of principle of automatic control is analyzed focusing on the site work of electric power construction.展开更多
The increasing use of renewable energy in the power system results in strong stochastic disturbances and degrades the control performance of the distributed power grids.In this paper,a novel multi-agent collaborative ...The increasing use of renewable energy in the power system results in strong stochastic disturbances and degrades the control performance of the distributed power grids.In this paper,a novel multi-agent collaborative reinforcement learning algorithm is proposed with automatic optimization,namely,Dyna-DQL,to quickly achieve an optimal coordination solution for the multi-area distributed power grids.The proposed Dyna framework is combined with double Q-learning to collect and store the environmental samples.This can iteratively update the agents through buffer replay and real-time data.Thus the environmental data can be fully used to enhance the learning speed of the agents.This mitigates the negative impact of heavy stochastic disturbances caused by the integration of renewable energy on the control performance.Simulations are conducted on two different models to validate the effectiveness of the proposed algorithm.The results demonstrate that the proposed Dyna-DQL algorithm exhibits superior stability and robustness compared to other reinforcement learning algorithms.展开更多
The wind–thermal bundled power system achieves energy complementarity and optimized scheduling, which is an important way to build a new type of energy system. For the safe and stable operation of the wind–thermal b...The wind–thermal bundled power system achieves energy complementarity and optimized scheduling, which is an important way to build a new type of energy system. For the safe and stable operation of the wind–thermal bundled power system, accurate data-driven analysis is necessary to maintain real-time balance between electricity supply and demand. By summarizing the development and characteristics of wind–thermal bundled power system in China and different countries, current research in this field can be clearly defined in two aspects: short-term wind power prediction for wind farms and performance evaluation of automatic generation control (AGC) for thermal power generation units. For short-term wind power prediction, it is recommended to focus on historical data preprocessing and artificial intelligence methods. The technical characteristics of different data-driven wind power prediction methods have been compared in detail. For performance evaluation of AGC units, a comprehensive analysis was conducted on current evaluation methods, including the “permitted-band” and “regulation mileage” methods, as well as the issue of evaluation failure in traditional evaluation methods in practical engineering. Finally, the relative optimal dynamic performance of AGC units was discussed and the future trend of data-driven research in wind–thermal bundled power system was summarized.展开更多
An improved automatic voltage coordination control strategy (AVCCS) based on ;automatic voltage control (AVC) and battery energy storage control (BESC) is proposed for photovoltaic grid-connected system (PVGS)...An improved automatic voltage coordination control strategy (AVCCS) based on ;automatic voltage control (AVC) and battery energy storage control (BESC) is proposed for photovoltaic grid-connected system (PVGS) to mitigate the voltage fluctuations caused by environmental disturbances. Only AVC is used when small environ- mental disturbances happen, while BESC is incorporated with AVC to restrain the voltage fluctuations when large disturbances happen. An adjustable parameter determining the allowed amplitudes of voltage fluctuations is introduced to realize the above switching process. A benchmark low voltage distribution system including ]?VGS is established by using the commercial software Dig SILENT. Simulation results show that the voltage under AVCCS satisfies the IEEE Standard 1547, and the installed battery capacity is also reduced. Meanwhile, the battery's service life is ex- tended by avoiding frequent charges/discharges in the control process.展开更多
Since wind power has the features of being intermittent and unpredictable, and usually needs transmission over long distances, grid integration of large-scale wind power will exert signif icant influence on power grid...Since wind power has the features of being intermittent and unpredictable, and usually needs transmission over long distances, grid integration of large-scale wind power will exert signif icant influence on power grid planning and construction, and will make a heavy impact on the safe and reliable operation of power systems. To deal with the diff iculties of large scale wind power dispatch, this paper presents a new automatic generation control (AGC) scheme that involves the participation of wind farms. The scheme is based on ultra-short-term wind power forecast. The author establishes a generation output distribution optimization mode for the power system with wind farms and verif ies the feasibility of the scheme by an example.展开更多
Vehicle hydraulic pump station, often work environment is poor, the environment temperature difference is very big, the natureof the hydraulic oil is affected by temperature is very big, a lot of damage, PLC automatic...Vehicle hydraulic pump station, often work environment is poor, the environment temperature difference is very big, the natureof the hydraulic oil is affected by temperature is very big, a lot of damage, PLC automatic control scheme and design of pumping station, the oiltemperature automatic control system realized the automation of the oil temperature control, greatly improving the pump station of the outdoorenvironment to adapt to the performance.展开更多
基金Project 104030 supported by the Ministry of Education of the People’s Republic of China
文摘Given the actual working of a fully mechanized plough at a mining face, we have proposed a formula for running constraints between powered supports and a coal plough under assumed geological conditions of the coal face and, on this basis, established an automatic control model of powered supports for the coal plough face. We introduced the working principle of the powered support control system of the plough at the mining face. We established three advanced characteristics of this control system: response speed, reliability and easy maintenance of the system. As well, we briefly introduced, the principal function of primary and subordinate controllers and the realization of the communication system by a Single Bus. Ten controllers were constructed and tested in our laboratorium. The results show that the control model is practical and meets actual conditions. It provides a theoretical basis for designing a comouter control system for a oowered support system of a plough at a mining face.
基金Project (No. 2006AA01Z226) supported by the Hi-Tech Researchand Development Program (863) of China
文摘An integrated laser diode driver(LDD) driving an edge-emitting laser diode was designed and fabricated by 0.35 μm BiCMOS technology. This paper proposes a scheme which combines the automatic power control loop and temperature com-pensation for modulation current in order to maintain constant extinction ratio and average optical power. To implement tem-perature compensation for modulation current,a novel circuit which generates a PTAT current by using the injecting base current of a bipolar transistor in saturation region,and alternates the amplifier feedback loop(closed or not) to control the state of the current path is presented. Simulation results showed that programmed by choice of external resistors,the IC can provide modu-lation current from 5 mA to 85 mA with temperature compensation adjustments and independent bias current from 4 mA to 100 mA. Optical test results showed that clear eye-diagrams can be obtained at 155 Mbps,with the output optical power being nearly constant,and the variation of extinction ratio being lower than 0.7 dB.
文摘Currently, the high-speed serial fiber-optic ring net communication is a main method for performing the distributed control network topology and control mode. Because of a network transmission delay inherent in the topology, synchronization between nodes has become a critical issue which needs to be studied. The existing synchronization methods largely depend on the complex communication protocol. Therefore, this paper has proposed a method of automatic measurement and compensation of synchronization delay, and analyzed its operating principle and implementation procedure in detail. The results obtained from the experiments prove the proposed method to be correct, effective and practicable.
文摘It is need to establish site project department during the construction of electric power project.The head office should design and build the main structure,continually improve structure of project department,meantime,positively apply principle of automatic control to improve the site management of electric power construction.In this article,the application strategy of principle of automatic control is analyzed focusing on the site work of electric power construction.
基金supported by the National Natural Sci-ence Foundation of China(No.52277108)Guangdong Provincial Department of Science and Technology(No.2022A0505020015).
文摘The increasing use of renewable energy in the power system results in strong stochastic disturbances and degrades the control performance of the distributed power grids.In this paper,a novel multi-agent collaborative reinforcement learning algorithm is proposed with automatic optimization,namely,Dyna-DQL,to quickly achieve an optimal coordination solution for the multi-area distributed power grids.The proposed Dyna framework is combined with double Q-learning to collect and store the environmental samples.This can iteratively update the agents through buffer replay and real-time data.Thus the environmental data can be fully used to enhance the learning speed of the agents.This mitigates the negative impact of heavy stochastic disturbances caused by the integration of renewable energy on the control performance.Simulations are conducted on two different models to validate the effectiveness of the proposed algorithm.The results demonstrate that the proposed Dyna-DQL algorithm exhibits superior stability and robustness compared to other reinforcement learning algorithms.
文摘The wind–thermal bundled power system achieves energy complementarity and optimized scheduling, which is an important way to build a new type of energy system. For the safe and stable operation of the wind–thermal bundled power system, accurate data-driven analysis is necessary to maintain real-time balance between electricity supply and demand. By summarizing the development and characteristics of wind–thermal bundled power system in China and different countries, current research in this field can be clearly defined in two aspects: short-term wind power prediction for wind farms and performance evaluation of automatic generation control (AGC) for thermal power generation units. For short-term wind power prediction, it is recommended to focus on historical data preprocessing and artificial intelligence methods. The technical characteristics of different data-driven wind power prediction methods have been compared in detail. For performance evaluation of AGC units, a comprehensive analysis was conducted on current evaluation methods, including the “permitted-band” and “regulation mileage” methods, as well as the issue of evaluation failure in traditional evaluation methods in practical engineering. Finally, the relative optimal dynamic performance of AGC units was discussed and the future trend of data-driven research in wind–thermal bundled power system was summarized.
基金Supported by National Basic Research Program of China ("973" Program,No. 2009CB219701 and No. 2010CB234608)Tianjin Municipal Science and Technology Development Program (No. 09JCZDJC25000)Specialized Research Fund for Doctor Discipline of Ministry of Education of China (No. 20090032110064)
文摘An improved automatic voltage coordination control strategy (AVCCS) based on ;automatic voltage control (AVC) and battery energy storage control (BESC) is proposed for photovoltaic grid-connected system (PVGS) to mitigate the voltage fluctuations caused by environmental disturbances. Only AVC is used when small environ- mental disturbances happen, while BESC is incorporated with AVC to restrain the voltage fluctuations when large disturbances happen. An adjustable parameter determining the allowed amplitudes of voltage fluctuations is introduced to realize the above switching process. A benchmark low voltage distribution system including ]?VGS is established by using the commercial software Dig SILENT. Simulation results show that the voltage under AVCCS satisfies the IEEE Standard 1547, and the installed battery capacity is also reduced. Meanwhile, the battery's service life is ex- tended by avoiding frequent charges/discharges in the control process.
文摘Since wind power has the features of being intermittent and unpredictable, and usually needs transmission over long distances, grid integration of large-scale wind power will exert signif icant influence on power grid planning and construction, and will make a heavy impact on the safe and reliable operation of power systems. To deal with the diff iculties of large scale wind power dispatch, this paper presents a new automatic generation control (AGC) scheme that involves the participation of wind farms. The scheme is based on ultra-short-term wind power forecast. The author establishes a generation output distribution optimization mode for the power system with wind farms and verif ies the feasibility of the scheme by an example.
文摘Vehicle hydraulic pump station, often work environment is poor, the environment temperature difference is very big, the natureof the hydraulic oil is affected by temperature is very big, a lot of damage, PLC automatic control scheme and design of pumping station, the oiltemperature automatic control system realized the automation of the oil temperature control, greatly improving the pump station of the outdoorenvironment to adapt to the performance.
文摘“双碳”目标的实施加速了新型电力系统发展。然而,新型电力系统的转动惯量和调节能力逐渐难以适应复杂多变的负荷变化。因此,开发更高效、更快速的调频资源参与自动发电控制(automatic generation control,AGC)已成为刻不容缓之事。但是,不同调频机组之间的异质性显著,包括机组模型、容量和响应速度的差异,这对AGC提出了挑战。为了提升异质调频资源参与AGC的性能,该文提出了一种分布式协同AGC方法。首先,基于分布式固定时间一致性理论提出了一种分布式固定时间区域控制偏差(area control error,ACE)发掘算法。随后,各AGC机组根据获取的ACE信息设计独立的PI控制器参与频率调节。在ACE调节的最后阶段,根据各机组出力的标幺值,设计了分布式固定时间功率均分控制器,控制低速AGC机组承担更多的功率调整量,从而释放高速AGC机组的容量并为下一轮AGC服务做好准备。通过对包含5种不同调频单元的两区域电力系统进行仿真研究,验证了所提分布式协同AGC方法的性能。结果表明,所提方法可以有效地提高系统的调频性能,且能够在设计的时间内实现期望的有功功率分配。