The models, methods and their application experiences of a practical GIS(geographic information system)-based computer decision-making support system of urban power distribution network planning with seven subsystems,...The models, methods and their application experiences of a practical GIS(geographic information system)-based computer decision-making support system of urban power distribution network planning with seven subsystems,termed CNP,are described.In each subsystem there is at least one or one set of practical mathematical methobs.Some new models and mathematical methods have been introduced.In the development of CNP the idea of cognitive system engineering has been insisted on,which claims that human and computer intelligence should be combined together to solve the complex engineering problems cooperatively.Practical applications have shown that not only the optimal plan can be automatically reached with many complicated factors considered, but also the computation,analysis and graphic drawing burden can be released considerably.展开更多
A distribution network plays an extremely important role in the safe and efficient operation of a power grid.As the core part of a power grid’s operation,a distribution network will have a significant impact on the s...A distribution network plays an extremely important role in the safe and efficient operation of a power grid.As the core part of a power grid’s operation,a distribution network will have a significant impact on the safety and reliability of residential electricity consumption.it is necessary to actively plan and modify the distribution network’s structure in the power grid,improve the quality of the distribution network,and optimize the planning of the distribution network,so that the network can be fully utilized to meet the needs of electricity consumption.In this paper,a distribution network grid planning algorithm based on the reliability of electricity consumption was completed using ant colony algorithm.For the distribution network structure planning of dual power sources,the parallel ant colony algorithm was used to prove that the premise of parallelism is the interactive process of ant colonies,and the dual power distribution network structure model is established based on the principle of the lowest cost.The artificial ants in the algorithm were compared with real ants in nature,and the basic steps and working principle of the ant colony optimization algorithm was studied with the help of the travelling salesman problem(TSP).Then,the limitations of the ant colony algorithm were analyzed,and an improvement strategy was proposed by using python for digital simulation.The results demonstrated the reliability of model-building and algorithm improvement.展开更多
This paper proposes to use the power system simulation software CYME to plan, model and simulate for an actual distribution network for improving the reliability and efficiency, enhancing the efficiency and capacity, ...This paper proposes to use the power system simulation software CYME to plan, model and simulate for an actual distribution network for improving the reliability and efficiency, enhancing the efficiency and capacity, simulating the abnormal condition of distribution network, and presenting operation program of safe, reliable and having simulation record statements. The modeling simulation results show that the software module has lots of advantages including high accuracy, ideal reliability, powerful practicality in simulation and analysis of distribution network, it only need to create once model, the model can sufficiently satisfy multifarious types of simulation analysis required for the distribution network planning.展开更多
The capacitive reactive power reversal in the urban distribution grid is increasingly prominent at the period of light load in the last years.In severe cases,it will endanger the security and stability of power grid.T...The capacitive reactive power reversal in the urban distribution grid is increasingly prominent at the period of light load in the last years.In severe cases,it will endanger the security and stability of power grid.This paper presents an optimal reactive power compensation method of distribution network to prevent reactive power reverse.Firstly,an integrated reactive power planning(RPP)model with power factor constraints is established.Capacitors and reactors are considered to be installed in the distribution system at the same time.The objective function is the cost minimization of compensation and real power loss with transformers and lines during the planning period.Nodal power factor limits and reactor capacity constraints are new constraints.Then,power factor sensitivity with respect to reactive power is derived.An improved genetic algorithm by power factor sensitivity is used to solve the model.The optimal locations and sizes of reactors and capacitors can avoid reactive power reversal and power factor exceeding the limit.Finally,the effectiveness of the model and algorithm is proven by a typical high-voltage distribution network.展开更多
The limitations of the conventional master-slavesplitting(MSS)method,which is commonly applied to power flow and optimal power flow in integrated transmission and distribution(I-T&D)networks,are first analyzed.Con...The limitations of the conventional master-slavesplitting(MSS)method,which is commonly applied to power flow and optimal power flow in integrated transmission and distribution(I-T&D)networks,are first analyzed.Considering that the MSS method suffers from a slow convergence rate or even divergence under some circumstances,a least-squares-based iterative(LSI)method is proposed.Compared with the MSS method,the LSI method modifies the iterative variables in each iteration by solving a least-squares problem with the information in previous iterations.A practical implementation and a parameter tuning strategy for the LSI method are discussed.Furthermore,a LSI-PF method is proposed to solve I-T&D power flow and a LSIheterogeneous decomposition(LSI-HGD)method is proposed to solve optimal power flow.Numerical experiments demonstrate that the proposed LSI-PF and LSI-HGD methods can achieve the same accuracy as the benchmark methods.Meanwhile,these LSI methods,with appropriate settings,significantly enhance the convergence and efficiency of conventional methods.Also,in some cases,where conventional methods diverge,these LSI methods can still converge.展开更多
This paper describes the study analysis performed to evaluate the available and potential solutions to control the highly increasing short circuit (SC) levels in Kuwait power system. The real Kuwait High Voltage (H...This paper describes the study analysis performed to evaluate the available and potential solutions to control the highly increasing short circuit (SC) levels in Kuwait power system. The real Kuwait High Voltage (HV) network was simulated to examine different measures at both 275 kV and 132 kV stations. The simulation results show that the short circuit currents exceed the permissible levels (40 kA in the 132 kV network and 63 kA in the 275 kV network) in some specific points. The examined measures include the a study on changing the neutral point policy, changing some lines from alternating current (AC) to direct current (DC), dividing specific bus bars in some generating stations and applying current limiters. The paper also presents a new plan for the transmission network in order to manage the expected increase in short circuit levels in the future.展开更多
As the integration of distributed generations(DGs)transforms the traditional distribution network into the active distribution network,voltage stability assessments(VSA)of transmission grid and distribution grid are n...As the integration of distributed generations(DGs)transforms the traditional distribution network into the active distribution network,voltage stability assessments(VSA)of transmission grid and distribution grid are not suitable to be studied separately.This paper presents a distributed continuation power flow method for VSA of global transmission and distribution grid.Two different parameterization schemes are adopted to guarantee the coherence of load growth in transmission and distribution grids.In the correction step,the boundary bus voltage,load parameter and equivalent power are communicated between the transmission and distribution control centers to realize the distributed computation of load margin.The optimal multiplier technique is used to improve the convergence of the proposed method.The three-phase unbalanced characteristic of distribution networks and the reactive capability limits of DGs are considered.Simulation results on two integrated transmission and distribution test systems show that the proposed method is effective.展开更多
With the advancement of clean heating projects and the integration of large-scale distributed heat pumps into rural distribution networks in northern China,power grid companies face tremendous pressure to invest in po...With the advancement of clean heating projects and the integration of large-scale distributed heat pumps into rural distribution networks in northern China,power grid companies face tremendous pressure to invest in power grid upgrades,which bring opportunities for renewable power generation integration.The combination of heating by distributed renewable energy with the flexible operation of heat pumps is a feasible alternative for dealing with grid reinforcement challenges resulting from heating electrification.In this paper,a mathematical model of the collaborative planning of distributed wind power generation(DWPG)and distribution network with large-scale heat pumps is developed.In this model,the operational flexibility of the heat pump load is fully considered and the requirements of a comfortable indoor temperature are met.By applying this model,the goals of not only increasing the profit of DWPG but also reducing the cost of the power grid upgrade can be achieved.展开更多
Power is an important part of the energy industry,relating to national economy and people’s livelihood,and it is of great significance to ensure the security and stability in operation of power transmission and distr...Power is an important part of the energy industry,relating to national economy and people’s livelihood,and it is of great significance to ensure the security and stability in operation of power transmission and distribution system.Based on Wireless Sensor Network technology(WSN)and combined with the monitoring and operating requirements of power transmission and distribution system,this paper puts forward an application system for monitoring,inspection,security,and interactive service of layered power transmission and distribution system.Furthermore,this paper demonstrates the system verification projects in Wuxi,Jiangsu Province and Lianxiangyuan Community in Beijing,which have been widely used nationwide.展开更多
This paper uses a novel scenario generation method for tackling the uncertainties of wind power in the transmission network expansion planning(TNEP)problem.A heuristic moment matching(HMM)method is first applied to ge...This paper uses a novel scenario generation method for tackling the uncertainties of wind power in the transmission network expansion planning(TNEP)problem.A heuristic moment matching(HMM)method is first applied to generate the typical scenarios for capturing the stochastic features of wind power,including expectation,standard deviation,skewness,kurtosis,and correlation of multiple wind farms.Then,based on the typical scenarios,a robust TNEP problem is presented and formulated.The solution of the problem is robust against all the scenarios that represent the stochastic features of wind power.Three test systems are used to verify the HMM method and is compared against Taguchi’s Orthogonal Array(OA)method.The simulation results show that the HMM method has better performance than the OA method in terms of the trade-off between robustness and economy.Additionally,the main factors influencing the planning scheme are studied,including the number of scenarios,wind farm capacity,and penalty factors,which provide a reference for system operators choosing parameters.展开更多
The health status of distribution equipment and networks is not considered directly in existing distribution network planning methods.In order to effectively consider the health status and deal with the risk associate...The health status of distribution equipment and networks is not considered directly in existing distribution network planning methods.In order to effectively consider the health status and deal with the risk associated with load and renewable generation uncertainties,this paper presents a new optimal expansion planning approach for distribution network(EPADN)incorporating equipment’s health index(HI)and non-network solutions(NNSs).HI and relevant risk are used to help develop the optimal equipment replacement strategy and temporary NNSs are considered as promising options for handling the uncertainties of load growth,reliability requirements of power supply and output of distributed energy resources(DERs)at a lower cost than network alternatives.An EPADN model using network solutions(NSs)and NNSs is proposed.The planning objectives of the proposed model are safety,reliability,economy,and‘greenness’that are also the meaning of distribution network HI.A method integrating an improved niche genetic algorithm(INGA)and a spanning tree algorithm(STA)is fitted to solve the model presented here for real sized networks with a manageable computational cost.Simulation results of an actual 22-node distribution network in China,illustrate the effectiveness of the proposed approach.展开更多
To satisfy the requirements of accurate operationalrisk assessment of integrated transmission and distribution networks (I-T&D), an integrated operational risk assessment (IORA) algorithm is proposed. Specific cas...To satisfy the requirements of accurate operationalrisk assessment of integrated transmission and distribution networks (I-T&D), an integrated operational risk assessment (IORA) algorithm is proposed. Specific cases demonstrate thatan I-ORA is necessary because it provides accurate handlingof the coupling between transmission and distribution networks,accurate analysis of power supply mode (PSM) changes ofimportant users and helps to improve security and stability ofpower grid operations. Two key technical requirements in theI-ORA algorithm are realized, i.e., integrated topology analysisand integrated power flow calculation. Under a certain contingency, integrated topology analysis is used to assess the risksof substation power cuts, network split and PSM changes ofimportant users, while the integrated power flow calculation,based on the self-adaptive Levenburg-Marquard method andNewton method, can be implemented to assess risks of heavyload/overload and voltage deviation. In addition, the graphicsprocessing unit is used to parallelly process some computationintensive steps. Numerical experiments show that the proposedI-ORA algorithm can realize accurate assessment for the entireI-T&D. In addition, the efficiency and convergence are satisfying,indicating the proposed I-ORA algorithm can significantly benefitreal practice in the coordination operation of I-T&D in the future.展开更多
We address the problem of optimally re-routing the feeders of urban distribution network in Milano,Italy,which presents some peculiarities and significant design challenges.Milano has two separate medium-voltage(MV)di...We address the problem of optimally re-routing the feeders of urban distribution network in Milano,Italy,which presents some peculiarities and significant design challenges.Milano has two separate medium-voltage(MV)distribution networks,previously operated by two different utilities,which grew up independently and incoordinately.This results in a system layout which is inefficient,redundant,and difficult to manage due to different operating procedures.The current utility UNARETI,which is in charge of the overall distribution system,aims at optimally integrating the two MV distribution networks and moving to a new specific layout that offers advantages from the perspectives of reliability and flexibility.We present a mixed-integer programming(MIP)approach for the design of a new network configuration satisfying the so-called 2-step ladder layout required by the planner.The model accounts for the main electrical constraints such as power flow equations,thermal limits of high-voltage(HV)/MV substation transformers,line thermal limits,and the maximum number of customers per feeder.Real power losses are taken into account via a quadratic formulation and a piecewise linear approximation.Computational tests on a small-scale system and on a part of the Milano distribution network are reported.展开更多
文摘The models, methods and their application experiences of a practical GIS(geographic information system)-based computer decision-making support system of urban power distribution network planning with seven subsystems,termed CNP,are described.In each subsystem there is at least one or one set of practical mathematical methobs.Some new models and mathematical methods have been introduced.In the development of CNP the idea of cognitive system engineering has been insisted on,which claims that human and computer intelligence should be combined together to solve the complex engineering problems cooperatively.Practical applications have shown that not only the optimal plan can be automatically reached with many complicated factors considered, but also the computation,analysis and graphic drawing burden can be released considerably.
文摘A distribution network plays an extremely important role in the safe and efficient operation of a power grid.As the core part of a power grid’s operation,a distribution network will have a significant impact on the safety and reliability of residential electricity consumption.it is necessary to actively plan and modify the distribution network’s structure in the power grid,improve the quality of the distribution network,and optimize the planning of the distribution network,so that the network can be fully utilized to meet the needs of electricity consumption.In this paper,a distribution network grid planning algorithm based on the reliability of electricity consumption was completed using ant colony algorithm.For the distribution network structure planning of dual power sources,the parallel ant colony algorithm was used to prove that the premise of parallelism is the interactive process of ant colonies,and the dual power distribution network structure model is established based on the principle of the lowest cost.The artificial ants in the algorithm were compared with real ants in nature,and the basic steps and working principle of the ant colony optimization algorithm was studied with the help of the travelling salesman problem(TSP).Then,the limitations of the ant colony algorithm were analyzed,and an improvement strategy was proposed by using python for digital simulation.The results demonstrated the reliability of model-building and algorithm improvement.
文摘This paper proposes to use the power system simulation software CYME to plan, model and simulate for an actual distribution network for improving the reliability and efficiency, enhancing the efficiency and capacity, simulating the abnormal condition of distribution network, and presenting operation program of safe, reliable and having simulation record statements. The modeling simulation results show that the software module has lots of advantages including high accuracy, ideal reliability, powerful practicality in simulation and analysis of distribution network, it only need to create once model, the model can sufficiently satisfy multifarious types of simulation analysis required for the distribution network planning.
文摘The capacitive reactive power reversal in the urban distribution grid is increasingly prominent at the period of light load in the last years.In severe cases,it will endanger the security and stability of power grid.This paper presents an optimal reactive power compensation method of distribution network to prevent reactive power reverse.Firstly,an integrated reactive power planning(RPP)model with power factor constraints is established.Capacitors and reactors are considered to be installed in the distribution system at the same time.The objective function is the cost minimization of compensation and real power loss with transformers and lines during the planning period.Nodal power factor limits and reactor capacity constraints are new constraints.Then,power factor sensitivity with respect to reactive power is derived.An improved genetic algorithm by power factor sensitivity is used to solve the model.The optimal locations and sizes of reactors and capacitors can avoid reactive power reversal and power factor exceeding the limit.Finally,the effectiveness of the model and algorithm is proven by a typical high-voltage distribution network.
基金supported by the National Natural Science Foundation of China(52077193).
文摘The limitations of the conventional master-slavesplitting(MSS)method,which is commonly applied to power flow and optimal power flow in integrated transmission and distribution(I-T&D)networks,are first analyzed.Considering that the MSS method suffers from a slow convergence rate or even divergence under some circumstances,a least-squares-based iterative(LSI)method is proposed.Compared with the MSS method,the LSI method modifies the iterative variables in each iteration by solving a least-squares problem with the information in previous iterations.A practical implementation and a parameter tuning strategy for the LSI method are discussed.Furthermore,a LSI-PF method is proposed to solve I-T&D power flow and a LSIheterogeneous decomposition(LSI-HGD)method is proposed to solve optimal power flow.Numerical experiments demonstrate that the proposed LSI-PF and LSI-HGD methods can achieve the same accuracy as the benchmark methods.Meanwhile,these LSI methods,with appropriate settings,significantly enhance the convergence and efficiency of conventional methods.Also,in some cases,where conventional methods diverge,these LSI methods can still converge.
文摘This paper describes the study analysis performed to evaluate the available and potential solutions to control the highly increasing short circuit (SC) levels in Kuwait power system. The real Kuwait High Voltage (HV) network was simulated to examine different measures at both 275 kV and 132 kV stations. The simulation results show that the short circuit currents exceed the permissible levels (40 kA in the 132 kV network and 63 kA in the 275 kV network) in some specific points. The examined measures include the a study on changing the neutral point policy, changing some lines from alternating current (AC) to direct current (DC), dividing specific bus bars in some generating stations and applying current limiters. The paper also presents a new plan for the transmission network in order to manage the expected increase in short circuit levels in the future.
基金This work is supported by National Natural Science Foundation of China(No.51077042,No.51577049)Special Foundation of The doctoral program of Higher Education(No.20120094110008).
文摘As the integration of distributed generations(DGs)transforms the traditional distribution network into the active distribution network,voltage stability assessments(VSA)of transmission grid and distribution grid are not suitable to be studied separately.This paper presents a distributed continuation power flow method for VSA of global transmission and distribution grid.Two different parameterization schemes are adopted to guarantee the coherence of load growth in transmission and distribution grids.In the correction step,the boundary bus voltage,load parameter and equivalent power are communicated between the transmission and distribution control centers to realize the distributed computation of load margin.The optimal multiplier technique is used to improve the convergence of the proposed method.The three-phase unbalanced characteristic of distribution networks and the reactive capability limits of DGs are considered.Simulation results on two integrated transmission and distribution test systems show that the proposed method is effective.
文摘With the advancement of clean heating projects and the integration of large-scale distributed heat pumps into rural distribution networks in northern China,power grid companies face tremendous pressure to invest in power grid upgrades,which bring opportunities for renewable power generation integration.The combination of heating by distributed renewable energy with the flexible operation of heat pumps is a feasible alternative for dealing with grid reinforcement challenges resulting from heating electrification.In this paper,a mathematical model of the collaborative planning of distributed wind power generation(DWPG)and distribution network with large-scale heat pumps is developed.In this model,the operational flexibility of the heat pump load is fully considered and the requirements of a comfortable indoor temperature are met.By applying this model,the goals of not only increasing the profit of DWPG but also reducing the cost of the power grid upgrade can be achieved.
基金The project was supported by the National Science and Technology Major Project of the Ministry of Science and Technology of the People’s Republic of China.
文摘Power is an important part of the energy industry,relating to national economy and people’s livelihood,and it is of great significance to ensure the security and stability in operation of power transmission and distribution system.Based on Wireless Sensor Network technology(WSN)and combined with the monitoring and operating requirements of power transmission and distribution system,this paper puts forward an application system for monitoring,inspection,security,and interactive service of layered power transmission and distribution system.Furthermore,this paper demonstrates the system verification projects in Wuxi,Jiangsu Province and Lianxiangyuan Community in Beijing,which have been widely used nationwide.
基金supported in part by the National Natural Science Foundation of China under Grant No.51377027The National Basic Research Program of China under Grant No.2013CB228205by Innovation Project of Guangxi Graduate Education under Grant No.YCSZ2015053.
文摘This paper uses a novel scenario generation method for tackling the uncertainties of wind power in the transmission network expansion planning(TNEP)problem.A heuristic moment matching(HMM)method is first applied to generate the typical scenarios for capturing the stochastic features of wind power,including expectation,standard deviation,skewness,kurtosis,and correlation of multiple wind farms.Then,based on the typical scenarios,a robust TNEP problem is presented and formulated.The solution of the problem is robust against all the scenarios that represent the stochastic features of wind power.Three test systems are used to verify the HMM method and is compared against Taguchi’s Orthogonal Array(OA)method.The simulation results show that the HMM method has better performance than the OA method in terms of the trade-off between robustness and economy.Additionally,the main factors influencing the planning scheme are studied,including the number of scenarios,wind farm capacity,and penalty factors,which provide a reference for system operators choosing parameters.
基金This work was supported in part by the Science and Technology Project of SGCC under Grant No.PD71-18-023.
文摘The health status of distribution equipment and networks is not considered directly in existing distribution network planning methods.In order to effectively consider the health status and deal with the risk associated with load and renewable generation uncertainties,this paper presents a new optimal expansion planning approach for distribution network(EPADN)incorporating equipment’s health index(HI)and non-network solutions(NNSs).HI and relevant risk are used to help develop the optimal equipment replacement strategy and temporary NNSs are considered as promising options for handling the uncertainties of load growth,reliability requirements of power supply and output of distributed energy resources(DERs)at a lower cost than network alternatives.An EPADN model using network solutions(NSs)and NNSs is proposed.The planning objectives of the proposed model are safety,reliability,economy,and‘greenness’that are also the meaning of distribution network HI.A method integrating an improved niche genetic algorithm(INGA)and a spanning tree algorithm(STA)is fitted to solve the model presented here for real sized networks with a manageable computational cost.Simulation results of an actual 22-node distribution network in China,illustrate the effectiveness of the proposed approach.
基金the State Grid Zhejiang Electric Power Co.,Ltd.(Science and Technology Project under Grant 5211JH180081:Research on security evaluation and control technology of smart platform based on dispatch cloud.)。
文摘To satisfy the requirements of accurate operationalrisk assessment of integrated transmission and distribution networks (I-T&D), an integrated operational risk assessment (IORA) algorithm is proposed. Specific cases demonstrate thatan I-ORA is necessary because it provides accurate handlingof the coupling between transmission and distribution networks,accurate analysis of power supply mode (PSM) changes ofimportant users and helps to improve security and stability ofpower grid operations. Two key technical requirements in theI-ORA algorithm are realized, i.e., integrated topology analysisand integrated power flow calculation. Under a certain contingency, integrated topology analysis is used to assess the risksof substation power cuts, network split and PSM changes ofimportant users, while the integrated power flow calculation,based on the self-adaptive Levenburg-Marquard method andNewton method, can be implemented to assess risks of heavyload/overload and voltage deviation. In addition, the graphicsprocessing unit is used to parallelly process some computationintensive steps. Numerical experiments show that the proposedI-ORA algorithm can realize accurate assessment for the entireI-T&D. In addition, the efficiency and convergence are satisfying,indicating the proposed I-ORA algorithm can significantly benefitreal practice in the coordination operation of I-T&D in the future.
文摘We address the problem of optimally re-routing the feeders of urban distribution network in Milano,Italy,which presents some peculiarities and significant design challenges.Milano has two separate medium-voltage(MV)distribution networks,previously operated by two different utilities,which grew up independently and incoordinately.This results in a system layout which is inefficient,redundant,and difficult to manage due to different operating procedures.The current utility UNARETI,which is in charge of the overall distribution system,aims at optimally integrating the two MV distribution networks and moving to a new specific layout that offers advantages from the perspectives of reliability and flexibility.We present a mixed-integer programming(MIP)approach for the design of a new network configuration satisfying the so-called 2-step ladder layout required by the planner.The model accounts for the main electrical constraints such as power flow equations,thermal limits of high-voltage(HV)/MV substation transformers,line thermal limits,and the maximum number of customers per feeder.Real power losses are taken into account via a quadratic formulation and a piecewise linear approximation.Computational tests on a small-scale system and on a part of the Milano distribution network are reported.