The access to electricity in rural areas is extremely limited, but it is crucial for all citizens. The population in rural areas of sub-Saharan African (SSA) countries is generally low, making it economically unfeasib...The access to electricity in rural areas is extremely limited, but it is crucial for all citizens. The population in rural areas of sub-Saharan African (SSA) countries is generally low, making it economically unfeasible to implement traditional rural electrification (CRE) projects due to the high cost of establishing the necessary distribution infrastructure. To address this cost issue, one alternative technology for rural electrification (URE) that can be explored is the Capacitor Coupled Substation (CCS) technology. CCS is a cost-effective solution for supplying electricity to rural areas. The research is necessitated by the need to offer a cost-effective technology for supplying electricity to sparsely populated communities. This paper examines the impact on the transmission network when a 400 kV/400V CCS is connected to it. The system response when a CCS is connected to the network was modeled using MATLAB/Si-mulink. The results, based on the fixed load of 80 kW, showed negligible interference on the transmission line voltage. However, there was minor impact on the parameters downstream of the tapping point. These findings were further supported by introducing a fault condition to the CCS, which showed that interferences with the CCS could affect the overall stability of the transmission network downstream of the tapping node, similar to the behavior of an unstable load.展开更多
The Power System Simulation Lab constructed specifically for the Three Gorges AC/DC hybrid transmissionstudy is equipped mainly with a real-time power system simulator, which can jointly operate with existing TNA andH...The Power System Simulation Lab constructed specifically for the Three Gorges AC/DC hybrid transmissionstudy is equipped mainly with a real-time power system simulator, which can jointly operate with existing TNA andHVDC Simulator respectively. Appraised by the State Power Corporation 3 years ago, this Lab was proved reachinginternational advanced level. Several large-scaled power system studies, such as the "Simplified Three Gorges PowerSystem Study" have achieved good results.[展开更多
A flexible flat torque converter was proposed to fulfill the requirement of miniaturization and power density maximization for automobiles.Constructed by two arcs joined by lines,the torus was designed directly from d...A flexible flat torque converter was proposed to fulfill the requirement of miniaturization and power density maximization for automobiles.Constructed by two arcs joined by lines,the torus was designed directly from design path.The influence of flatness on the performance of the torque converter was evaluated.The software CFX and standard k-ε model were adopted to simulate the internal flow fields of the torque converter under different flatness ratios.The results indicated that the performance of the torque converter got worse as the flatness declined,but the capacity of pump increased.The efficiency and the torque ratio dropped slightly as the flatness ratio decreased.So the torque converter could be squashed appropriately to get high power density without too much efficiency sacrifice.But when the flatness ratio was below 0.2,there was a significant drop in the efficiency.展开更多
Numerical simulation of enhanced fluid flow characteristics in a three-stage double-stirring extraction tank was conducted with the coupling of an Eulerian multiphase flow model and a Morsi-Alexander interphase drag f...Numerical simulation of enhanced fluid flow characteristics in a three-stage double-stirring extraction tank was conducted with the coupling of an Eulerian multiphase flow model and a Morsi-Alexander interphase drag force model. Results show that the addition of a stirring device into the settler can efficiently reduce the volume fraction of out-of-phase impurity in the outlet, and accelerate the settling separation of oil-water mixture. Such addition can also effectively break down the oil-water-wrapped liquid droplets coming from the mixer, inhibit reflux from the outlet, and improve the oil-water separation. The addition of a stirring device induces ignorable power consumption compared with that by the mixer, and can thus facilitate the commercialized promotion of this novel equipment.展开更多
The superconducting tokamak HT-7U [1] has been designed by the Institute of Plasma Physics since 1998 and will be set up before 2003. The 1.2 MW /2.45 GHz HT-7U LHCD (Lower hybrid current drive) system which being the...The superconducting tokamak HT-7U [1] has been designed by the Institute of Plasma Physics since 1998 and will be set up before 2003. The 1.2 MW /2.45 GHz HT-7U LHCD (Lower hybrid current drive) system which being the most efficient non-induction device can heat the plasma and drive the plasma current has been efficiently in operation 'owl and a particular design of the 2.8 MW/-35 kV high-voltage DC power supply has been already completed and will apply to the klystron of LHCD on HT-7 and the future HT-7U, and the project of the power supply has been examined and approved professionally by an authorized group of high-level specialist in the institute of Plasma Physics. The detailed design of the power supply and the simulation results are referred in the paper.展开更多
In order to effectively imitate the dynamic operation characteristics of the HVDC (high voltage direct current) power transmission system at a real ±500kV HVDC transmission project, the electromechanical-electr...In order to effectively imitate the dynamic operation characteristics of the HVDC (high voltage direct current) power transmission system at a real ±500kV HVDC transmission project, the electromechanical-electromagnetic transient hybrid simulation was carried out based on advanced digital power system simulator (ADPSS). In the simulation analysis, the built hybrid model's dynamic response outputs under three different fault conditions are considered, and by comparing with the selected fault recording waveforms, the validities of the simulation waveforms are estimated qualitatively. It can be ascertained that the hybrid simulation model has the ability to describe the HVDC system's dynamic change trends well under some special fault conditions.展开更多
The exclusive use of renewable energies is today an essential nautical concern. Nowadays, the onboard energy generation comes mainly from diesel oil, which is in user mind the simplest way. Our objective is to develop...The exclusive use of renewable energies is today an essential nautical concern. Nowadays, the onboard energy generation comes mainly from diesel oil, which is in user mind the simplest way. Our objective is to develop a self-adaptive management system of the onboard energy in order to change the user mind. We introduce models for energy production, storage and consumption that fit with the yachting environment, which is mobile and not as predictable as the home automation case. These models are combined within a configurable simulator. This simulator can handle user's boat equipment, reproduce sailing conditions and so help to validate the models and to study different management strategies. This first step is necessary to develop a smart system able to manage sailing energy in order to answer the main issue: assuring safety and optimizing comfort according to user demands.展开更多
This paper presents the concept of a Dielectric-lined Multiwave Cerenkov Generator producing high power millimeter waves, which has been investigated with a two and onehalf dimensional electromagnetic relativistic Par...This paper presents the concept of a Dielectric-lined Multiwave Cerenkov Generator producing high power millimeter waves, which has been investigated with a two and onehalf dimensional electromagnetic relativistic Particle-in-Cell (PIC) plasma simulation code. Themodified device can operate in a lower diode-voltage regime with much higher radiation efficiencyand slight downshift of operation frequency. There exist the optima for the permittivity of thedielectric liner and for the magnitude of the guiding magnetic field. The required intensity of theguiding field is reduced by the introduction of the liner. The enhanced propagation of the electronbeam is studied in the presence of the liner.展开更多
This paper develops a high time-resolution optimal power generation mix model in its time resolution of 10 minutes on 365 days by linear programming technique. The model allows us to analyse the massive deployment of ...This paper develops a high time-resolution optimal power generation mix model in its time resolution of 10 minutes on 365 days by linear programming technique. The model allows us to analyse the massive deployment of photovoltaic system and wind power generation in power system explicitly considering those short-term output variation. PV (photovoltaic) and wind output are estimated, employing meteorological database. Simulation results reveal that variable fluctuation derived from a high penetration level of those renewables is controlled by quick load following operation of natural gas combined cycle power plant, pumped-storage hydro power, stationary NAS (sodium and sulfur) battery and the output suppression control of PV and wind. It additionally turns out that the operational configuration of those technologies for the renewable variability differs significantly depending on those renewable output variations in each season and solving the seasonal electricity imbalance as well as the daily imbalance is important if variable renewables are massively deployed.展开更多
The adaptive simulation algorithm (ASA) based on stiffness recognition is an effective and applicable simulation method. In this paper, a principle of the said method is briefly introduced and more importance is stres...The adaptive simulation algorithm (ASA) based on stiffness recognition is an effective and applicable simulation method. In this paper, a principle of the said method is briefly introduced and more importance is stressed in studying the value of its application by realizing it in MMS.展开更多
The present paper deals with the development of a modular, flexible and structured block to block approach for the study of regulators by implementing the different blocks on a DSP (digital signal processor). The pr...The present paper deals with the development of a modular, flexible and structured block to block approach for the study of regulators by implementing the different blocks on a DSP (digital signal processor). The proposed low-cost approach has been applied and validated by the implementation of an industrial regulator in a real time hardware-in-the-loop simulation of a mixed islanded power network including precise models of the hydraulic system. The studied network is constituted of three different types of electrical power generation systems and a consumer.展开更多
电力系统具有良好的稳定性是保证电网正常运行的关键,充分应用Power World Simulator电力系统仿真软件对我国西北某地区实际电网进行安全稳定性分析。根据给定的实际电网运行数据搭建电网模型并进行潮流计算,将潮流计算结果与静态安全...电力系统具有良好的稳定性是保证电网正常运行的关键,充分应用Power World Simulator电力系统仿真软件对我国西北某地区实际电网进行安全稳定性分析。根据给定的实际电网运行数据搭建电网模型并进行潮流计算,将潮流计算结果与静态安全理论相结合,对该地区电网模型进行N-1静态安全性分析。针对线路负载率过高以及节点母线电压越限的情况,提出解决措施以达到提高电网运行稳定性的目的。展开更多
Wind energy is one of the most promising renewable energy sources, straight-bladed vertical axis wind turbine(S-VAWT) appears to be particularly promising for the shortage of fossil fuel reserves owing to its distinct...Wind energy is one of the most promising renewable energy sources, straight-bladed vertical axis wind turbine(S-VAWT) appears to be particularly promising for the shortage of fossil fuel reserves owing to its distinct advantages, but suffers from poor self-starting and low power coefficient. Variable-pitch method was recognized as an attractive solution to performance improvement, thus majority efforts had been devoted into blade pitch angle effect on aerodynamic performance. Taken into account the local flow field of S-VAWT, mathematical model was built to analyze the relationship between power outputs and pitch angle. Numerical simulations on static and dynamic performances of blade were carried out and optimized pitch angle along the rotor were presented. Comparative analyses of fixed pitch and variable-pitch S-VAWT were conducted, and a considerable improvement of the performance was obtained by the optimized blade pitch angle, in particular, a relative increase of the power coefficient by more than 19.3%. It is further demonstrated that the self-starting is greatly improved with the optimized blade pitch angle.展开更多
In order to lower the power consumption and improve the coefficient of resource utilization of current cloud computing systems, this paper proposes two resource pre-allocation algorithms based on the "shut down the r...In order to lower the power consumption and improve the coefficient of resource utilization of current cloud computing systems, this paper proposes two resource pre-allocation algorithms based on the "shut down the redundant, turn on the demanded" strategy here. Firstly, a green cloud computing model is presented, abstracting the task scheduling problem to the virtual machine deployment issue with the virtualization technology. Secondly, the future workloads of system need to be predicted: a cubic exponential smoothing algorithm based on the conservative control(CESCC) strategy is proposed, combining with the current state and resource distribution of system, in order to calculate the demand of resources for the next period of task requests. Then, a multi-objective constrained optimization model of power consumption and a low-energy resource allocation algorithm based on probabilistic matching(RA-PM) are proposed. In order to reduce the power consumption further, the resource allocation algorithm based on the improved simulated annealing(RA-ISA) is designed with the improved simulated annealing algorithm. Experimental results show that the prediction and conservative control strategy make resource pre-allocation catch up with demands, and improve the efficiency of real-time response and the stability of the system. Both RA-PM and RA-ISA can activate fewer hosts, achieve better load balance among the set of high applicable hosts, maximize the utilization of resources, and greatly reduce the power consumption of cloud computing systems.展开更多
This paper is concerned with the design and application of coaxial mixers with the aid of analysis of interaction between each individual impeller. Two types of coaxial mixers pitched blade turbine(PBT)-helical ribbon...This paper is concerned with the design and application of coaxial mixers with the aid of analysis of interaction between each individual impeller. Two types of coaxial mixers pitched blade turbine(PBT)-helical ribbon(HR)and inner-outer HR operated in laminar regime were studied experimentally and numerically. The interaction implies synergistic and interference effects, which was revealed through the investigation of axial circulation rate, energy dissipation rate and power consumption. The influence factors including rotational speed ratio,rotating mode and impeller configuration were explored systematically. Quantitative analysis of power consumption involves three parameters: rate of variation in power consumption, interactive mode and ratio of power consumption. Analysis indicated that some important properties were embodied in the power curve.These properties are one-way and two-way interactions, critical speed ratio and dominant impeller. Finally, a new suggestion for power estimation was given.展开更多
Network processors are used in the core node of network to flexibly process packet streams. With the increase of performance, the power of network processor increases fast, and power and cooling become a bottleneck. A...Network processors are used in the core node of network to flexibly process packet streams. With the increase of performance, the power of network processor increases fast, and power and cooling become a bottleneck. Architecture-level power conscious design must go beyond low-level circuit design. Architectural power and performance tradeoff should be considered at the same time. Simulation is an efficient method to design modem network processor before making chip. In order to achieve the tradeoff between performance and power, the processor simulator is used to design the architecture of network processor. Using Netbeneh, Commubench benchmark and processor simulator-SimpleScalar, the performance and power of network processor are quantitatively evaluated. New performance tradeoff evaluation metric is proposed to analyze the architecture of network processor. Based on the high performance lnteI IXP 2800 Network processor eonfignration, optimized instruction fetch width and speed ,instruction issue width, instruction window size are analyzed and selected. Simulation resuits show that the tradeoff design method makes the usage of network processor more effectively. The optimal key parameters of network processor are important in architecture-level design. It is meaningful for the next generation network processor design.展开更多
This study designs and proposes a method for evaluating the configuration of energy storage for integrated re-newable generation plants in the power spot market,which adopts a two-level optimization model of“system s...This study designs and proposes a method for evaluating the configuration of energy storage for integrated re-newable generation plants in the power spot market,which adopts a two-level optimization model of“system simulation+plant optimization”.The first step is“system simulation”which is using the power market simu-lation model to obtain the initial nodal marginal price and curtailment of the integrated renewable generation plant.The second step is“plant optimization”which is using the operation optimization model of the integrated renewable generation plant to optimize the charge-discharge operation of energy storage.In the third step,“sys-tem simulation”is conducted again,and the combined power of renewable and energy storage inside the plant is brought into the system model and simulated again for 8,760 h of power market year-round to quantify and compare the power generation and revenue of the integrated renewable generation plant after applying energy storage.In the case analysis of the provincial power spot market,an empirical analysis of a 1 GW wind-solar-storage integrated generation plant was conducted.The results show that the economic benefit of energy storage is approximately proportional to its capacity and that there is a slowdown in the growth of economic benefits when the capacity is too large.In the case that the investment benefit of energy storage only considers the in-come of electric energy-related incomes and does not consider the income of capacity mechanism and auxiliary services,the income of energy storage cannot fulfill the economic requirements of energy storage investment.展开更多
This paper describes a stabilization effect after installating an adjustable speed generator (ASG) in a multi machine power system. A personal computer based ASG module has been de veloped for the simulations in...This paper describes a stabilization effect after installating an adjustable speed generator (ASG) in a multi machine power system. A personal computer based ASG module has been de veloped for the simulations in parallel with the analog power system simulator i n the Research Laboratory of the Kyushu Electric Power Co. The three phase ins t antaneous value based ASG model has been developed in the Matlab/Simulink envir onment for its detailed and real time simulations, which have been performed on a digital signal processor (DSP) board with AD and DA conversion interfaces inst alled in a personal computer (PC). Simulational results indicate the hig hly improved overall stability of the multi machine power system after installa ting the ASG.展开更多
Urban railway systems differ greatly from general power systems in that they use direct current(DC)power supply and that the location and power requirements of the loads change.The position and power consumption of th...Urban railway systems differ greatly from general power systems in that they use direct current(DC)power supply and that the location and power requirements of the loads change.The position and power consumption of the load shall be interpreted continuously every second,or in a fixed unit of time,for a specific period of time during which the operating conditions are repeated.The additional analysis of energy-saving systems being considered as energy efficiency improvement methods requires more complex load flow analysis algorithms.Simulations are performed load flow every time step.The power of an electric railway power feeding system is the power consumed or produced by a train.Because the amount and position of the load change rapidly over time,load flow analysis continues over time.Therefore,based on the method of obtaining solutions by constructing node equations for load flow analysis in this study,load flow analysis was performed through algorithms with energy-saving systems applied.Both thetrain performance simulation(TPS)and power simulation results show that the actual measurement data are estimated almost equally.展开更多
On January 11, 2010, the grand ceremony to present the 2009 National Scientific and Technological Award was held in Beijing. The project—Development and Implementation of Full-Digital Real-Time
文摘The access to electricity in rural areas is extremely limited, but it is crucial for all citizens. The population in rural areas of sub-Saharan African (SSA) countries is generally low, making it economically unfeasible to implement traditional rural electrification (CRE) projects due to the high cost of establishing the necessary distribution infrastructure. To address this cost issue, one alternative technology for rural electrification (URE) that can be explored is the Capacitor Coupled Substation (CCS) technology. CCS is a cost-effective solution for supplying electricity to rural areas. The research is necessitated by the need to offer a cost-effective technology for supplying electricity to sparsely populated communities. This paper examines the impact on the transmission network when a 400 kV/400V CCS is connected to it. The system response when a CCS is connected to the network was modeled using MATLAB/Si-mulink. The results, based on the fixed load of 80 kW, showed negligible interference on the transmission line voltage. However, there was minor impact on the parameters downstream of the tapping point. These findings were further supported by introducing a fault condition to the CCS, which showed that interferences with the CCS could affect the overall stability of the transmission network downstream of the tapping node, similar to the behavior of an unstable load.
文摘The Power System Simulation Lab constructed specifically for the Three Gorges AC/DC hybrid transmissionstudy is equipped mainly with a real-time power system simulator, which can jointly operate with existing TNA andHVDC Simulator respectively. Appraised by the State Power Corporation 3 years ago, this Lab was proved reachinginternational advanced level. Several large-scaled power system studies, such as the "Simplified Three Gorges PowerSystem Study" have achieved good results.[
基金Supported by the National Natural Science Foundation of China (50905016)
文摘A flexible flat torque converter was proposed to fulfill the requirement of miniaturization and power density maximization for automobiles.Constructed by two arcs joined by lines,the torus was designed directly from design path.The influence of flatness on the performance of the torque converter was evaluated.The software CFX and standard k-ε model were adopted to simulate the internal flow fields of the torque converter under different flatness ratios.The results indicated that the performance of the torque converter got worse as the flatness declined,but the capacity of pump increased.The efficiency and the torque ratio dropped slightly as the flatness ratio decreased.So the torque converter could be squashed appropriately to get high power density without too much efficiency sacrifice.But when the flatness ratio was below 0.2,there was a significant drop in the efficiency.
基金financially supported by the National 863 Plan(2010AA03A405and 2012AA062303)+4 种基金the National 973 Plan(2012CBA01205)the National Natural Science Foundation of China(U120227451204040)the National Science and Technology Support Program(2012BAE01B02)the Fundamental Research Funds for the Central Universities(N130702001 and N130607001)
文摘Numerical simulation of enhanced fluid flow characteristics in a three-stage double-stirring extraction tank was conducted with the coupling of an Eulerian multiphase flow model and a Morsi-Alexander interphase drag force model. Results show that the addition of a stirring device into the settler can efficiently reduce the volume fraction of out-of-phase impurity in the outlet, and accelerate the settling separation of oil-water mixture. Such addition can also effectively break down the oil-water-wrapped liquid droplets coming from the mixer, inhibit reflux from the outlet, and improve the oil-water separation. The addition of a stirring device induces ignorable power consumption compared with that by the mixer, and can thus facilitate the commercialized promotion of this novel equipment.
文摘The superconducting tokamak HT-7U [1] has been designed by the Institute of Plasma Physics since 1998 and will be set up before 2003. The 1.2 MW /2.45 GHz HT-7U LHCD (Lower hybrid current drive) system which being the most efficient non-induction device can heat the plasma and drive the plasma current has been efficiently in operation 'owl and a particular design of the 2.8 MW/-35 kV high-voltage DC power supply has been already completed and will apply to the klystron of LHCD on HT-7 and the future HT-7U, and the project of the power supply has been examined and approved professionally by an authorized group of high-level specialist in the institute of Plasma Physics. The detailed design of the power supply and the simulation results are referred in the paper.
基金supported by the General Program of Chinese Postdoctoral Science Foundation under Grant No.2012M511595
文摘In order to effectively imitate the dynamic operation characteristics of the HVDC (high voltage direct current) power transmission system at a real ±500kV HVDC transmission project, the electromechanical-electromagnetic transient hybrid simulation was carried out based on advanced digital power system simulator (ADPSS). In the simulation analysis, the built hybrid model's dynamic response outputs under three different fault conditions are considered, and by comparing with the selected fault recording waveforms, the validities of the simulation waveforms are estimated qualitatively. It can be ascertained that the hybrid simulation model has the ability to describe the HVDC system's dynamic change trends well under some special fault conditions.
文摘The exclusive use of renewable energies is today an essential nautical concern. Nowadays, the onboard energy generation comes mainly from diesel oil, which is in user mind the simplest way. Our objective is to develop a self-adaptive management system of the onboard energy in order to change the user mind. We introduce models for energy production, storage and consumption that fit with the yachting environment, which is mobile and not as predictable as the home automation case. These models are combined within a configurable simulator. This simulator can handle user's boat equipment, reproduce sailing conditions and so help to validate the models and to study different management strategies. This first step is necessary to develop a smart system able to manage sailing energy in order to answer the main issue: assuring safety and optimizing comfort according to user demands.
文摘This paper presents the concept of a Dielectric-lined Multiwave Cerenkov Generator producing high power millimeter waves, which has been investigated with a two and onehalf dimensional electromagnetic relativistic Particle-in-Cell (PIC) plasma simulation code. Themodified device can operate in a lower diode-voltage regime with much higher radiation efficiencyand slight downshift of operation frequency. There exist the optima for the permittivity of thedielectric liner and for the magnitude of the guiding magnetic field. The required intensity of theguiding field is reduced by the introduction of the liner. The enhanced propagation of the electronbeam is studied in the presence of the liner.
文摘This paper develops a high time-resolution optimal power generation mix model in its time resolution of 10 minutes on 365 days by linear programming technique. The model allows us to analyse the massive deployment of photovoltaic system and wind power generation in power system explicitly considering those short-term output variation. PV (photovoltaic) and wind output are estimated, employing meteorological database. Simulation results reveal that variable fluctuation derived from a high penetration level of those renewables is controlled by quick load following operation of natural gas combined cycle power plant, pumped-storage hydro power, stationary NAS (sodium and sulfur) battery and the output suppression control of PV and wind. It additionally turns out that the operational configuration of those technologies for the renewable variability differs significantly depending on those renewable output variations in each season and solving the seasonal electricity imbalance as well as the daily imbalance is important if variable renewables are massively deployed.
文摘The adaptive simulation algorithm (ASA) based on stiffness recognition is an effective and applicable simulation method. In this paper, a principle of the said method is briefly introduced and more importance is stressed in studying the value of its application by realizing it in MMS.
文摘The present paper deals with the development of a modular, flexible and structured block to block approach for the study of regulators by implementing the different blocks on a DSP (digital signal processor). The proposed low-cost approach has been applied and validated by the implementation of an industrial regulator in a real time hardware-in-the-loop simulation of a mixed islanded power network including precise models of the hydraulic system. The studied network is constituted of three different types of electrical power generation systems and a consumer.
文摘电力系统具有良好的稳定性是保证电网正常运行的关键,充分应用Power World Simulator电力系统仿真软件对我国西北某地区实际电网进行安全稳定性分析。根据给定的实际电网运行数据搭建电网模型并进行潮流计算,将潮流计算结果与静态安全理论相结合,对该地区电网模型进行N-1静态安全性分析。针对线路负载率过高以及节点母线电压越限的情况,提出解决措施以达到提高电网运行稳定性的目的。
基金Project(HEUCF110707)supported by the Fundamental Research Funds for the Central Universities,ChinaProject(E201216)supported by Heilongjiang Natural Science Fund,China
文摘Wind energy is one of the most promising renewable energy sources, straight-bladed vertical axis wind turbine(S-VAWT) appears to be particularly promising for the shortage of fossil fuel reserves owing to its distinct advantages, but suffers from poor self-starting and low power coefficient. Variable-pitch method was recognized as an attractive solution to performance improvement, thus majority efforts had been devoted into blade pitch angle effect on aerodynamic performance. Taken into account the local flow field of S-VAWT, mathematical model was built to analyze the relationship between power outputs and pitch angle. Numerical simulations on static and dynamic performances of blade were carried out and optimized pitch angle along the rotor were presented. Comparative analyses of fixed pitch and variable-pitch S-VAWT were conducted, and a considerable improvement of the performance was obtained by the optimized blade pitch angle, in particular, a relative increase of the power coefficient by more than 19.3%. It is further demonstrated that the self-starting is greatly improved with the optimized blade pitch angle.
基金supported by the National Natural Science Foundation of China(6147219261202004)+1 种基金the Special Fund for Fast Sharing of Science Paper in Net Era by CSTD(2013116)the Natural Science Fund of Higher Education of Jiangsu Province(14KJB520014)
文摘In order to lower the power consumption and improve the coefficient of resource utilization of current cloud computing systems, this paper proposes two resource pre-allocation algorithms based on the "shut down the redundant, turn on the demanded" strategy here. Firstly, a green cloud computing model is presented, abstracting the task scheduling problem to the virtual machine deployment issue with the virtualization technology. Secondly, the future workloads of system need to be predicted: a cubic exponential smoothing algorithm based on the conservative control(CESCC) strategy is proposed, combining with the current state and resource distribution of system, in order to calculate the demand of resources for the next period of task requests. Then, a multi-objective constrained optimization model of power consumption and a low-energy resource allocation algorithm based on probabilistic matching(RA-PM) are proposed. In order to reduce the power consumption further, the resource allocation algorithm based on the improved simulated annealing(RA-ISA) is designed with the improved simulated annealing algorithm. Experimental results show that the prediction and conservative control strategy make resource pre-allocation catch up with demands, and improve the efficiency of real-time response and the stability of the system. Both RA-PM and RA-ISA can activate fewer hosts, achieve better load balance among the set of high applicable hosts, maximize the utilization of resources, and greatly reduce the power consumption of cloud computing systems.
基金Supported by the Shanghai Institute of Technology(10120K146098)Shanghai Municipal Education Commission(1021ZK151009017)
文摘This paper is concerned with the design and application of coaxial mixers with the aid of analysis of interaction between each individual impeller. Two types of coaxial mixers pitched blade turbine(PBT)-helical ribbon(HR)and inner-outer HR operated in laminar regime were studied experimentally and numerically. The interaction implies synergistic and interference effects, which was revealed through the investigation of axial circulation rate, energy dissipation rate and power consumption. The influence factors including rotational speed ratio,rotating mode and impeller configuration were explored systematically. Quantitative analysis of power consumption involves three parameters: rate of variation in power consumption, interactive mode and ratio of power consumption. Analysis indicated that some important properties were embodied in the power curve.These properties are one-way and two-way interactions, critical speed ratio and dominant impeller. Finally, a new suggestion for power estimation was given.
基金Sponsored by the National Defence Research Foundation of China(Grant No.413460303).
文摘Network processors are used in the core node of network to flexibly process packet streams. With the increase of performance, the power of network processor increases fast, and power and cooling become a bottleneck. Architecture-level power conscious design must go beyond low-level circuit design. Architectural power and performance tradeoff should be considered at the same time. Simulation is an efficient method to design modem network processor before making chip. In order to achieve the tradeoff between performance and power, the processor simulator is used to design the architecture of network processor. Using Netbeneh, Commubench benchmark and processor simulator-SimpleScalar, the performance and power of network processor are quantitatively evaluated. New performance tradeoff evaluation metric is proposed to analyze the architecture of network processor. Based on the high performance lnteI IXP 2800 Network processor eonfignration, optimized instruction fetch width and speed ,instruction issue width, instruction window size are analyzed and selected. Simulation resuits show that the tradeoff design method makes the usage of network processor more effectively. The optimal key parameters of network processor are important in architecture-level design. It is meaningful for the next generation network processor design.
基金funded by the China Energy Investment Cor-poration under the program“Simulation of energy storage application scenarios in China and research on development strategy of China En-ergy Investment Corporation”(Grant No.:GJNY-21-143).
文摘This study designs and proposes a method for evaluating the configuration of energy storage for integrated re-newable generation plants in the power spot market,which adopts a two-level optimization model of“system simulation+plant optimization”.The first step is“system simulation”which is using the power market simu-lation model to obtain the initial nodal marginal price and curtailment of the integrated renewable generation plant.The second step is“plant optimization”which is using the operation optimization model of the integrated renewable generation plant to optimize the charge-discharge operation of energy storage.In the third step,“sys-tem simulation”is conducted again,and the combined power of renewable and energy storage inside the plant is brought into the system model and simulated again for 8,760 h of power market year-round to quantify and compare the power generation and revenue of the integrated renewable generation plant after applying energy storage.In the case analysis of the provincial power spot market,an empirical analysis of a 1 GW wind-solar-storage integrated generation plant was conducted.The results show that the economic benefit of energy storage is approximately proportional to its capacity and that there is a slowdown in the growth of economic benefits when the capacity is too large.In the case that the investment benefit of energy storage only considers the in-come of electric energy-related incomes and does not consider the income of capacity mechanism and auxiliary services,the income of energy storage cannot fulfill the economic requirements of energy storage investment.
文摘This paper describes a stabilization effect after installating an adjustable speed generator (ASG) in a multi machine power system. A personal computer based ASG module has been de veloped for the simulations in parallel with the analog power system simulator i n the Research Laboratory of the Kyushu Electric Power Co. The three phase ins t antaneous value based ASG model has been developed in the Matlab/Simulink envir onment for its detailed and real time simulations, which have been performed on a digital signal processor (DSP) board with AD and DA conversion interfaces inst alled in a personal computer (PC). Simulational results indicate the hig hly improved overall stability of the multi machine power system after installa ting the ASG.
基金This study was conducted by the Ministry of Land,Infrastructure and Transport’s Research Project on Railway Technology-Projects(21RTRP-B146034-04).
文摘Urban railway systems differ greatly from general power systems in that they use direct current(DC)power supply and that the location and power requirements of the loads change.The position and power consumption of the load shall be interpreted continuously every second,or in a fixed unit of time,for a specific period of time during which the operating conditions are repeated.The additional analysis of energy-saving systems being considered as energy efficiency improvement methods requires more complex load flow analysis algorithms.Simulations are performed load flow every time step.The power of an electric railway power feeding system is the power consumed or produced by a train.Because the amount and position of the load change rapidly over time,load flow analysis continues over time.Therefore,based on the method of obtaining solutions by constructing node equations for load flow analysis in this study,load flow analysis was performed through algorithms with energy-saving systems applied.Both thetrain performance simulation(TPS)and power simulation results show that the actual measurement data are estimated almost equally.
文摘On January 11, 2010, the grand ceremony to present the 2009 National Scientific and Technological Award was held in Beijing. The project—Development and Implementation of Full-Digital Real-Time