期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
机器发生故障时单机E/T随机调度问题 被引量:2
1
作者 王黎明 《泰山学院学报》 2004年第3期1-5,共5页
 研究在Preemptive-repeat模型下,假设工件的加工时间服从指数分布,计数过程服从Poisson过程,单机E/T随机调度问题.我们得到最优调度依相应的权值与加工时间均值的比具有V形特性.
关键词 工件加工 机器故障 单机 E/T随机调度 preemptive-repeat模型
下载PDF
Single machine stochastic JIT scheduling problem subject to machine breakdowns 被引量:2
2
作者 TANG HengYong ZHAO ChuanLi CHENG CongDian 《Science China Mathematics》 SCIE 2008年第2期273-292,共20页
In this paper we research the single machine stochastic JIT scheduling problem subject to the machine breakdowns for preemptive-resume and preemptive-repeat.The objective function of the problem is the sum of squared ... In this paper we research the single machine stochastic JIT scheduling problem subject to the machine breakdowns for preemptive-resume and preemptive-repeat.The objective function of the problem is the sum of squared deviations of the job-expected completion times from the due date.For preemptive-resume,we show that the optimal sequence of the SSDE problem is V-shaped with respect to expected processing times.And a dynamic programming algorithm with the pseudopolynomial time complexity is given.We discuss the difference between the SSDE problem and the ESSD problem and show that the optimal solution of the SSDE problem is a good approximate optimal solution of the ESSD problem,and the optimal solution of the SSDE problem is an optimal solution of the ESSD problem under some conditions.For preemptive-repeat,the stochastic JIT scheduling problem has not been solved since the variances of the completion times cannot be computed.We replace the ESSD problem by the SSDE problem.We show that the optimal sequence of the SSDE problem is V-shaped with respect to the expected occupying times.And a dynamic programming algorithm with the pseudopolynomial time complexity is given.A new thought is advanced for the research of the preemptive-repeat stochastic JIT scheduling problem. 展开更多
关键词 stochastic JIT scheduling machine breakdowns preemptive-resume preemptive-repeat sum of squared deviations of the expected completion times from the due date 90B36 68M20
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部