期刊文献+
共找到1,605篇文章
< 1 2 81 >
每页显示 20 50 100
Dynamic finite element model updating of prestressed concrete continuous box-girder bridge 被引量:6
1
作者 Lin Xiankun Zhang Lingmi +1 位作者 Guo Qintao Zhang Yufeng 《Earthquake Engineering and Engineering Vibration》 SCIE EI CSCD 2009年第3期399-407,共9页
The dynamic finite element model (FEM) of a prestressed concrete continuous box-girder bridge, called the Tongyang Canal Bridge, is built and updated based on the results of ambient vibration testing (AVT) using a... The dynamic finite element model (FEM) of a prestressed concrete continuous box-girder bridge, called the Tongyang Canal Bridge, is built and updated based on the results of ambient vibration testing (AVT) using a real-coded accelerating genetic algorithm (RAGA). The objective functions are defined based on natural frequency and modal assurance criterion (MAC) metrics to evaluate the updated FEM. Two objective functions are defined to fully account for the relative errors and standard deviations of the natural frequencies and MAC between the AVT results and the updated FEM predictions. The dynamically updated FEM of the bridge can better represent its structural dynamics and serve as a baseline in long-term health monitoring, condition assessment and damage identification over the service life of the bridge . 展开更多
关键词 prestressed concrete continuous box-girder bridge field ambient vibration testing dynamic characteristics model updating accelerating genetic algorithm objective function
下载PDF
Seismic Analysis for Rigid-Framed Prestressed Reinforced Concrete Bridge in Tianjin Light Railway
2
作者 丁阳 李楠 李忠献 《Transactions of Tianjin University》 EI CAS 2004年第4期265-269,共5页
The seismic analysis of a rigid-framed prestressed concrete bridge in Tianjin Light Railway is performed. A 3-D dynamic finite element model of the bridge is established considering the weakening effect caused by the ... The seismic analysis of a rigid-framed prestressed concrete bridge in Tianjin Light Railway is performed. A 3-D dynamic finite element model of the bridge is established considering the weakening effect caused by the soft soil foundation. After the dynamic characteristics are calculated in terms of natural frequencies and modes, the seismic analysis is carried out using the modal response spectrum method and the time-history method, respectively. Based on the calculated results, the reasonable design values are finally suggested as the basis of the seismic design of the bridge, and meanwhile the problems encountered were also analyzed. Finally, some conclusions are drawn as: 1) Despite the superiority of rigid-framed prestressed concrete bridge, the upper and lower ends of the piers of the bridge are proved to be the crucial parts of the bridge, which are easily destroyed under designed earthquake excitations and should be carefully analyzed and designed; 2) The soft soil foundation can possibly result in rather weakening of the lateral rigidity of the rigid-framed bridge, and should be paid considerable attention; 3) The modal response spectrum method, combined with time-history method, is suggested for the seismic analysis in engineering design of the rigid-framed prestressed concrete bridge. 展开更多
关键词 light railway rigid-framed bridge prestressed reinforced concrete seismic analysis dynamic characteristics response spectrum TIME-HISTORY
下载PDF
Degradation process assessment of prestressed concrete continuous bridges in life-cycle
3
作者 田浩 李国平 陈艾荣 《Journal of Central South University》 SCIE EI CAS 2012年第5期1411-1418,共8页
To accurately evaluate the degradation process of prestressed concrete continuous bridges exposed to aggressive environments in life-cycle,a finite element-based approach with respect to the lifetime performance asses... To accurately evaluate the degradation process of prestressed concrete continuous bridges exposed to aggressive environments in life-cycle,a finite element-based approach with respect to the lifetime performance assessment of concrete bridges was proposed.The existing assessment methods were firstly introduced and compared.Some essential mechanics problems involved in the degradation process,such as the deterioration of materials properties,the reduction of sectional areas and the variation of overall structural performance caused by the first two problems,were investigated and solved.A computer program named CBDAS(Concrete Bridge Durability Analysis System) was written to perform the above-metioned approach.Finally,the degradation process of a prestressed concrete continuous bridge under chloride penetration was discussed.The results show that the concrete normal stress for serviceability limit state exceeds the threshold value after 60 a,but the various performance indicators at ultimate limit state are consistently in the allowable level during service life.Therefore,in the case of prestressed concrete bridges,the serviceability limit state is more possible to have durability problems in life-cycle;however,the performance indicators at ultimate limit state can satisfy the requirements. 展开更多
关键词 prestressed concrete continuous bridges LIFE-CYCLE degradation process finite element chloride penetration serviceability limit state ultimate limit state
下载PDF
Evaluation method research on prestressed concrete bridges
4
作者 黄侨 林阳子 任远 《Journal of Harbin Institute of Technology(New Series)》 EI CAS 2008年第2期155-159,共5页
Considering the construction features of prestressed concrete bridge, the comprehensive evaluation method about the bridge damage conditions are studied. Particular attentions are paid on establishing a muhilevel eval... Considering the construction features of prestressed concrete bridge, the comprehensive evaluation method about the bridge damage conditions are studied. Particular attentions are paid on establishing a muhilevel evaluation model for damaged prestressed concrete bridge, and the evaluation indices of the model as well as the rating standards are defined in the model. A normal relative function about the evaluation indices of each element is developed to calculate the relative degree, and for each element which is no sub-level elements. When evaluating the elements in sub-item level or index level of the model, the weights of elements that are pertained to one element are adopted, taking account of their deterioration degree. At the same time, the dam- age conditions of bridge are characterized by relative degree, element evaluation scale and structural technology mark of bridge, so it agrees with Code for Maintenance of Highway Bridges and Culvers. 展开更多
关键词 prestressed concrete bridge EVALUATION AHP analytic hierarchy process relational degree weight modify
下载PDF
Lifetime Reliability Analysis of Flexural Cracking for Prestressed Concrete Bridge
5
作者 童育强 向天宇 +2 位作者 杜斌 袁新朋 赵人达 《Journal of Southwest Jiaotong University(English Edition)》 2009年第3期207-211,共5页
Time-dependant reliability is analyzed for the flexural cracking of prestressed concrete bridges under service limit state. The limit state function and random variables are derived from Chinese highway bridge design ... Time-dependant reliability is analyzed for the flexural cracking of prestressed concrete bridges under service limit state. The limit state function and random variables are derived from Chinese highway bridge design specifications. For deterioration of structural performances, chloride-induced reinforcement corrosion is emphasized. Through integrating first order reliability method (FORM) and time discretized approach, the time-variant reliability is evaluated. For illustrative propose, the reliability of a typical simply supported prestressed concrete beam is exemplified. 展开更多
关键词 prestressed concrete bridge RELIABILITY Service limit state Flexural cracking
下载PDF
Bridge Falsework in Staged Construction of a Prestressed Concrete Beam Bridge
6
作者 Janusz Hotowaty Dariusz Jurkowski 《Journal of Civil Engineering and Architecture》 2015年第12期1432-1438,共7页
The formwork and falsework in the construction of twin ribbed slab decks on a multi-span ecological bridge for a dual carriageway are presented. The bridge is situated in a valley plain which is crossed by small river... The formwork and falsework in the construction of twin ribbed slab decks on a multi-span ecological bridge for a dual carriageway are presented. The bridge is situated in a valley plain which is crossed by small rivers and was designed principally with the environment in mind. The bridge length is over 356 m, and the width of the decks is 11.5 m. For the bridge works, a simple conventional falsework system was chosen with steel frames for the supports and steel rolled beams for the decks. The formwork was constructed in solid timber and plywood as multiple-use panels. The falsework was designed in order to build the two 10-span bridge decks in stages. The decks are continuous cast-in-situ prestressed concrete twin rib with spans of 30 m, 34 m and 45 m. An individual falsework system was designed, which was easy to move transversally following completion of each stage for one deck. After finishing each stage, for the second deck, the falsework was dismantled and used again in the next construction fronts. An individual arrangement for the falsework along with timber pilings was used to cross the biggest river. The formwork timber panels were used several times in the multistage bridge construction. The adopted falsework system is very simple, but it allowed the speedy construction of the two decks where there were severe time constraints. 展开更多
关键词 prestress concrete bridge continuous bridge twin rib deck span-by-span construction FORMWORK falsework.
下载PDF
Weakening effect of vertical prestress ducts on web sections in prestressed concrete box girder bridges
7
作者 Shen Mingyan Zhong Xingu Yin Xuwen Shu Xiaojuan 《Engineering Sciences》 EI 2010年第2期73-79,共7页
Based on experimental study result of two simply supported beams,which were prestressed by vertical tendons,the research on the weakening effect of vertical prestress ducts on web sections of prestressed concrete box ... Based on experimental study result of two simply supported beams,which were prestressed by vertical tendons,the research on the weakening effect of vertical prestress ducts on web sections of prestressed concrete box girder was carried out. The test result shows that in the condition without grouting into the ducts,the cracking load is evidently lower than that with full grouting,and stirrup stress and principal tension stress at the surface of concrete will increase obviously. Meanwhile,the finite element analysis has been done to the test beams. The research is consistent with the analysis of finite element. The research tells that strengthening the detection and management for the vertical prestress grouting quality have an important meaning to prevent cracking of the prestressed concrete box girder bridge and provide one theoretical and testing basis for analyzing the cracking reason of such bridges. 展开更多
关键词 concrete box girder bridge vertical prestress duct weakening of web section experimental study finite element analysis
下载PDF
Unified analogue method of effective prestress for post-prestressed tendon 被引量:2
8
作者 郭琦 张岗 贺拴海 《Journal of Pharmaceutical Analysis》 SCIE CAS 2008年第3期187-192,共6页
In order to obtain the present effective prestress and its longitudinal distribution of prestressed tendon during the process of inspection and evaluation, a unified analogue method was put forward. Based on the theor... In order to obtain the present effective prestress and its longitudinal distribution of prestressed tendon during the process of inspection and evaluation, a unified analogue method was put forward. Based on the theory for calculating instantaneous prestress loss of the tendons with complicated geometry, a universal numerical model was established. Therefore, the distribution of effective prestress could be simulated after recognizing the nominal coefficients of prestress loss with the obtained stress data of objective steel tendon. The numerical simulation results of a full-length tendon of a three-span continuous beam bridge show that the relative errors between the calculated value and the value in the code are within 5%, which meets the requirement for engineering application. 展开更多
关键词 bridge engineering prestressed concrete effective prestress virtual frictional loss
下载PDF
PSC Bridge Subjected to Combined Post Tension and Post Compression—A Case Study
9
作者 Sujith Shetty Sundar Suraj Sathyanrayana Rao 《World Journal of Engineering and Technology》 2018年第4期767-779,共13页
Starting from the ideas of Conventional Post Tensioning we present a heuristic argument of advantages of combined actions of post compression along with post tensioned technique for a PSC member through a Design Examp... Starting from the ideas of Conventional Post Tensioning we present a heuristic argument of advantages of combined actions of post compression along with post tensioned technique for a PSC member through a Design Example. Our aim was to assess the characterization of a pre stressed member if it was?to be under the Load effects of post compressing a bar with post tensioned method through hydraulic jacks as the reinforcements in the tensioned zone of conventional PSC bridge were to be compressed in order to induce internal tensile stress similar to internal compressive stresses developed due to conventional post tensioned design. The results ultimately concluded that post compressing a Slender bar by a pre stressing force in the compression zone by a value equal to 0.1?-?0.7 times the pre stressing force in the tension zone would eventually lead to cancelling out of tensile and compressive stresses, thereby forming the desired section which is comparatively smaller in size but can account for sustainability. The anchorage at the top end was?provided by special slender steel rods to eliminate the compressive stresses. All the dead loads?were?counteracted by the action of prestress and the bridge section was able to carry only live load which is deduced through examples in the article. 展开更多
关键词 COMBINED POST Tension and POST Compression prestress concrete Design of bridgeS
下载PDF
简支变结构连续小箱梁桥负弯矩区UHPC-NC组合桥面板抗裂性研究 被引量:1
10
作者 李俊 《铁道标准设计》 北大核心 2024年第5期75-81,96,共8页
针对当前简支变结构连续小箱梁桥负弯矩区钢束易堵孔、运营中桥面开裂病害等问题,提出一种无负弯矩钢束的UHPC-NC组合桥面板结构。以一座3×30 m简支变结构连续小箱梁桥为研究对象,以正常使用极限状态梁体不开裂为控制准则确定UHPC... 针对当前简支变结构连续小箱梁桥负弯矩区钢束易堵孔、运营中桥面开裂病害等问题,提出一种无负弯矩钢束的UHPC-NC组合桥面板结构。以一座3×30 m简支变结构连续小箱梁桥为研究对象,以正常使用极限状态梁体不开裂为控制准则确定UHPC合理构造尺寸,对所提出的负弯矩组合桥面板结构进行1∶2的缩尺模型试验。试验显示:裂缝首先出现于UHPC-NC交界面处的普通混凝土部分,随后逐渐向UHPC层沿伸,且C50混凝土开裂、梁体破坏对应的截面弯矩分别为3 520,9 152 kN·m(考虑1∶8弯矩缩尺比),大于正常使用极限状态、承载能力极限状态梁体截面弯矩3 300,5 838 kN·m,即该组合桥面板结构满足小箱梁的抗裂与承载能力要求。基于试验结果建立精细化有限元模型,采用参数分析法研究UHPC厚度对梁体开裂荷载、极限承载力等方面的影响。结果表明:梁体开裂弯矩主要由UHPC上覆层厚度决定,相较于普通钢筋混凝土梁,5 cm厚的UHPC上覆层可将梁体开裂弯矩提高28.9%,7.5 cm厚的UHPC上覆层可将梁体开裂弯矩提高41.6%;在配筋率不变的情况下,增大UHPC层厚度对梁体承载力无显著提升。综合考虑梁体受力性能以及施工便利性,建议背景工程UHPC厚度取10 cm。 展开更多
关键词 预应力混凝土桥 箱梁桥 模型试验 负弯矩区 超高性能混凝土 抗裂构造 数值模拟
下载PDF
PPC斜拉桥主梁多状态疲劳及疲劳后静力性能试验研究
11
作者 袁晟 颜东煌 +3 位作者 刘昀 彭坤帅 郭鑫 袁明 《土木工程学报》 EI CSCD 北大核心 2024年第6期169-179,189,共12页
为研究大跨径部分预应力混凝土(PPC)斜拉桥主梁的抗疲劳性能,进一步探究混凝土斜拉桥主梁采用部分预应力设计的可行性及合理性,制作了斜拉桥缩尺节段模型,并对主梁采用部分预应力设计,开展4轮共4×250万次主梁具有不同初始损伤及带... 为研究大跨径部分预应力混凝土(PPC)斜拉桥主梁的抗疲劳性能,进一步探究混凝土斜拉桥主梁采用部分预应力设计的可行性及合理性,制作了斜拉桥缩尺节段模型,并对主梁采用部分预应力设计,开展4轮共4×250万次主梁具有不同初始损伤及带裂缝工作状态下的疲劳试验;疲劳试验结束后,以4种不同主梁裂缝宽度(0.1mm、0.2mm、0.3mm和0.5mm)为控制工序,反复加载一定倍数的等效活载至主梁裂缝宽度逐步达到0.5mm,以全面研究PPC斜拉桥主梁多状态疲劳后的受力性能。试验结果表明:在等效设计疲劳荷载作用下,主梁无初始损伤时,体系刚度基本无退化,主梁最大裂缝宽度预损伤分别为0.1mm、0.2mm时,跨中截面体系刚度下降量仅为3.35%、4.44%,且未发现裂缝张开;主梁带裂缝工作状态下,跨中截面体系刚度平缓下降7.46%,上峰值静载下,裂缝数量及高度略有增加,但卸载后裂缝均闭合,说明PPC斜拉桥具有良好的抗疲劳性能;疲劳后主梁大损伤静载试验中,主梁裂缝平稳发展,各工序反复加载过程中,主梁挠度、裂缝状态及斜拉索索力均具有较好的恢复能力,当主梁最大裂缝宽度为0.5mm时,荷载达到了7.49倍活载,斜拉桥体系仍然具有较大的剩余承载力。该文试验研究结果表明混凝土斜拉桥主梁采用部分预应力设计具有工程应用的可行性。 展开更多
关键词 混凝土斜拉桥 部分预应力 疲劳性能 静力性能 模型试验
下载PDF
重载铁路桥梁体外预应力筋加固性能研究
12
作者 宋力 陈岩 +2 位作者 刘冉 蒋丽忠 余志武 《中南大学学报(自然科学版)》 EI CAS CSCD 北大核心 2024年第9期3400-3415,共16页
运营提载会导致重载铁路桥梁损伤累积和刚度退化加剧,对重载铁路预应力混凝土桥梁进行加固可以改善桥梁的受力状况,提高桥梁承载能力。为了研究重载铁路桥梁体外预应力筋加固的性能,分别制作重载铁路24 m超低高度预应力混凝土梁的未加... 运营提载会导致重载铁路桥梁损伤累积和刚度退化加剧,对重载铁路预应力混凝土桥梁进行加固可以改善桥梁的受力状况,提高桥梁承载能力。为了研究重载铁路桥梁体外预应力筋加固的性能,分别制作重载铁路24 m超低高度预应力混凝土梁的未加固足尺试验模型与体外预应力筋加固足尺试验模型,并开展200万次疲劳试验与疲劳后静力试验。建立未加固预应力混凝土梁与体外预应力筋加固预应力混凝土梁的精细化有限元模型,通过试验与有限元分析,研究加固前后重载铁路预应力混凝土梁的静力与疲劳性能,揭示加固前后梁体挠度和应力变化规律,并分析不同轴重列车作用下加固预应力混凝土梁的力学性能。研究结果表明:重载铁路桥梁外加预应力筋的加固效果良好,疲劳试验中加固梁刚度退化幅度、跨中挠度、梁内预应力筋应力、梁底及下翼缘混凝土应力显著比未加固梁的小;在33 t轴重列车与1.2倍中等荷载(ZH)轴重作用下,外加预应力筋加固的24 m超低高度预应力混凝土梁的适应性良好,预应力混凝土梁挠度与应力响应均符合规范要求。研究结果可为重载铁路桥梁的设计、养护、维护与加固提供基础与参考。 展开更多
关键词 重载铁路桥梁 加固技术 预应力混凝土梁 疲劳试验 有限元分析
下载PDF
斜拉桥非对称V形钢塔-混凝土基座结合部构造设计优化
13
作者 周朝阳 肖逸鹏 +1 位作者 何畅 王兴国 《河南理工大学学报(自然科学版)》 CAS 北大核心 2024年第4期177-185,共9页
某空间异型斜拉桥主塔钢柱与斜撑在底部形成非对称V形结构,钢构件轴线严重偏离下部混凝土基座顶面垂线,给结合部构造设计带来困难。目的 为了确定所采用构造方案中的众多参数,缓解塔柱到基座的刚度陡变,降低结合部各部件的应力最大值,方... 某空间异型斜拉桥主塔钢柱与斜撑在底部形成非对称V形结构,钢构件轴线严重偏离下部混凝土基座顶面垂线,给结合部构造设计带来困难。目的 为了确定所采用构造方案中的众多参数,缓解塔柱到基座的刚度陡变,降低结合部各部件的应力最大值,方法 基于精细化非线性有限元模拟,通过改变参数取值,对多种典型工况下各部件的应力进行分析、对比、验算,对于锚杆设置这一参数的影响,还研究了承压板与混凝土基座之间的界面应力。结果 研究结果表明:张拉1~4号索的施工极端工况和平面内外弯矩绝对值相加最大的使用工况最为关键,基座混凝土主拉应力常起控制作用,塔根应力比较接近规范限值;加厚承压板、适当提高混凝土强度有利于控制锚箱钢板和基座混凝土应力;原方案锚箱中部纵横向钢板作用很小;锚杆布置位置合理远比数量重要,弯矩作用下受拉侧施加预应力能够起到有益作用。结论 最终优化方案大量减少了锚箱钢板块数和锚杆根数,预应力分布也更合理。研究结果兼顾安全、适用和经济,对相关工程具有借鉴意义。 展开更多
关键词 斜拉桥 钢塔-混凝土 预应力 有限元模拟
下载PDF
体外预应力UHPC无腹筋梁抗剪性能试验研究
14
作者 李立峰 房宇超 +1 位作者 叶萌 金未萌 《铁道建筑》 北大核心 2024年第2期67-74,共8页
为研究体外预应力超高性能混凝土(Ultra-high Performance Concrete,UHPC)无腹筋梁的抗剪性能,设计了3片体外预应力UHPC无腹筋梁,剪跨比分别为1.44、2.56、3.67,采用四点加载的方式进行抗剪性能试验,获得了试验梁的荷载-位移关系、荷载... 为研究体外预应力超高性能混凝土(Ultra-high Performance Concrete,UHPC)无腹筋梁的抗剪性能,设计了3片体外预应力UHPC无腹筋梁,剪跨比分别为1.44、2.56、3.67,采用四点加载的方式进行抗剪性能试验,获得了试验梁的荷载-位移关系、荷载-应变关系、破坏形态以及极限抗剪承载力。试验结果表明:体外预应力UHPC无腹筋梁的抗剪破坏方式均表现为脆性破坏,随着剪跨比的增大,试验梁破坏形态依次表现为斜压破坏、剪压破坏、剪拉破坏;剪跨比越大,斜裂缝的数量越少、倾角越小,试验梁的极限抗剪承载力越小,且减小趋势变缓。基于极限平衡法推导了体外预应力UHPC无腹筋梁的抗剪承载力计算公式,验算了14片无黏结预应力UHPC梁的抗剪承载力,该公式适用性良好。 展开更多
关键词 桥梁 抗剪性能 试验研究 超高性能混凝土 体外预应力 抗剪承载力
下载PDF
受损PPC斜拉桥主梁灌缝加固后疲劳性能试验研究
15
作者 袁晟 颜东煌 +3 位作者 王文熙 刘昀 潘权 袁明 《中南大学学报(自然科学版)》 EI CAS CSCD 北大核心 2024年第3期1068-1081,共14页
为进一步研究受损部分预应力混凝土(PPC)斜拉桥主梁裂缝灌浆加固后的疲劳性能,对受较大疲劳及静力损伤的PPC斜拉桥节段缩尺模型主梁进行裂缝灌浆加固,并开展疲劳及疲劳后静载试验研究。研究结果表明:在疲劳荷载作用下,灌浆裂缝未重新开... 为进一步研究受损部分预应力混凝土(PPC)斜拉桥主梁裂缝灌浆加固后的疲劳性能,对受较大疲劳及静力损伤的PPC斜拉桥节段缩尺模型主梁进行裂缝灌浆加固,并开展疲劳及疲劳后静载试验研究。研究结果表明:在疲劳荷载作用下,灌浆裂缝未重新开裂,在疲劳加载初期(约20万次),结构体系刚度下降较快,后期下降较平缓;250万次疲劳加载后,主梁L/4、L/2和3L/4截面处的结构体系刚度分别降低12.83%、9.48%、13.62%,较原主梁第4轮疲劳加载下结构体系刚度下降幅度大,但疲劳结束时结构体系刚度仍然比原主梁第4轮疲劳加载初始结构体系刚度大;对裂缝进行灌浆处置能有效恢复PPC斜拉桥主梁的抗裂强度及结构体系刚度;随着荷载增大,灌浆裂缝逐步张开,但最大裂缝宽度对应位置发生转移,同时不断有新裂缝产生,且裂缝分布区域范围增大,环氧树脂胶的作用极大地延缓了裂缝宽度的增大,提高了主梁的抗裂性能;环氧树脂胶不仅能修复混凝土裂缝界面,同时能有效恢复钢筋与混凝土间的黏结滑移损伤;对受严重损伤的PPC斜拉桥主梁仅进行裂缝灌浆处置后,主梁仍然具有良好的抗疲劳性能,同时,其疲劳后的抗裂性能及刚度也得到较大恢复。 展开更多
关键词 桥梁工程 混凝土斜拉桥 部分预应力 灌缝加固 疲劳性能 模型试验
下载PDF
武汉市江汉四桥拓宽工程主桥设计关键技术
16
作者 孙文峰 陈宇 +2 位作者 王碧波 程应刚 余家富 《铁道标准设计》 北大核心 2024年第9期88-94,共7页
武汉市江汉四桥拓宽工程主桥采用与旧桥外形一致、呈反对称布置的主跨232 m独塔混合梁斜拉桥,跨径布置为(232+70+40+20)m,采用刚构体系。主梁采用钢-混叠合梁与预应力混凝土梁组成的混合梁,钢-混结合面位于主跨距桥塔中心线9 m处,主跨... 武汉市江汉四桥拓宽工程主桥采用与旧桥外形一致、呈反对称布置的主跨232 m独塔混合梁斜拉桥,跨径布置为(232+70+40+20)m,采用刚构体系。主梁采用钢-混叠合梁与预应力混凝土梁组成的混合梁,钢-混结合面位于主跨距桥塔中心线9 m处,主跨采用双边工字形叠合梁,桥面宽23.5 m,标准梁高1.6 m;边跨采用预应力混凝土边主梁和箱形截面主梁,桥面宽23.5~27.0 m,标准梁高2.1 m。桥塔采用“A”形混凝土塔,塔高114.5 m,其下布置整体式承台,采用18根ϕ2.8 m的群桩基础。斜拉索按空间扇形双索面布置,共104根斜拉索,采用标准强度1770 MPa高强平行钢丝索,主跨梁端采用锚拉板锚固,边跨梁端设置槽口锚固,塔端采用锚固齿块锚固,主塔斜拉索锚固区纵、横桥向均配置有无粘结预应力钢棒。汉阳岸边墩采用T形钢筋混凝土板墩及钻孔桩基础;汉口岸边墩、辅助墩均采用钢筋混凝土独柱墩及钻孔桩基础。桥塔塔柱采用爬模施工;边跨主梁采用支架现浇施工,主跨主梁采用悬臂拼装施工。结构计算结果表明,大桥结构刚度及应力均满足要求。 展开更多
关键词 拓宽工程 独塔斜拉桥 混合梁 工字形叠合梁 预应力混凝土边主梁 “A”形桥塔 群桩基础 桥梁设计
下载PDF
某在役重载铁路32 m预应力混凝土T梁后装声屏障适应性分析
17
作者 郑晓光 刘永前 +2 位作者 陈树礼 李勇 许宏伟 《铁道标准设计》 北大核心 2024年第3期123-132,共10页
随着我国货运铁路重载扩能运输的发展,大轴重、长编组引起的噪声污染日趋严重,后装声屏障已成为减小噪声污染的主要措施之一,但通过扩能改造提升的在役重载铁路桥梁原设计时并未考虑后装声屏障对桥梁结构的影响。为研究在重载铁路桥梁... 随着我国货运铁路重载扩能运输的发展,大轴重、长编组引起的噪声污染日趋严重,后装声屏障已成为减小噪声污染的主要措施之一,但通过扩能改造提升的在役重载铁路桥梁原设计时并未考虑后装声屏障对桥梁结构的影响。为研究在重载铁路桥梁上后装声屏障的适应性,以在役铁路桥梁主梁型32 m简支T梁(专桥-2059A)为研究对象,采用数值模拟与结合现场实测桥梁现状分析的方法,基于不同荷载组合作用,开展T梁加装声屏障后主梁、声屏障与桥梁连接的位置及道砟槽板适应性分析,并对T梁翼缘板及声屏障结构的潜在薄弱位置进行破坏分析。研究结果表明:T梁加装声屏障后,主梁纵向强度受梁体L/8~L/4处抗剪控制,其中梁体L/8处抗剪安全系数为1.70,小于规范要求值1.80;声屏障与桥梁连接位置安全储备不足,其中,在最不利荷载组合作用下,挡砟墙钢筋应力超过容许值1.25倍、裂缝宽度超过容许值0.54 mm;道砟槽板在最不利荷载组合作用下,其钢筋应力安全储备剩余23.2%、裂缝宽度比规范容许值小0.07 mm。综合考虑3种分析,该类型T梁不宜后装声屏障;在最不利情况下,T梁及声屏障结构破坏顺序依次为预埋化学锚栓处、挡砟墙处、声屏障立柱与水平杆交接处、道砟槽板变高度处、翼缘板根部处。 展开更多
关键词 重载铁路 铁路桥梁 预应力混凝土 T梁 声屏障 实测修正 数值模拟 适应性
下载PDF
高速公路后张法预应力混凝土桥梁施工技术与应用 被引量:1
18
作者 代勤飞 《科技创新与应用》 2024年第22期193-196,共4页
后张法预应力混凝土桥梁施工技术可以为桥梁建设提供有力支持,合理应用该技术,能够提高桥梁的耐久性和承载力,更好地规避裂纹等病害,进而延长桥梁的使用寿命,为我国交通事业的发展作出更大贡献。该文重点阐述后张法预应力科技在路桥施... 后张法预应力混凝土桥梁施工技术可以为桥梁建设提供有力支持,合理应用该技术,能够提高桥梁的耐久性和承载力,更好地规避裂纹等病害,进而延长桥梁的使用寿命,为我国交通事业的发展作出更大贡献。该文重点阐述后张法预应力科技在路桥施工中的几个关键环节,并重点介绍在高速公路路桥施工中预应力后张法科技的重要施工方法,并给出相应的常见的措施,可供参考。 展开更多
关键词 后张法 预应力混凝土 桥梁施工 高速公路 混凝土桥梁
下载PDF
深中通道泄洪区非通航孔桥主梁设计
19
作者 张卫红 《桥梁建设》 EI CSCD 北大核心 2024年第3期117-122,共6页
深中通道泄洪区非通航孔桥总长6.05 km,分布于伶仃洋大桥及中山大桥2座通航孔桥两侧。泄洪区非通航孔桥采用等跨连续梁布置,4~6跨一联。主梁设计过程中,首先进行110、120、130 m三种跨径方案比选,确定采用最经济的110 m跨径方案。然后... 深中通道泄洪区非通航孔桥总长6.05 km,分布于伶仃洋大桥及中山大桥2座通航孔桥两侧。泄洪区非通航孔桥采用等跨连续梁布置,4~6跨一联。主梁设计过程中,首先进行110、120、130 m三种跨径方案比选,确定采用最经济的110 m跨径方案。然后针对结构形式,提出预应力混凝土梁、钢-混组合梁和钢箱梁3种方案,从力学性能、经济性和施工风险等方面综合考虑,最终推荐采用钢箱梁方案。钢箱梁采用外形简洁流畅的封闭式断面,有利于后期维养;考虑全线景观效果,主梁高度取4 m,高跨比为1/27.5;横隔板间距取2.5 m,采用实腹式横隔板和框架式横肋的组合式设计,使箱室内部通透性更好;钢箱梁采用Q420qD钢和Q345qD钢2种材料。钢箱梁施工采用适合海上长大桥梁的大节段预制+现场拼装的施工方案。 展开更多
关键词 连续梁桥 预应力混凝土梁 钢-混组合梁 钢箱梁 封闭式断面 方案比选 结构设计
下载PDF
大跨径预应力混凝土连续梁桥加固研究进展
20
作者 覃清玥 李岩 +1 位作者 张文学 陈富琨 《建材技术与应用》 2024年第3期49-57,共9页
基于我国危旧桥改造需求多、病害情况复杂给桥梁加固提出的挑战,需把握桥梁加固国内外的研究现状,为未来深入研究和工程应用提供参考。结合大跨径预应力混凝土连续梁桥主要加固手段的基本原理,对各加固手段的优点、局限性及适用对象进... 基于我国危旧桥改造需求多、病害情况复杂给桥梁加固提出的挑战,需把握桥梁加固国内外的研究现状,为未来深入研究和工程应用提供参考。结合大跨径预应力混凝土连续梁桥主要加固手段的基本原理,对各加固手段的优点、局限性及适用对象进行分析,系统梳理近两年来的最新研究成果,并对未来发展进行了展望。 展开更多
关键词 桥梁加固 大跨径 预应力混凝土连续梁桥
下载PDF
上一页 1 2 81 下一页 到第
使用帮助 返回顶部