The article takes a simply supported prestressed concrete small box girder bridge project as an example for inspection and evaluation after a fire incident.This includes appearance detection,concrete color hardness de...The article takes a simply supported prestressed concrete small box girder bridge project as an example for inspection and evaluation after a fire incident.This includes appearance detection,concrete color hardness detection,concrete strength detection,concrete surface damage layer detection,reinforcement protective layer detection,and concrete carbonation detection.It is hoped that this analysis can be used as a reference for the detection and evaluation of future bridge projects with fire incidents to smoothen its subsequent repair and maintenance.展开更多
The aerodynamic performance of high-speed trains passing each other was investigated on a simply supported box girder bridge,with a span of 32 m,under crosswinds.The bridge and train models,modeled at a geometric scal...The aerodynamic performance of high-speed trains passing each other was investigated on a simply supported box girder bridge,with a span of 32 m,under crosswinds.The bridge and train models,modeled at a geometric scale ratio of 1:30,were used to test the aerodynamic forces of the train,with the help of a designed moving test rig in the XNJD-3 wind tunnel.The effects of wind speed,train speed,and yaw angle on the aerodynamic coefficients of the train were analyzed.The static and moving model tests were compared to demonstrate how the movement of the train influences its aerodynamic characteristics.The results show that the sheltering effect introduced by trains passing each other can cause a sudden change in force on the leeward train,which is further influenced by the wind and running speeds.Detailed analyses related to the effect of wind and train speeds on the aerodynamic coefficients were conducted.The relationship between the change in aerodynamic coefficients and yaw angle was finally described by a series of proposed fitting formulas.展开更多
The present practice in Bangladesh for erection of girders is placing the girder directly on the bearing pad and joining the adjacent two spans in deck slab level by adopting expansion joints, as the bridges are prese...The present practice in Bangladesh for erection of girders is placing the girder directly on the bearing pad and joining the adjacent two spans in deck slab level by adopting expansion joints, as the bridges are presently designed as simply-supported beam bridge. The main disadvantage of this type of bridges is that, the seismic resistance is weak, and under the external force beyond the design range, the bridges are more likely to fall in danger because of failure in girders. Also they have expansion joints for each span, which affects the comfort of driving and the overall integrity of the bridge deck is poor [1]. Therefore, design and construction of the bridges have been revised to establish continuity between girders of two adjacent spans and transform the bridge as simply supported continuous beam bridge [2]. Temporary bearing (sandbox) method is proposed in this paper to solve the system transformation of continuous beam bridges. Design of the temporary bearing is very simple and can be manufactured at site. This method has been proved in construction of Arial Kha Bridge and can be applied for other similar bridges in Bangladesh.展开更多
文摘The article takes a simply supported prestressed concrete small box girder bridge project as an example for inspection and evaluation after a fire incident.This includes appearance detection,concrete color hardness detection,concrete strength detection,concrete surface damage layer detection,reinforcement protective layer detection,and concrete carbonation detection.It is hoped that this analysis can be used as a reference for the detection and evaluation of future bridge projects with fire incidents to smoothen its subsequent repair and maintenance.
基金This work was financially supported by the National Natural Science Foundation of China (U1434205, 51708645).
文摘The aerodynamic performance of high-speed trains passing each other was investigated on a simply supported box girder bridge,with a span of 32 m,under crosswinds.The bridge and train models,modeled at a geometric scale ratio of 1:30,were used to test the aerodynamic forces of the train,with the help of a designed moving test rig in the XNJD-3 wind tunnel.The effects of wind speed,train speed,and yaw angle on the aerodynamic coefficients of the train were analyzed.The static and moving model tests were compared to demonstrate how the movement of the train influences its aerodynamic characteristics.The results show that the sheltering effect introduced by trains passing each other can cause a sudden change in force on the leeward train,which is further influenced by the wind and running speeds.Detailed analyses related to the effect of wind and train speeds on the aerodynamic coefficients were conducted.The relationship between the change in aerodynamic coefficients and yaw angle was finally described by a series of proposed fitting formulas.
文摘The present practice in Bangladesh for erection of girders is placing the girder directly on the bearing pad and joining the adjacent two spans in deck slab level by adopting expansion joints, as the bridges are presently designed as simply-supported beam bridge. The main disadvantage of this type of bridges is that, the seismic resistance is weak, and under the external force beyond the design range, the bridges are more likely to fall in danger because of failure in girders. Also they have expansion joints for each span, which affects the comfort of driving and the overall integrity of the bridge deck is poor [1]. Therefore, design and construction of the bridges have been revised to establish continuity between girders of two adjacent spans and transform the bridge as simply supported continuous beam bridge [2]. Temporary bearing (sandbox) method is proposed in this paper to solve the system transformation of continuous beam bridges. Design of the temporary bearing is very simple and can be manufactured at site. This method has been proved in construction of Arial Kha Bridge and can be applied for other similar bridges in Bangladesh.