An active distribution system power-supply planning model considering cooling,heating and power load balance is proposed in this paper.A regional energy service company is assumed to be in charge of the investment and...An active distribution system power-supply planning model considering cooling,heating and power load balance is proposed in this paper.A regional energy service company is assumed to be in charge of the investment and operation for the system in the model.The expansion of substations,building up distributed combined cooling,heating and power(CCHP),gas heating boiler(GHB)and air conditioner(AC)are included as investment planning options.In terms of operation,the load scenarios are divided into heating,cooling and transition periods.Also,the extreme load scene is included to assure the power supply reliability of the system.Numerical results demonstrate the effectiveness of the proposed model and illustrate the economic benefits of applying distributed CCHP in regional power supply on investment and operation.展开更多
The internal structure of the inertial measurement unit(IMU)in active state is easily damaged in the high overload environment.So that the IMU is usually required to be powered within the disappearance of the high ove...The internal structure of the inertial measurement unit(IMU)in active state is easily damaged in the high overload environment.So that the IMU is usually required to be powered within the disappearance of the high overload.In this paper,a mechanical switch is designed to enable the IMU based on the analysis of the impact of high overload on the power-supply circuit.In which,parameters of mechanical switch are determined through theoretical calculation and data analysis.The innovation of the proposed structure lies in that the mechanical switch is triggered through the high overload process and could provide a delay signal for the circuit.After all,the proposed switch is tested through mechanical simulation,impact test and practical test.The experimental results show that the designed mechanical switch can effectively and reliably provide the delay for the circuit and guarantee operation of the IMU under high overload.展开更多
基金This project is supported by National High Technology Research and Development Program of China(863 Program)(No.2014AA051902).
文摘An active distribution system power-supply planning model considering cooling,heating and power load balance is proposed in this paper.A regional energy service company is assumed to be in charge of the investment and operation for the system in the model.The expansion of substations,building up distributed combined cooling,heating and power(CCHP),gas heating boiler(GHB)and air conditioner(AC)are included as investment planning options.In terms of operation,the load scenarios are divided into heating,cooling and transition periods.Also,the extreme load scene is included to assure the power supply reliability of the system.Numerical results demonstrate the effectiveness of the proposed model and illustrate the economic benefits of applying distributed CCHP in regional power supply on investment and operation.
基金This work was supported by the National Natural Science Foundation of China(No.61803203).
文摘The internal structure of the inertial measurement unit(IMU)in active state is easily damaged in the high overload environment.So that the IMU is usually required to be powered within the disappearance of the high overload.In this paper,a mechanical switch is designed to enable the IMU based on the analysis of the impact of high overload on the power-supply circuit.In which,parameters of mechanical switch are determined through theoretical calculation and data analysis.The innovation of the proposed structure lies in that the mechanical switch is triggered through the high overload process and could provide a delay signal for the circuit.After all,the proposed switch is tested through mechanical simulation,impact test and practical test.The experimental results show that the designed mechanical switch can effectively and reliably provide the delay for the circuit and guarantee operation of the IMU under high overload.