期刊文献+
共找到1,601篇文章
< 1 2 81 >
每页显示 20 50 100
Research on Optimization for Units Start During Power System Restoration
1
作者 Jun Chen Wei-xing Zhao +4 位作者 Hua-ying Su Jia-lin Bai Nian Liu Xiao-yan Qiu Qian Liao 《Energy and Power Engineering》 2013年第4期708-712,共5页
Considering units starting and network constraints and the concept of optimization period,a optimization model which is a typical multi-constraint knapsack problem is established to solve the selection optimization pr... Considering units starting and network constraints and the concept of optimization period,a optimization model which is a typical multi-constraint knapsack problem is established to solve the selection optimization problem of units starting in power system restoration period in this paper, and the objective of the model is to maximize the total power generation capability. A relative effectiveness assessment based on a improving data envelopment analysis is adopted to select the initial units to be started, genetic algorithms are employed to solve the knapsack problem to determine the most reasonable units be started at the current time. Finally, IEEE-39 bus system simulation result proves that the proposed model is feasible and effective. 展开更多
关键词 power system unitS START DATA envelopment analysis KNAPSACK PROBLEM
下载PDF
REDUNDANCY TECHNOLOGY FOR AIRCRAFT MULTI-CHANNEL DC POWER SUPPLY SYSTEM 被引量:2
2
作者 杨善水 魏秦华 +2 位作者 黄仙密 居蓉蓉 王莉 《Transactions of Nanjing University of Aeronautics and Astronautics》 EI 2007年第4期305-309,共5页
The redundancy technology for the aircraft multi-channel DC electrical power supply system is studied. In this system, the key loads can obtain power from seven sources. The direct current bus power control unit (DC ... The redundancy technology for the aircraft multi-channel DC electrical power supply system is studied. In this system, the key loads can obtain power from seven sources. The direct current bus power control unit (DC BPCU) is put forward to manage the power supply system automatically. The redundancy innovation is also applied in both hardware and software of DC BPCU. Furthermore, redundancy fault diagnosis is discussed through the existing parts. Experiments and applications show that the proposed aircraft DC power supply system possesses many advantages of high reliability, high automation and so on. 展开更多
关键词 redundant power supply bus power control unit(BPCU) redundancy hardware redundancy software
下载PDF
Multi-model Predictive Control of Ultra-supercritical Coal-fired Power Unit 被引量:6
3
作者 王国良 阎威武 +2 位作者 陈世和 张曦 邵惠鹤 《Chinese Journal of Chemical Engineering》 SCIE EI CAS CSCD 2014年第7期782-787,共6页
The control of ultra-supercritical(USC) power unit is a difficult issue for its characteristic of the nonlinearity, large dead time and coupling of the unit. In this paper, model predictive control(MPC) based on multi... The control of ultra-supercritical(USC) power unit is a difficult issue for its characteristic of the nonlinearity, large dead time and coupling of the unit. In this paper, model predictive control(MPC) based on multi-model and double layered optimization is introduced for coordinated control of USC unit. The linear programming(LP) combined with quadratic programming(QP) is used in steady optimization for computation of the ideal value of dynamic optimization. Three inputs(i.e. valve opening, coal flow and feedwater flow) are employed to control three outputs(i.e. load, main steam temperature and main steam pressure). The step response models for the dynamic matrix control(DMC) are constructed using the three inputs and the three outputs. Piecewise models are built at selected operation points. Double-layered multi-model predictive controller is implemented in simulation with satisfactory performance. 展开更多
关键词 Ultra-supercritical power unit Coordinated control Multi-model constrained predictive control
下载PDF
Power management unit chip design for automobile active-matrix organic light-emitting diode display module 被引量:4
4
作者 KIM J H PARK J H +7 位作者 KIM J H CAO T V LEE T Y BAN H J YANG K KIM H G HA P B KIM Y H 《Journal of Central South University》 SCIE EI CAS 2009年第4期621-628,共8页
A power management unit (PMU) chip supplying dual panel supply voltage, which has a low electro-magnetic interference (EMI) characteristic and is favorable for miniaturization, is designed. A two-phase charge pump... A power management unit (PMU) chip supplying dual panel supply voltage, which has a low electro-magnetic interference (EMI) characteristic and is favorable for miniaturization, is designed. A two-phase charge pump circuit using external pumping capacitor increases its pumping current and works out the charge-loss problem by using bulk-potential biasing circuit. A low-power start-up circuit is also proposed to reduce the power consumption of the band-gap reference voltage generator. And the ring oscillator used in the ELVSS power circuit is designed with logic devices by supplying the logic power supply to reduce the layout area. The PMU chip is designed with MagnaChip's 0.25 μ high-voltage process. The driving currents of ELVDD and ELVSS are more than 50 mA when a SPICE simulation is done. 展开更多
关键词 DC-DC converter AMOLED charge pumping power management unit (PMU) dual panel supply voltage
下载PDF
LVP Modeling and Dynamic Characteristics Prediction of A Hydraulic Power Unit in Deep-Sea 被引量:1
5
作者 曹学鹏 叶敏 +2 位作者 邓斌 张翠红 俞祖英 《China Ocean Engineering》 SCIE EI CSCD 2013年第1期17-32,共16页
A hydraulic power unit (HPU) is the driving "heart" of deep-sea working equipment. It is critical to predict its dynamic performances in deep-water before being immerged in the seawater, while the experimental tes... A hydraulic power unit (HPU) is the driving "heart" of deep-sea working equipment. It is critical to predict its dynamic performances in deep-water before being immerged in the seawater, while the experimental tests by simulating deep-sea environment have many disadvantages, such as expensive cost, long test cycles, and difficult to achieve low-temperature simulation, which is only used as a supplementary means for confirmatory experiment. This paper proposes a novel theoretical approach based on the linear varying parameters (LVP) modeling to foresee the dynamic performances of the driving unit. Firstly, based on the varying environment features, dynamic expressions of the compressibility and viscosity of hydranlic oil are derived to reveal the fluid performances changing. Secondly, models of hydraulic system and electrical system are accomplished respectively through studying the control process and energy transfer, and then LVP models of the pressure and flow rate control is obtained through the electro-hydraulic models integration. Thirdly, dynamic characteristics of HPU are obtained by the model simulating within bounded closed sets of varying parameters. Finally, the developed HPU is tested in a deep-sea imitating hull, and the experimental results are well consistent with the theoretical analysis outcomes, which clearly declare that the LVP modeling is a rational way to foresee dynamic performances of HPU. The research approach and model analysis results can be applied to the predictions of working properties and product designs for other deep-sea hydraulic pump. 展开更多
关键词 hydraulic power unit (HPLO linear varying parameters (L VP) modeling dynamic viscosity characteristics prediction
下载PDF
Effect of Angle of Attack and Blade Tip Vortex on the Noise Level of Tandem Wind Rotors of an Intelligent Wind Power Unit
6
作者 Fumiha Odo Ahmed Mohamed Galal +1 位作者 Akira Enishi Toshiaki Kanemoto 《Journal of Environmental Science and Engineering(A)》 2013年第12期736-743,共8页
The authors have invented a superior wind power unit, which is composed of tandem wind rotors and double rotational armature type generator without the traditional stator. This unit is called "intelligent wind power ... The authors have invented a superior wind power unit, which is composed of tandem wind rotors and double rotational armature type generator without the traditional stator. This unit is called "intelligent wind power unit". At upwind type unit, the large-sized front wind rotor and the small-sized rear wind rotor drive the inner and the outer rotational armatures respectively, in keeping the rotational torque counter-balance between both wind rotors/armatures. This paper discusses the acoustic noise emitted from the tandem wind rotors. As for tandem wind rotors, the tip vortex shedding from the front wind rotor may make a loud acoustic noise if the vortex attacks the rear wind rotor. Intelligent wind power unit, however, has no chance to increase the acoustic noise level by the tip vortex because the diameter of the front wind rotor is reasonably larger than the diameter of the rear wind rotor. The vorticity generated in the boundary layer on the blade can be observed obviously at wake flow and can be evaluated quantitatively at flow conditions measured by a hot-wire anemometer at a wind tunnel. The flow conditions have shown that the radial and axial components of vorticities contribute to emit the acoustic noise. 展开更多
关键词 Acoustic noise INTELLIGENT TANDEM wind power unit.
下载PDF
Research on the Prediction of Load Regulation Capacity for Supercritical Thermal Power Unit
7
作者 Yong He Zhuo Huang +3 位作者 Yaohua Tang Weimin Guo Yuanli Cai Haonan Jiang 《Journal of Power and Energy Engineering》 2020年第8期23-36,共14页
Both the modeling and the load regulation capacity prediction of a supercritical power plant are investigated in this paper. Firstly, an indirect identification method based on subspace identification method is propos... Both the modeling and the load regulation capacity prediction of a supercritical power plant are investigated in this paper. Firstly, an indirect identification method based on subspace identification method is proposed. The obtained identification model is verified by the actual operation data and the dynamic characteristics of the system are well reproduced. Secondly, the model is used to predict the load regulation capacity of thermal power unit. The power, main steam pressure, main steam temperature and other parameters are simulated respectively when the unit load is going up and down. Under the actual constraints, the load regulation capacity of thermal power unit can be predicted quickly. 展开更多
关键词 Supercritical Thermal power unit Subspace Identification Indirect Identification Load Regulation
下载PDF
Maximal loads acting on legs of powered roof support unit in longwalls with bumping hazards
8
作者 Stanislaw Szweda(Silesian Technical University Faculty of Mining and Geology Mining Mechanization Institute Gliwice, Poland) 《Journal of Coal Science & Engineering(China)》 2001年第2期1-15,共15页
In the article the results of measurements of the resultant force in the legs of a powered roof support unit, caused by a dynamic interaction of the rock mass, are discussed. The measurements have been taken in the lo... In the article the results of measurements of the resultant force in the legs of a powered roof support unit, caused by a dynamic interaction of the rock mass, are discussed. The measurements have been taken in the longwalls mined with a roof fall, characterized by the highest degree of bumping hazard. It has been stated that the maximal force in the legs F m, recorded during a dynamic interaction of the rock mass, is proportional to the initial static force in the legs F st,p . Therefore a need for a careful selection of the initial load of the powered roof support, according to the local mining and geological conditions, results from such a statement. Setting the legs with the supporting load exceeding the indispensable value for keeping the direct roof solids in balance, deteriorating the operational parameters of a longwall system also has a disadvantageous influence on the value of the force in the legs and the rate of its increase, caused by a dynamic interaction of the rock mass. A correct selection of the initial load causes a decrease in the intensity of a dynamic interaction of the rock mass on powered roof supports, which also has an advantageous influence on their life. Simultaneously with the measurements of the resultant force in the legs, the vertical acceleration of the canopy was also recorded. It has enabled to prove that the external dynamic forces may act on the unit both from the roof as well as from the floor. The changes of the force in the legs caused by dynamic phenomena intrinsically created in the roof and changes of the force in the legs caused by blasting explosives in the roof of the working, have been analyzed separately. It has been stated that an increase in the loads of legs, caused by intrinsic phenomena is significantly higher than a force increase in the legs caused by blasting. It means that powered roof supports, to be operated in the workings, where the bumping hazard occurs, will also transmit the loads acting on a unit during blasting. The majority of recorded force changes in the legs has been caused by a dynamic interaction of the roof. They are characterized by a load increase coefficient K d, satisfying the inequality 1 06<K d =F m /F st,p <1 24. A much smaller number of cases, when the external load acted on the bases, was recorded. Individual, recorded results of measurements indicate that changes of the force in the legs, caused by external loads of this type, run more intensively due to roof loads (1 08< K d<1 80),particularly in these cases when the near the roof layer of the seam is under mining. A determination of more precise relations among the changes of forces in the legs, caused by a dynamic interaction of the floor and the bases and the mining and geological conditions requires a performance of additional underground tests. 展开更多
关键词 LONGWALL bumping hazard powered roof support unit
下载PDF
Repacking practice for G-3 engineering driller power unit with drive shaft of dual channel reverse circulation
9
作者 Lihong ZHU Kun YIN Qingyan WANG Yong HUANG 《Global Geology》 2008年第1期42-46,共5页
In order to satisfy operating requirements for constant core drilling technology in reverse circulation with hollow-through DTH,the power unit of G-3 engineering driller was ameliorated. The new one with dual channel ... In order to satisfy operating requirements for constant core drilling technology in reverse circulation with hollow-through DTH,the power unit of G-3 engineering driller was ameliorated. The new one with dual channel drive shaft, achieved the perfect assemble with transmission structure of the original power unit. It could interconvert according to need by using two sets of drive shafts with direct and reverse circulation. The repacked G-3 engineering driller carried on experiment in the field test in Luanchuan molybdenum mine of Henan, whose effect was very good. 展开更多
关键词 power unit drive shaft reverse circulation constant core drilling technique G-3 engineering driller
下载PDF
Unit stream power,minimum energy dissipation rate,and river engineering
10
作者 Chih Ted Yang 《水道港口》 2010年第5期317-317,共1页
Unit stream power is the most important and dominant parameter for the determination of transport rate of sand,gravel,and hyper-concentrated sediment with wash load.Minimum energy dissipation rate theory,or its simpli... Unit stream power is the most important and dominant parameter for the determination of transport rate of sand,gravel,and hyper-concentrated sediment with wash load.Minimum energy dissipation rate theory,or its simplified minimum unit stream power and minimum stream power theories,can provide engineers the needed theoretical basis for river morphology and river engineering studies.The Generalized Sediment Transport model for Alluvial River Simulation computer mode series have been developed based on the above theories.The computer model series have been successfully applied in many countries.Examples will be used to illustrate the applications of the computer models to solving a wide range of river morphology and river engineering problems. 展开更多
关键词 computer model minimum energy dissipation rate river engineering river morphology sediment transport unit stream power
下载PDF
Research and Demonstration of Direct Air-Cooling System for 600-MW Fossil-Fired Power Plants
11
作者 Zhang Xiaolu 1 , Wang Jianping 2 , Hu Zhenling 3 1. China Power Investment Corporation 2. China Power Engineering Consulting Group Corporation 3. Harbin Air Conditioning Co., Ltd., 《Electricity》 2011年第4期46-51,共6页
Given the distribution feature of resources such as coal and water, the requirements for the development of Chinese power industry, and the fact of monopoly by foreign companies, it is very necessary and significant t... Given the distribution feature of resources such as coal and water, the requirements for the development of Chinese power industry, and the fact of monopoly by foreign companies, it is very necessary and significant to independently research and develop air-cooling technologies. Through experimental research, simulative calculation, process and equipment development, field tests and a demonstration project, the design and operation technologies for air-cooling system are grasped and relevant key equipment is developed. The results of the demonstration project show that the technical indicators for the air-cooling system have met or exceeded the design requirements. Part of the research results have been incorporated into the relevant national design standards. The technologies developed have been applied to more than 23 sets of thermal power units of or above 600 MW in China. 展开更多
关键词 thermal power generating unit air-cooling direct air-cooling project demonstration
下载PDF
2-MW wind power unit successfully manufactured
12
《Electricity》 2008年第2期13-,共1页
As of the end of April, by autonomous research anddevelopment on the basis of imported technologies,Beijing Beizhong Steam-Turbo Machinery Company Ltd.had successfully completed trial production of a 2-MWlow-temperatu... As of the end of April, by autonomous research anddevelopment on the basis of imported technologies,Beijing Beizhong Steam-Turbo Machinery Company Ltd.had successfully completed trial production of a 2-MWlow-temperature type wind power generating unit; andnow the company has put the new type of wind 展开更多
关键词 MW wind power unit successfully manufactured AS
下载PDF
1133.5 MW Small Thermal Power Units to be Shut Down in Jiangsu
13
《Electricity》 1999年第3期51-51,共1页
关键词 MW Small Thermal power units to be Shut Down in Jiangsu DOWN
下载PDF
Speed up the Retrofit of Thermal Power Generating Units, Raise the Effectiveness of Power Plant Comprehensively
14
作者 Jiang Zhesheng 《Electricity》 2000年第1期13-16,共4页
关键词 Speed up the Retrofit of Thermal power Generating units Raise the Effectiveness of power Plant Comprehensively
下载PDF
Sensitivity Analysis of a 50+ Coal-Fired Power Unit Efficiency
15
作者 Katarzyna Stepczyńska-Drygas Slawomir Dykas Krystian Smolka 《Journal of Power and Energy Engineering》 2015年第12期19-31,共13页
The coal-fired power unit integration with a CO2 capture and compression installation involves a considerable rise in the costs of electricity generation. Therefore, there is a need for a continuous search for methods... The coal-fired power unit integration with a CO2 capture and compression installation involves a considerable rise in the costs of electricity generation. Therefore, there is a need for a continuous search for methods of improving the electricity generation efficiency in steam power plants. One technology which is especially promising is the advanced ultra-supercritical (A-USC) power unit. Apart from steam parameters upstream the turbine, the overall efficiency also depends on the efficiency values of individual elements of the plant and the size of energy consumption of the process of CO2 sequestration from the boiler flue gases. These problems are considered herein to emphasize that without specifying the efficiency values of the power plant main elements the information concerning its electricity generation efficiency is incomplete. This paper presents the influence of the efficiency of individual elements of the power plant on its electricity generation efficiency. The lack of information of the efficiencies of the power plant individual elements, by presenting its overall efficiency, may lead to the false conclusions. 展开更多
关键词 Sensitivity Analysis A-USC power unit Efficiency CO_(2) Capture
下载PDF
The Largest Thermal Power Unit in Northwest Network Starts Construction Soon
16
《Electricity》 1997年第3期50-50,共1页
关键词 The Largest Thermal power unit in Northwest Network Starts Construction Soon
下载PDF
Source-Load Coordinated Optimal Scheduling Considering the High Energy Load of Electrofused Magnesium and Wind Power Uncertainty
17
作者 Juan Li Tingting Xu +3 位作者 Yi Gu Chuang Liu Guiping Zhou Guoliang Bian 《Energy Engineering》 EI 2024年第10期2777-2795,共19页
In fossil energy pollution is serious and the“double carbon”goal is being promoted,as a symbol of fresh energy in the electrical system,solar and wind power have an increasing installed capacity,only conventional un... In fossil energy pollution is serious and the“double carbon”goal is being promoted,as a symbol of fresh energy in the electrical system,solar and wind power have an increasing installed capacity,only conventional units obviously can not solve the new energy as the main body of the scheduling problem.To enhance the systemscheduling ability,based on the participation of thermal power units,incorporate the high energy-carrying load of electro-melting magnesiuminto the regulation object,and consider the effects on the wind unpredictability of the power.Firstly,the operating characteristics of high energy load and wind power are analyzed,and the principle of the participation of electrofusedmagnesiumhigh energy-carrying loads in the elimination of obstructedwind power is studied.Second,a two-layer optimization model is suggested,with the objective function being the largest amount of wind power consumed and the lowest possible cost of system operation.In the upper model,the high energy-carrying load regulates the blocked wind power,and in the lower model,the second-order cone approximation algorithm is used to solve the optimizationmodelwithwind power uncertainty,so that a two-layer optimizationmodel that takes into account the regulation of the high energy-carrying load of the electrofused magnesium and the uncertainty of the wind power is established.Finally,the model is solved using Gurobi,and the results of the simulation demonstrate that the suggested model may successfully lower wind abandonment,lower system operation costs,increase the accuracy of day-ahead scheduling,and lower the final product error of the thermal electricity unit. 展开更多
关键词 High energy load of electrofused magnesium wind energy consumption thermal power unit wind power uncertainty two-layer optimization
下载PDF
Contribution of UHV Grid to United National Power Market
18
作者 Guo Lei1, Wei Bin1,, Ma Li1 and Cheng Wen2 1. State Power Economic Research Institute 2. North China Electric Power University 《Electricity》 2010年第2期26-29,共4页
Power market construction is an important part of the marketization reform in China's electric power industry and an essential part of the economic system reform in China. With the social and economic development,... Power market construction is an important part of the marketization reform in China's electric power industry and an essential part of the economic system reform in China. With the social and economic development, the contradiction between distribution of energy resources and development of regional economies gets increasingly noticeable, and a united national power market is consequentially required to optimize the allocation of energy resources over the whole country. Analyses indicate that the development of UHV grid will provide a strong material support for the united national power market by expanding market coverage, lowering load fluctuation and promoting diversif ication of power resources. 展开更多
关键词 Contribution of UHV Grid to united National power Market
下载PDF
Unit 2 of Tianjin Beijiang Power Plant commissioned
19
《Electricity》 2010年第1期29-,共1页
Tianjin Beijiang Power Plant, one of the first series of Circular Economy Demonstration Project in the country, successfully put its second unit into operation on November 30, 2009
关键词 unit 2 of Tianjin Beijiang power Plant commissioned PROJECT
下载PDF
500 MW Unit Simulator for Panshan Thermal Power Plant Passed Acceptance
20
《Electricity》 1996年第4期36-36,共1页
After a thorough demonstration in Panshan Thermal Power Plant, the 500 MW super critical pressure unit simulator developed by the Simulation & Control Institute under the North China University of Electric Power w... After a thorough demonstration in Panshan Thermal Power Plant, the 500 MW super critical pressure unit simulator developed by the Simulation & Control Institute under the North China University of Electric Power was accepted by experts from the North China Electric Power Group Company on 3rd August 1996. 展开更多
关键词 MW unit Simulator for Panshan Thermal power Plant Passed Acceptance IP
下载PDF
上一页 1 2 81 下一页 到第
使用帮助 返回顶部