Potential sources are simplified as point sources or linear sources in current probabilistic seismic hazard analysis (PSHA) methods. Focus size of large earthquakes is considerable, and fault rupture attitudes may h...Potential sources are simplified as point sources or linear sources in current probabilistic seismic hazard analysis (PSHA) methods. Focus size of large earthquakes is considerable, and fault rupture attitudes may have great influence upon the seismic hazard of a site which is near the source. Under this circumstance, it is unreasonable to use the simplified potential source models in the PSHA, so a potential rupture surface model is proposed in this paper. Adopting this model, we analyze the seismic hazard near the Chelungpu fault that generated the Chi-Chi (Jiji) earthquake with magnitude 7.6 and the following conclusions are reached. (1) This model is reasonable on the base of focal mechanism, especially for sites near potential earthquakes with large magnitude; (2) The attitudes of potential rupture surfaces have great influence on the results of probabilistic seismic hazard analysis and seismic zoning.展开更多
In this study, we present a PSHA(Probabilistic Seismic Hazard Analysis) for the city of San Juan, which is located in the central-western region of Argentina(30°S-35.5°S; 66.5°W-71°W). In addit...In this study, we present a PSHA(Probabilistic Seismic Hazard Analysis) for the city of San Juan, which is located in the central-western region of Argentina(30°S-35.5°S; 66.5°W-71°W). In addition to crustal earthquakes provided by catalogues, recent paleoseismological and neotectonic investigations have permitted to consider events which occurred during the last 400 years.Four seismogenic sources that could cause damages to the studied site corresponding to Precordillera,Western Sierras Pampeanas, Basement of the Cuyana Basin and Cordillera Principal were identified.Based on the evaluation of the contribution of these sources,maximum moment magnitudes above 7.5(Mw) are expected.High values of SA(spectral acceleration)(0.2 and 1 s periods) and PGA(peak ground acceleration) were found in the city of San Juan, which suggests that it is located in a zone of high seismic hazard.Finally, the obtained SA spectra were compared with the seismic-resistant construction standards of Argentina INPRES-CIRSOC 103 [1]. Results suggest that for the city of San Juan and for a return period of475 years, it covers the seismic requirements of the structures.展开更多
With the development and implementation of performance-based earthquake engineering,harmonization of performance levels between structural and nonstructural components becomes vital. Even if the structural components ...With the development and implementation of performance-based earthquake engineering,harmonization of performance levels between structural and nonstructural components becomes vital. Even if the structural components of a building achieve a continuous or immediate occupancy performance level after a seismic event,failure of architectural,mechanical or electrical components can lower the performance level of the entire building system. This reduction in performance caused by the vulnerability of nonstructural components has been observed during recent earthquakes worldwide. Moreover,nonstructural damage has limited the functionality of critical facilities,such as hospitals,following major seismic events. The investment in nonstructural components and building contents is far greater than that of structural components and framing. Therefore,it is not surprising that in many past earthquakes,losses from damage to nonstructural components have exceeded losses from structural damage. Furthermore,the failure of nonstructural components can become a safety hazard or can hamper the safe movement of occupants evacuating buildings,or of rescue workers entering buildings. In comparison to structural components and systems,there is relatively limited information on the seismic design of nonstructural components. Basic research work in this area has been sparse,and the available codes and guidelines are usually,for the most part,based on past experiences,engineering judgment and intuition,rather than on objective experimental and analytical results. Often,design engineers are forced to start almost from square one after each earthquake event: to observe what went wrong and to try to prevent repetitions. This is a consequence of the empirical nature of current seismic regulations and guidelines for nonstructural components. This review paper summarizes current knowledge on the seismic design and analysis of nonstructural building components,identifying major knowledge gaps that will need to be filled by future research. Furthermore,considering recent trends in earthquake engineering,the paper explores how performance-based seismic design might be conceived for nonstructural components,drawing on recent developments made in the field of seismic design and hinting at the specific considerations required for nonstructural components.展开更多
Probabilistic analysis in the field of seismic landslide hazard assessment is often based on an estimate of uncertainties of geological, geotechnical,geomorphological and seismological parameters.However, real situati...Probabilistic analysis in the field of seismic landslide hazard assessment is often based on an estimate of uncertainties of geological, geotechnical,geomorphological and seismological parameters.However, real situations are very complex and thus uncertainties of some parameters such as water content conditions and critical displacement are difficult to describe with accurate mathematical models. In this study, we present a probabilistic methodology based on the probabilistic seismic hazard analysis method and the Newmark’s displacement model. The Tianshui seismic zone(105°00′-106°00′ E, 34°20′-34°40′ N) in the northeastern Tibetan Plateau were used as an example. Arias intensity with three standard probabilities of exceedance(63%, 10%, and 2% in 50 years) in accordance with building design provisions were used to compute Newmark displacements by incorporating the effects of topographic amplification.Probable scenarios of water content condition were considered and three water content conditions(dry,wet and saturated) were adopted to simulate the effect of pore-water on slope. The influence of 5 cm and 10 cm critical displacements were investigated in order to analyze the sensitivity of critical displacement to the probabilities of earthquake-induced landslide occurrence. The results show that water content in particular, have a great influence on the distribution of high seismic landslide hazard areas. Generally, the dry coverage analysis represents a lower bound for susceptibility and hazard assessment, and the saturated coverage analysis represents an upper bound to some extent. Moreover, high seismic landslide hazard areas are also influenced by the critical displacements. The slope failure probabilities during future earthquakes with critical displacements of 5 cm can increase by a factor of 1.2 to 2.3 as compared to that of 10 cm. It suggests that more efforts are required in order to obtain reasonable threshold values for slope failure. Considering the probable scenarios of water content condition which is varied with seasons, seismic landslide hazard assessments are carried out for frequent, occasional and rare earthquake occurrences in the Tianshui region, which can provide a valuable reference for landslide hazard management and infrastructure design in mountainous seismic zones.展开更多
The potential for devastating earthquakes in the Himalayan orogeny has long been recognized. The 2015 MW7.8 Gorkha, Nepal earthquake has heightened the likelihood that major earthquakes will occur along this orogenic ...The potential for devastating earthquakes in the Himalayan orogeny has long been recognized. The 2015 MW7.8 Gorkha, Nepal earthquake has heightened the likelihood that major earthquakes will occur along this orogenic belt in the future. Reliable seismic hazard assessment is a critical element in development of policy for seismic hazard mitigation and risk reduction. In this study, we conduct probabilistic seismic hazard assessment using three different seismogenic source models(smoothed gridded, linear, and areal sources)based on the complicated tectonics of the study area. Two sets of ground motion prediction equations are combined in a standard logic tree by taking into account the epistemic uncertainties in hazard estimation. Long-term slip rates and paleoseismic records are also incorporated in the linear source model. Peak ground acceleration and spectral acceleration at 0.2 s and 1.0 s for 2% and 10%probabilities of exceedance in 50 years are estimated. The resulting maps show significant spatial variation in seismic hazard levels. The region of the Lesser Himalaya is found to have high seismic hazard potential. Along the Main Himalayan Thrust from east to west beneath the Main Central Thrust, large earthquakes have occurred regularly in history; hazard values in this region are found to be higher than those shown on existing hazard maps. In essence, the combination of long span earthquake catalogs and multiple seismogenic source models gives improved seismic hazard constraints in Nepal.展开更多
The seismic design and analysis of nuclear power plant (NPP) begin with the seismic hazard assessment and design ground motion development for the site. The following steps are needed for the seismic hazard assessment...The seismic design and analysis of nuclear power plant (NPP) begin with the seismic hazard assessment and design ground motion development for the site. The following steps are needed for the seismic hazard assessment and design ground motion development:a. the development of regional seismo-tectonic model with seismic source areas within 500 km radius centered to the site;b. the development of strong motion prediction equations; c. logic three development for taking into account uncertainties and seismic hazard quantification;d. the development of uniform hazard response spectra for ground motion at the site;e. simulation of acceleration time histories compatible with uniform hazard response spectra. The following phase two in seismic design of NPP structures is the analysis of structural response for the design ground motion. This second phase of the process consists of the following steps:a. development of structural models of the plant buildings;b. development of the soil model underneath the plant buildings for soilstructure interaction response analysis;c. determination of instructure response spectra for the plant buildings for the equipment response analysis. In the third phase of the seismic design and analysis the equipment is analyzed on the basis of in-structure response spectra. For this purpose the structural models of the mechanical components and piping in the plant are set up. In large 3D-structural models used today the heaviest equipment of the primary coolant circuit is included in the structural model of the reactor building. In the fourth phase the electrical equipment and automation and control equipment are seismically qualified with the aid of the in-structure spectra developed in the phase two using large three-axial shaking tables. For this purpose the smoothed envelope spectra for calculated in-structure spectra are constructed and acceleration time is fitted to these smoothed envelope spectra.展开更多
In the field of earthquake engineering,the advent of the performance-based design philosophy,together with the highly uncertain nature of earthquake ground excitations to structures,has brought probabilistic performan...In the field of earthquake engineering,the advent of the performance-based design philosophy,together with the highly uncertain nature of earthquake ground excitations to structures,has brought probabilistic performance-based design to the forefront of seismic design.In order to design structures that explicitly satisfy probabilistic performance criteria,a probabilistic performance-based optimum seismic design(PPBOSD)framework is proposed in this paper by extending the state-of-the-art performance-based earthquake engineering(PBEE)methodology.PBEE is traditionally used for risk evaluation of existing or newly designed structural systems,thus referred to herein as forward PBEE analysis.In contrast,its use for design purposes is limited because design is essentially a more challenging inverse problem.To address this challenge,a decision-making layer is wrapped around the forward PBEE analysis procedure for computer-aided optimum structural design/retrofit accounting for various sources of uncertainty.In this paper,the framework is illustrated and validated using a proof-of-concept problem,namely tuning a simplified nonlinear inelastic single-degreeof-freedom(SDOF)model of a bridge to achieve a target probabilistic loss hazard curve.For this purpose,first the forward PBEE analysis is presented in conjunction with the multilayer Monte Carlo simulation method to estimate the total loss hazard curve efficiently,followed by a sensitivity study to investigate the effects of system(design)parameters on the probabilistic seismic performance of the bridge.The proposed PPBOSD framework is validated by successfully tuning the system parameters of the structure rated for a target probabilistic seismic loss hazard curve.The PPBOSD framework provides a tool that is essential to develop,calibrate and validate simplified probabilistic performance-based design procedures.展开更多
Subduction of Indian plate beneath the Eurasian plate has formed three thrust faults along Himalayas. Due to continuous shortening, many earthquakes have occurred in the past causing massive deaths and destructions s...Subduction of Indian plate beneath the Eurasian plate has formed three thrust faults along Himalayas. Due to continuous shortening, many earthquakes have occurred in the past causing massive deaths and destructions showing that earthquakes are the greatest threat. Seismic hazard of the central Himalayan region has been examined based upon kernel density function method. Faults are so nearer that it is difficult to judge which earthquake belongs to which fault and even some parts of the faults do not hold earthquakes, and usual method of assigning the earthquakes to the nearest fault developing magnitude-frequency relationship is not applicable. Thus, seismic hazard is estimated considering area sources with different densities at each location based upon historical earthquakes using kernel density functions which account both earthquake sizes and numbers. Fault is considered as one earthquake with its highest magnitude at centre when calculating density but does not aid in earthquake data base for recurrence relationship. Since there are no specific attenuation laws developed for the Himalayan region, five attenuation laws developed for other subduction zones are selected and used giving equal weight to all to minimize the uncertainties. Then, probabilistic spectra for various natural periods at Kathmandu are calculated and plotted.展开更多
The Tohoku-Oki earthquake (Mw 9.0) of March 11,2011, was the largest event in the history of Japan. This magnitude 9.0 mega-thrust earthquake initiated approximately 100 km off-shore of Miyagi prefecture and the rup...The Tohoku-Oki earthquake (Mw 9.0) of March 11,2011, was the largest event in the history of Japan. This magnitude 9.0 mega-thrust earthquake initiated approximately 100 km off-shore of Miyagi prefecture and the rupture extended 400-500 km along the Pacific plate. Due to the strong ground motions and tsunami associated by this event, approximately twenty thousand people were killed or missing and more than 220 thousands houses and buildings were totally or partially destroyed. This mega-thrust earthquake was not considered in the national seismic hazard maps for Japan that was published by the HERP (headquarters for earthquake research promotion) of Japan. By comparing the results of the seismic hazard assessment and observed strong ground motions, we understand that the results of assessment were underestimated in Fukushima prefecture and northern part of Ibaraki prefecture. Its cause primarily lies in that it failed to evaluate the Mw 9.0 mega-thrust earthquake in the long-term evaluation for seismic activities. On the other hand, another cause is that we could not make the functional framework which is prepared for treatment of uncertainty for probabilistic seismic hazard assessment work fully. Based on the lessons learned from this earthquake disaster and the experience that we have engaged in the seismic hazard mapping project of Japan, we consider problems and issues to be resolved for probabilistic seismic hazard assessment and make new proposals to improve probabilistic seismic hazard assessment for Japan.展开更多
Studying strong motion records and the spatial distribution of ground shaking is of great importance in understanding the underlying causes of damage in earthquakes. Many regions in the world are either not instrument...Studying strong motion records and the spatial distribution of ground shaking is of great importance in understanding the underlying causes of damage in earthquakes. Many regions in the world are either not instrumented or are sparsely instrumented. As such, significant opportunities for motion-damage correlations are lost. Two recent and damaging earthquakes belong to the class of lost opportunities, namely the Kashmir (Pakistan) earthquake of October 2005 and the Yogyakarta (Indonesia) earthquake of May 2006. In this paper, an overview of the importance of supply and demand studies in earthquake-stricken regions is given, followed by two examples of investigative engineering seismology aimed at reconstructing the hazard from sparse data. The paper closes with a plea for responsible authorities to invest in seismic monitoring networks in the very near future.展开更多
Many destructive earthquakes happened in Tehran, Iran in the last centuries. The existence of active faults like the North Tehran is the main cause of seismicity in this city. According to past investigations, it is e...Many destructive earthquakes happened in Tehran, Iran in the last centuries. The existence of active faults like the North Tehran is the main cause of seismicity in this city. According to past investigations, it is estimated that in the scenario of activation of the North Tehran fault, many structures in Tehran will collapse. Therefore, it is necessary to incorporate the near field rupture directivity effects of this fault into the seismic hazard assessment of important sites in Tehran. In this study, using calculations coded in MATLAB, Probabilistic Seismic Hazard Analysis (PSHA) is conducted for an important site in Tehran. Following that, deaggregation technique is performed on PSHA and the contribution of seis- mic scenarios to hazard is obtained in the range of distance and magnitude. After identifying the North Tehran fault as the most hazardous source affecting the site in 10000-year return period, rupture directivity effects of this fault is incorporated into the seismic hazard assessment using Somerville et al. (1997) model with broadband approach and Shahi and Baker (2011) model with narrowband approach. The results show that the narrowband approach caused a 27% increase in the peak of response spectrum in 10000-year return period compared with the conventional PSHA. Therefore, it is necessary to incorporate the near fault rupture directivity effects into the higher levels of seismic hazard assessment attributed to important sites.展开更多
We are living in a world of numbers and calculations with enormous amount of pretty fast user-friendly software ready for an automatic output that may lead to a discovery or,alternatively,mislead to a deceptive conclu...We are living in a world of numbers and calculations with enormous amount of pretty fast user-friendly software ready for an automatic output that may lead to a discovery or,alternatively,mislead to a deceptive conclusion,erroneous claims and predictions.As a matter of fact,nowadays,Science can disclose Natural Hazards,assess Risks,and deliver the state-of-the-art Knowledge of looming disaster in advance catastrophes along with useful Recommendations on the level of risks for decision making regarding engineering design,insurance,and emergency management.展开更多
The Federal Highway Administration (FHWA) sponsored a large,multi-year project conducted by the Multidisciplinary Center for Earthquake Engineering Research (MCEER) titled'Seismic Vulnerability of New Highway Cons...The Federal Highway Administration (FHWA) sponsored a large,multi-year project conducted by the Multidisciplinary Center for Earthquake Engineering Research (MCEER) titled'Seismic Vulnerability of New Highway Construction'(MCEER Project 112),which was completed in 1998.MCEER coordinated the work of many researchers,who performed studies on the seismic design and vulnerability analysis of highway bridges,tunnels,and retaining structures. Extensive research was conducted to provide revisions and improvements to current design and detailing approaches and national design specifications for highway bridges.The program included both analytical and experimental studies,and addressed seismic hazard exposure and ground motion input for the U.S.highway system;foundation design and soil behavior: structural importance,analysis,and response:structural design issues and details;and structural design criteria.展开更多
Estimation of seismic hazard for the fast developing coastal area of Pakistan is carried out using deterministic and probabilistic approaches. On the basis of seismotectonics and geology, eleven faults are recognized ...Estimation of seismic hazard for the fast developing coastal area of Pakistan is carried out using deterministic and probabilistic approaches. On the basis of seismotectonics and geology, eleven faults are recognized in five seismic provinces as potential hazard sources. Maximum magnitude potential for each of these sources is calculated. Peak ground acceleration (PGA) values at the seven coastal cities due to the maximum credible earthquake on the relevant source are also obtained. Cities of Gwadar and Ormara with acceleration values of 0.21g and 0.25g respectively fall in the high seismic risk area. Cities of Turbat and Karachi lie in low seismic risk area with acceleration values of less than 0.1g. The Probabilistic PGA maps with contour interval of 0.05g for 50 and 100 years return period with 90% probability of non-exceedance are also compiled.展开更多
The seismic design criterion adopted in the existing seismic design codes is reviewed. It is pointed out that the presently used seismic design criterion is not satisfied with the requirements of nowadays social and e...The seismic design criterion adopted in the existing seismic design codes is reviewed. It is pointed out that the presently used seismic design criterion is not satisfied with the requirements of nowadays social and economic development. A new performance-based seismic design criterion that is composed of three components is presented in this paper. It can not only effectively control the economic losses and casualty, but also ensure the building's function in proper operation during earthquakes. The three components are: classification of seismic design for buildings, determination of seismic design intensity and/or seismic design ground motion for controlling seismic economic losses and casualties, and determination of the importance factors in terms of service periods of buildings. For controlling the seismic human losses, the idea of socially acceptable casualty level is presented and the 'Optimal Economic Decision Model' and 'Optimal Safe Decision Model' are established. Finally, a new method is recommended for calculating the importance factors of structures by adjusting structures service period on the base of more important structure with longer service period than the conventional ones. Therefore, the more important structure with longer service periods will be designed for higher seismic loads, in case the exceedance probability of seismic hazard in different service period is same.展开更多
The seismic safety of nuclear power plan(tNPP)has always been a major consideration in the site selection,design,operation,and more recently recertification of existing installations. In addition to the actual NPP and...The seismic safety of nuclear power plan(tNPP)has always been a major consideration in the site selection,design,operation,and more recently recertification of existing installations. In addition to the actual NPP and all their operational and safety related support systems,the storage of spent fuel in temporary or permanent storage facilities also poses a seismic risk. This seismic risk is typically assessed with state-of-the-art modeling and analytical tools that capture everything from the ground rupture or source of the earthquake to the site specific ground shaking,taking geotechnical parameters and soilfoundationstructureinteraction (SFSI) into account to the non-linear structural response of the reactor core,the containment structure,the core cooling system and the emergency cooling system(s),to support systems,piping systems and non-structural components,and finally the performance of spent fuel storage in the probabilistically determined operational basis earthquake (OBE) or the safe shutdown earthquake (SSE) scenario. The best and most meaningful validation and verification of these advanced analytical tools is in the form of full or very large scale experimental testing,designed and conducted in direct support of model and analysis tool calibration. This paper outlines the principles under which such calibration testing should be conducted and illustrates with examples the kind of testing and parameter evaluation required.展开更多
It has been a period of time since the concept of scenario earthquake was proposed, but this concept has rarely been used in seismic safety evaluation in China since then. Meanwhile, because of the uncertainties of ma...It has been a period of time since the concept of scenario earthquake was proposed, but this concept has rarely been used in seismic safety evaluation in China since then. Meanwhile, because of the uncertainties of magnitudes-distances pairs, there is large arbitrariness while determining the envelope function of time histories in seismic hazard analysis. In this paper, we describe a method to control the envelope functions of the time histories by introducing the most-likely combinations of magnitude and distance of the scenario earthquakes based on a probabilistic method, revise the software of the ellipse model for seismic hazard analysis, and give a computation example.展开更多
Based on the intrinsic characters of the fractal and chaotic dynamic systems of seismic dissipated energy active intensity E d and active intensity of seismic dissipated energy moment I e,the evolutional laws of the...Based on the intrinsic characters of the fractal and chaotic dynamic systems of seismic dissipated energy active intensity E d and active intensity of seismic dissipated energy moment I e,the evolutional laws of the long term system and short term system behavior are discussed respectively.Active and passive earthquake control parameters,maintenance decision and inputted energy optimization of system are discussed by means of the predictive results of short term behavior in practical engineering structures; earthquake resistant design probability,maintenance probability,seismic risk analysis and seismic hazard analysis are also discussed by means of the predictive results of long term behavior probability in practical engineering structures.The content might be valuable for the practical applications of earthquake resistance theory and method,and for earthquake control and earthquake reduction problems in practical engineering structures.展开更多
This paper makes a summary of status of delimitation of seismic zones and belts of China firstly in aspects of studying history, purpose, usage, delimiting principles, various presenting forms and main specialties. Th...This paper makes a summary of status of delimitation of seismic zones and belts of China firstly in aspects of studying history, purpose, usage, delimiting principles, various presenting forms and main specialties. Then the viewpoints are emphasized, making geographical divisions by seismicity is just the most important purpose of delimiting seismic belts and the concept of seismic belt is also quite different from that of seismic statistical zone used in CPSHA method. The concept of seismic statistical zone and its history of evolvement are introduced too. Large differences between these rwo concepts exist separately in their statistical property, actual meaning, gradation, required scale, and property of refusing to overlap each other, aim and usage of delimitation. But in current engineering practice, these two concepts are confused. On the one hand, it causes no fit theory for delimiting seismic statistical zone in PSHA to be set up; on the other hand, researches about delimitation of seismic belts with purposes of seismicity zoning and studying on structural environment, mechanism of earthquake generating also pause to go ahead. Major conclusions are given in the end of this paper, that seismic statistical zone bases on the result of seismic belt delimiting, it only arises in and can be used in the especial PSHA method of China with considering spatially and temporally inhomogeneous seismic activities, and its concept should be clearly differentiated from the concept of seismic belt.展开更多
The building code of any country is considered to be a basic technical guidance document for the seismic design of structures.However,building codes are typically developed for the whole country,without considering si...The building code of any country is considered to be a basic technical guidance document for the seismic design of structures.However,building codes are typically developed for the whole country,without considering site specific models that incorporate detailed site-specific data.Therefore,the adequacy of the design spectrum for building codes may sometimes be questionable.To study the sufficiency of the building codes of Pakistan(BCP-SP-2007),a deterministic seismic hazard analysis(DSHA)based spectrum was developed for a site in the Muzaffargarh area,Pakistan,using an updated earthquake catalogue,seismic source model,and a next generation attenuation model(NGA-WEST-2).Further,an International Building Code(IBC-2000)spectrum was developed for the study area to compare the results.The DSHA-based response spectrum resulted in a peak ground acceleration(PGA)value of 0.21 g for the Chaudwan fault.The evaluation of BCP-SP-2007 and IBC-2000 spectra provided a critical assessment for analyzing the associated margins.A comparison with the DSHA-based response spectrum showed that the BCP-SP-2007 design spectrum mostly overlapped with the DSHA spectrum unlike IBC-2000.However,special attention is needed for designing buildings in the study area when considering earthquake periods longer than 1 s,and the BCP-SP-2007 spectrum can be enhanced when considering a period range of 0.12-0.64 s.Finally,BCP-SP-2007 is based on a probabilistic approach and its comparison with deterministic results showed the significance of both methods in terms of design.展开更多
基金Foundation item: Joint Seismological Science Foundation of China (104065)Social Public Welfare Special Foundation of the Na-tional Research Institutes (2005DIB3J119).
文摘Potential sources are simplified as point sources or linear sources in current probabilistic seismic hazard analysis (PSHA) methods. Focus size of large earthquakes is considerable, and fault rupture attitudes may have great influence upon the seismic hazard of a site which is near the source. Under this circumstance, it is unreasonable to use the simplified potential source models in the PSHA, so a potential rupture surface model is proposed in this paper. Adopting this model, we analyze the seismic hazard near the Chelungpu fault that generated the Chi-Chi (Jiji) earthquake with magnitude 7.6 and the following conclusions are reached. (1) This model is reasonable on the base of focal mechanism, especially for sites near potential earthquakes with large magnitude; (2) The attitudes of potential rupture surfaces have great influence on the results of probabilistic seismic hazard analysis and seismic zoning.
文摘In this study, we present a PSHA(Probabilistic Seismic Hazard Analysis) for the city of San Juan, which is located in the central-western region of Argentina(30°S-35.5°S; 66.5°W-71°W). In addition to crustal earthquakes provided by catalogues, recent paleoseismological and neotectonic investigations have permitted to consider events which occurred during the last 400 years.Four seismogenic sources that could cause damages to the studied site corresponding to Precordillera,Western Sierras Pampeanas, Basement of the Cuyana Basin and Cordillera Principal were identified.Based on the evaluation of the contribution of these sources,maximum moment magnitudes above 7.5(Mw) are expected.High values of SA(spectral acceleration)(0.2 and 1 s periods) and PGA(peak ground acceleration) were found in the city of San Juan, which suggests that it is located in a zone of high seismic hazard.Finally, the obtained SA spectra were compared with the seismic-resistant construction standards of Argentina INPRES-CIRSOC 103 [1]. Results suggest that for the city of San Juan and for a return period of475 years, it covers the seismic requirements of the structures.
文摘With the development and implementation of performance-based earthquake engineering,harmonization of performance levels between structural and nonstructural components becomes vital. Even if the structural components of a building achieve a continuous or immediate occupancy performance level after a seismic event,failure of architectural,mechanical or electrical components can lower the performance level of the entire building system. This reduction in performance caused by the vulnerability of nonstructural components has been observed during recent earthquakes worldwide. Moreover,nonstructural damage has limited the functionality of critical facilities,such as hospitals,following major seismic events. The investment in nonstructural components and building contents is far greater than that of structural components and framing. Therefore,it is not surprising that in many past earthquakes,losses from damage to nonstructural components have exceeded losses from structural damage. Furthermore,the failure of nonstructural components can become a safety hazard or can hamper the safe movement of occupants evacuating buildings,or of rescue workers entering buildings. In comparison to structural components and systems,there is relatively limited information on the seismic design of nonstructural components. Basic research work in this area has been sparse,and the available codes and guidelines are usually,for the most part,based on past experiences,engineering judgment and intuition,rather than on objective experimental and analytical results. Often,design engineers are forced to start almost from square one after each earthquake event: to observe what went wrong and to try to prevent repetitions. This is a consequence of the empirical nature of current seismic regulations and guidelines for nonstructural components. This review paper summarizes current knowledge on the seismic design and analysis of nonstructural building components,identifying major knowledge gaps that will need to be filled by future research. Furthermore,considering recent trends in earthquake engineering,the paper explores how performance-based seismic design might be conceived for nonstructural components,drawing on recent developments made in the field of seismic design and hinting at the specific considerations required for nonstructural components.
基金funded by the National Key R&D Program (Grants No. 2018YFC1504601)National Natural Science Foundation of China (Grants No. 41572313 and 41702343)China Geological Survey Project (Grant No. DD20190717)
文摘Probabilistic analysis in the field of seismic landslide hazard assessment is often based on an estimate of uncertainties of geological, geotechnical,geomorphological and seismological parameters.However, real situations are very complex and thus uncertainties of some parameters such as water content conditions and critical displacement are difficult to describe with accurate mathematical models. In this study, we present a probabilistic methodology based on the probabilistic seismic hazard analysis method and the Newmark’s displacement model. The Tianshui seismic zone(105°00′-106°00′ E, 34°20′-34°40′ N) in the northeastern Tibetan Plateau were used as an example. Arias intensity with three standard probabilities of exceedance(63%, 10%, and 2% in 50 years) in accordance with building design provisions were used to compute Newmark displacements by incorporating the effects of topographic amplification.Probable scenarios of water content condition were considered and three water content conditions(dry,wet and saturated) were adopted to simulate the effect of pore-water on slope. The influence of 5 cm and 10 cm critical displacements were investigated in order to analyze the sensitivity of critical displacement to the probabilities of earthquake-induced landslide occurrence. The results show that water content in particular, have a great influence on the distribution of high seismic landslide hazard areas. Generally, the dry coverage analysis represents a lower bound for susceptibility and hazard assessment, and the saturated coverage analysis represents an upper bound to some extent. Moreover, high seismic landslide hazard areas are also influenced by the critical displacements. The slope failure probabilities during future earthquakes with critical displacements of 5 cm can increase by a factor of 1.2 to 2.3 as compared to that of 10 cm. It suggests that more efforts are required in order to obtain reasonable threshold values for slope failure. Considering the probable scenarios of water content condition which is varied with seasons, seismic landslide hazard assessments are carried out for frequent, occasional and rare earthquake occurrences in the Tianshui region, which can provide a valuable reference for landslide hazard management and infrastructure design in mountainous seismic zones.
基金supported by the grants of the National Nature Science Foundation of China (No. 41761144076, 41490611)the collaborative research program of the Disaster Prevention Research Institute of Kyoto University (No. 29W-03)+2 种基金the COX visiting professor fellowship of the Stanford University to L.B.the Chinese Academy of Sciences (CAS)The World Academy of Sciences (TWAS) President’s Ph D Fellowship to M.M.R
文摘The potential for devastating earthquakes in the Himalayan orogeny has long been recognized. The 2015 MW7.8 Gorkha, Nepal earthquake has heightened the likelihood that major earthquakes will occur along this orogenic belt in the future. Reliable seismic hazard assessment is a critical element in development of policy for seismic hazard mitigation and risk reduction. In this study, we conduct probabilistic seismic hazard assessment using three different seismogenic source models(smoothed gridded, linear, and areal sources)based on the complicated tectonics of the study area. Two sets of ground motion prediction equations are combined in a standard logic tree by taking into account the epistemic uncertainties in hazard estimation. Long-term slip rates and paleoseismic records are also incorporated in the linear source model. Peak ground acceleration and spectral acceleration at 0.2 s and 1.0 s for 2% and 10%probabilities of exceedance in 50 years are estimated. The resulting maps show significant spatial variation in seismic hazard levels. The region of the Lesser Himalaya is found to have high seismic hazard potential. Along the Main Himalayan Thrust from east to west beneath the Main Central Thrust, large earthquakes have occurred regularly in history; hazard values in this region are found to be higher than those shown on existing hazard maps. In essence, the combination of long span earthquake catalogs and multiple seismogenic source models gives improved seismic hazard constraints in Nepal.
文摘The seismic design and analysis of nuclear power plant (NPP) begin with the seismic hazard assessment and design ground motion development for the site. The following steps are needed for the seismic hazard assessment and design ground motion development:a. the development of regional seismo-tectonic model with seismic source areas within 500 km radius centered to the site;b. the development of strong motion prediction equations; c. logic three development for taking into account uncertainties and seismic hazard quantification;d. the development of uniform hazard response spectra for ground motion at the site;e. simulation of acceleration time histories compatible with uniform hazard response spectra. The following phase two in seismic design of NPP structures is the analysis of structural response for the design ground motion. This second phase of the process consists of the following steps:a. development of structural models of the plant buildings;b. development of the soil model underneath the plant buildings for soilstructure interaction response analysis;c. determination of instructure response spectra for the plant buildings for the equipment response analysis. In the third phase of the seismic design and analysis the equipment is analyzed on the basis of in-structure response spectra. For this purpose the structural models of the mechanical components and piping in the plant are set up. In large 3D-structural models used today the heaviest equipment of the primary coolant circuit is included in the structural model of the reactor building. In the fourth phase the electrical equipment and automation and control equipment are seismically qualified with the aid of the in-structure spectra developed in the phase two using large three-axial shaking tables. For this purpose the smoothed envelope spectra for calculated in-structure spectra are constructed and acceleration time is fitted to these smoothed envelope spectra.
文摘In the field of earthquake engineering,the advent of the performance-based design philosophy,together with the highly uncertain nature of earthquake ground excitations to structures,has brought probabilistic performance-based design to the forefront of seismic design.In order to design structures that explicitly satisfy probabilistic performance criteria,a probabilistic performance-based optimum seismic design(PPBOSD)framework is proposed in this paper by extending the state-of-the-art performance-based earthquake engineering(PBEE)methodology.PBEE is traditionally used for risk evaluation of existing or newly designed structural systems,thus referred to herein as forward PBEE analysis.In contrast,its use for design purposes is limited because design is essentially a more challenging inverse problem.To address this challenge,a decision-making layer is wrapped around the forward PBEE analysis procedure for computer-aided optimum structural design/retrofit accounting for various sources of uncertainty.In this paper,the framework is illustrated and validated using a proof-of-concept problem,namely tuning a simplified nonlinear inelastic single-degreeof-freedom(SDOF)model of a bridge to achieve a target probabilistic loss hazard curve.For this purpose,first the forward PBEE analysis is presented in conjunction with the multilayer Monte Carlo simulation method to estimate the total loss hazard curve efficiently,followed by a sensitivity study to investigate the effects of system(design)parameters on the probabilistic seismic performance of the bridge.The proposed PPBOSD framework is validated by successfully tuning the system parameters of the structure rated for a target probabilistic seismic loss hazard curve.The PPBOSD framework provides a tool that is essential to develop,calibrate and validate simplified probabilistic performance-based design procedures.
文摘Subduction of Indian plate beneath the Eurasian plate has formed three thrust faults along Himalayas. Due to continuous shortening, many earthquakes have occurred in the past causing massive deaths and destructions showing that earthquakes are the greatest threat. Seismic hazard of the central Himalayan region has been examined based upon kernel density function method. Faults are so nearer that it is difficult to judge which earthquake belongs to which fault and even some parts of the faults do not hold earthquakes, and usual method of assigning the earthquakes to the nearest fault developing magnitude-frequency relationship is not applicable. Thus, seismic hazard is estimated considering area sources with different densities at each location based upon historical earthquakes using kernel density functions which account both earthquake sizes and numbers. Fault is considered as one earthquake with its highest magnitude at centre when calculating density but does not aid in earthquake data base for recurrence relationship. Since there are no specific attenuation laws developed for the Himalayan region, five attenuation laws developed for other subduction zones are selected and used giving equal weight to all to minimize the uncertainties. Then, probabilistic spectra for various natural periods at Kathmandu are calculated and plotted.
文摘The Tohoku-Oki earthquake (Mw 9.0) of March 11,2011, was the largest event in the history of Japan. This magnitude 9.0 mega-thrust earthquake initiated approximately 100 km off-shore of Miyagi prefecture and the rupture extended 400-500 km along the Pacific plate. Due to the strong ground motions and tsunami associated by this event, approximately twenty thousand people were killed or missing and more than 220 thousands houses and buildings were totally or partially destroyed. This mega-thrust earthquake was not considered in the national seismic hazard maps for Japan that was published by the HERP (headquarters for earthquake research promotion) of Japan. By comparing the results of the seismic hazard assessment and observed strong ground motions, we understand that the results of assessment were underestimated in Fukushima prefecture and northern part of Ibaraki prefecture. Its cause primarily lies in that it failed to evaluate the Mw 9.0 mega-thrust earthquake in the long-term evaluation for seismic activities. On the other hand, another cause is that we could not make the functional framework which is prepared for treatment of uncertainty for probabilistic seismic hazard assessment work fully. Based on the lessons learned from this earthquake disaster and the experience that we have engaged in the seismic hazard mapping project of Japan, we consider problems and issues to be resolved for probabilistic seismic hazard assessment and make new proposals to improve probabilistic seismic hazard assessment for Japan.
基金the Mid-America Earthquake Center, a National Science Foundation Engineering Research Center Supported Under Grant Reference EEC-9701785
文摘Studying strong motion records and the spatial distribution of ground shaking is of great importance in understanding the underlying causes of damage in earthquakes. Many regions in the world are either not instrumented or are sparsely instrumented. As such, significant opportunities for motion-damage correlations are lost. Two recent and damaging earthquakes belong to the class of lost opportunities, namely the Kashmir (Pakistan) earthquake of October 2005 and the Yogyakarta (Indonesia) earthquake of May 2006. In this paper, an overview of the importance of supply and demand studies in earthquake-stricken regions is given, followed by two examples of investigative engineering seismology aimed at reconstructing the hazard from sparse data. The paper closes with a plea for responsible authorities to invest in seismic monitoring networks in the very near future.
文摘Many destructive earthquakes happened in Tehran, Iran in the last centuries. The existence of active faults like the North Tehran is the main cause of seismicity in this city. According to past investigations, it is estimated that in the scenario of activation of the North Tehran fault, many structures in Tehran will collapse. Therefore, it is necessary to incorporate the near field rupture directivity effects of this fault into the seismic hazard assessment of important sites in Tehran. In this study, using calculations coded in MATLAB, Probabilistic Seismic Hazard Analysis (PSHA) is conducted for an important site in Tehran. Following that, deaggregation technique is performed on PSHA and the contribution of seis- mic scenarios to hazard is obtained in the range of distance and magnitude. After identifying the North Tehran fault as the most hazardous source affecting the site in 10000-year return period, rupture directivity effects of this fault is incorporated into the seismic hazard assessment using Somerville et al. (1997) model with broadband approach and Shahi and Baker (2011) model with narrowband approach. The results show that the narrowband approach caused a 27% increase in the peak of response spectrum in 10000-year return period compared with the conventional PSHA. Therefore, it is necessary to incorporate the near fault rupture directivity effects into the higher levels of seismic hazard assessment attributed to important sites.
基金supported by the Russian Science Foundationproject no.20-17-00180-P“Development of a scenario approach to the tasks of seismic hazard and risk assessment”。
文摘We are living in a world of numbers and calculations with enormous amount of pretty fast user-friendly software ready for an automatic output that may lead to a discovery or,alternatively,mislead to a deceptive conclusion,erroneous claims and predictions.As a matter of fact,nowadays,Science can disclose Natural Hazards,assess Risks,and deliver the state-of-the-art Knowledge of looming disaster in advance catastrophes along with useful Recommendations on the level of risks for decision making regarding engineering design,insurance,and emergency management.
基金the Federal Highway Administration under contract number DTFH61-92-C-00112.
文摘The Federal Highway Administration (FHWA) sponsored a large,multi-year project conducted by the Multidisciplinary Center for Earthquake Engineering Research (MCEER) titled'Seismic Vulnerability of New Highway Construction'(MCEER Project 112),which was completed in 1998.MCEER coordinated the work of many researchers,who performed studies on the seismic design and vulnerability analysis of highway bridges,tunnels,and retaining structures. Extensive research was conducted to provide revisions and improvements to current design and detailing approaches and national design specifications for highway bridges.The program included both analytical and experimental studies,and addressed seismic hazard exposure and ground motion input for the U.S.highway system;foundation design and soil behavior: structural importance,analysis,and response:structural design issues and details;and structural design criteria.
文摘Estimation of seismic hazard for the fast developing coastal area of Pakistan is carried out using deterministic and probabilistic approaches. On the basis of seismotectonics and geology, eleven faults are recognized in five seismic provinces as potential hazard sources. Maximum magnitude potential for each of these sources is calculated. Peak ground acceleration (PGA) values at the seven coastal cities due to the maximum credible earthquake on the relevant source are also obtained. Cities of Gwadar and Ormara with acceleration values of 0.21g and 0.25g respectively fall in the high seismic risk area. Cities of Turbat and Karachi lie in low seismic risk area with acceleration values of less than 0.1g. The Probabilistic PGA maps with contour interval of 0.05g for 50 and 100 years return period with 90% probability of non-exceedance are also compiled.
基金Chinese National Natural Science Foundation with the grant No.59895410the China Basic Research and Development Project:the Mechanism and Prediction of the Strong Earthquake of the Continental under the Grant No.95130603
文摘The seismic design criterion adopted in the existing seismic design codes is reviewed. It is pointed out that the presently used seismic design criterion is not satisfied with the requirements of nowadays social and economic development. A new performance-based seismic design criterion that is composed of three components is presented in this paper. It can not only effectively control the economic losses and casualty, but also ensure the building's function in proper operation during earthquakes. The three components are: classification of seismic design for buildings, determination of seismic design intensity and/or seismic design ground motion for controlling seismic economic losses and casualties, and determination of the importance factors in terms of service periods of buildings. For controlling the seismic human losses, the idea of socially acceptable casualty level is presented and the 'Optimal Economic Decision Model' and 'Optimal Safe Decision Model' are established. Finally, a new method is recommended for calculating the importance factors of structures by adjusting structures service period on the base of more important structure with longer service period than the conventional ones. Therefore, the more important structure with longer service periods will be designed for higher seismic loads, in case the exceedance probability of seismic hazard in different service period is same.
文摘The seismic safety of nuclear power plan(tNPP)has always been a major consideration in the site selection,design,operation,and more recently recertification of existing installations. In addition to the actual NPP and all their operational and safety related support systems,the storage of spent fuel in temporary or permanent storage facilities also poses a seismic risk. This seismic risk is typically assessed with state-of-the-art modeling and analytical tools that capture everything from the ground rupture or source of the earthquake to the site specific ground shaking,taking geotechnical parameters and soilfoundationstructureinteraction (SFSI) into account to the non-linear structural response of the reactor core,the containment structure,the core cooling system and the emergency cooling system(s),to support systems,piping systems and non-structural components,and finally the performance of spent fuel storage in the probabilistically determined operational basis earthquake (OBE) or the safe shutdown earthquake (SSE) scenario. The best and most meaningful validation and verification of these advanced analytical tools is in the form of full or very large scale experimental testing,designed and conducted in direct support of model and analysis tool calibration. This paper outlines the principles under which such calibration testing should be conducted and illustrates with examples the kind of testing and parameter evaluation required.
基金sponsored under the keyresearch project of social development of Zhejiang Province(2005C23075)
文摘It has been a period of time since the concept of scenario earthquake was proposed, but this concept has rarely been used in seismic safety evaluation in China since then. Meanwhile, because of the uncertainties of magnitudes-distances pairs, there is large arbitrariness while determining the envelope function of time histories in seismic hazard analysis. In this paper, we describe a method to control the envelope functions of the time histories by introducing the most-likely combinations of magnitude and distance of the scenario earthquakes based on a probabilistic method, revise the software of the ellipse model for seismic hazard analysis, and give a computation example.
文摘Based on the intrinsic characters of the fractal and chaotic dynamic systems of seismic dissipated energy active intensity E d and active intensity of seismic dissipated energy moment I e,the evolutional laws of the long term system and short term system behavior are discussed respectively.Active and passive earthquake control parameters,maintenance decision and inputted energy optimization of system are discussed by means of the predictive results of short term behavior in practical engineering structures; earthquake resistant design probability,maintenance probability,seismic risk analysis and seismic hazard analysis are also discussed by means of the predictive results of long term behavior probability in practical engineering structures.The content might be valuable for the practical applications of earthquake resistance theory and method,and for earthquake control and earthquake reduction problems in practical engineering structures.
文摘This paper makes a summary of status of delimitation of seismic zones and belts of China firstly in aspects of studying history, purpose, usage, delimiting principles, various presenting forms and main specialties. Then the viewpoints are emphasized, making geographical divisions by seismicity is just the most important purpose of delimiting seismic belts and the concept of seismic belt is also quite different from that of seismic statistical zone used in CPSHA method. The concept of seismic statistical zone and its history of evolvement are introduced too. Large differences between these rwo concepts exist separately in their statistical property, actual meaning, gradation, required scale, and property of refusing to overlap each other, aim and usage of delimitation. But in current engineering practice, these two concepts are confused. On the one hand, it causes no fit theory for delimiting seismic statistical zone in PSHA to be set up; on the other hand, researches about delimitation of seismic belts with purposes of seismicity zoning and studying on structural environment, mechanism of earthquake generating also pause to go ahead. Major conclusions are given in the end of this paper, that seismic statistical zone bases on the result of seismic belt delimiting, it only arises in and can be used in the especial PSHA method of China with considering spatially and temporally inhomogeneous seismic activities, and its concept should be clearly differentiated from the concept of seismic belt.
基金the University of Punjab for providing support for this research
文摘The building code of any country is considered to be a basic technical guidance document for the seismic design of structures.However,building codes are typically developed for the whole country,without considering site specific models that incorporate detailed site-specific data.Therefore,the adequacy of the design spectrum for building codes may sometimes be questionable.To study the sufficiency of the building codes of Pakistan(BCP-SP-2007),a deterministic seismic hazard analysis(DSHA)based spectrum was developed for a site in the Muzaffargarh area,Pakistan,using an updated earthquake catalogue,seismic source model,and a next generation attenuation model(NGA-WEST-2).Further,an International Building Code(IBC-2000)spectrum was developed for the study area to compare the results.The DSHA-based response spectrum resulted in a peak ground acceleration(PGA)value of 0.21 g for the Chaudwan fault.The evaluation of BCP-SP-2007 and IBC-2000 spectra provided a critical assessment for analyzing the associated margins.A comparison with the DSHA-based response spectrum showed that the BCP-SP-2007 design spectrum mostly overlapped with the DSHA spectrum unlike IBC-2000.However,special attention is needed for designing buildings in the study area when considering earthquake periods longer than 1 s,and the BCP-SP-2007 spectrum can be enhanced when considering a period range of 0.12-0.64 s.Finally,BCP-SP-2007 is based on a probabilistic approach and its comparison with deterministic results showed the significance of both methods in terms of design.