In the first half of 2007, the power industry in Shandongprovince continued to maintain a rapid growth momentum.The gross electricity consumption amounted to 121.25 TWh,14.4% higher over that in the same period of las...In the first half of 2007, the power industry in Shandongprovince continued to maintain a rapid growth momentum.The gross electricity consumption amounted to 121.25 TWh,14.4% higher over that in the same period of last year. The totalinstalled capacity reached 53.29 GW. It was expected that bythe end of 2007, the gross electricity consumption in Shan-dong would reach 260 TWh, increasing by 14.4% on ayear-on-year basis; the maximum load would reach 40.展开更多
The main problem existing in Guangdong electric power sources is analyzed in this paper. Based on theanalysis on energy-supply features, power demand and the technical and economic performances of various powersource...The main problem existing in Guangdong electric power sources is analyzed in this paper. Based on theanalysis on energy-supply features, power demand and the technical and economic performances of various powersources in Guangdong, the power sources construction scale and its structure are studied and analyzed in detail byusing Generation Expansion Software Package (GESP). The future development of Guangdong electric power sourcesunder the new situation of "Power from West to East" is studied as well.[展开更多
文摘In the first half of 2007, the power industry in Shandongprovince continued to maintain a rapid growth momentum.The gross electricity consumption amounted to 121.25 TWh,14.4% higher over that in the same period of last year. The totalinstalled capacity reached 53.29 GW. It was expected that bythe end of 2007, the gross electricity consumption in Shan-dong would reach 260 TWh, increasing by 14.4% on ayear-on-year basis; the maximum load would reach 40.
文摘The main problem existing in Guangdong electric power sources is analyzed in this paper. Based on theanalysis on energy-supply features, power demand and the technical and economic performances of various powersources in Guangdong, the power sources construction scale and its structure are studied and analyzed in detail byusing Generation Expansion Software Package (GESP). The future development of Guangdong electric power sourcesunder the new situation of "Power from West to East" is studied as well.[