The paper presents a computer code system 'SRDAAR- QNPP' for the real-time dose as-sessment of an accident release for Qinshan Nuclear Power Plant. It includes three parts:thereal-time data acquisition system,...The paper presents a computer code system 'SRDAAR- QNPP' for the real-time dose as-sessment of an accident release for Qinshan Nuclear Power Plant. It includes three parts:thereal-time data acquisition system, assessment computer. and the assessment operating code system. InSRDAAR-QNPP, the wind field of the surface and the lower levels are determined hourly by using amass consistent three-dimension diasnosis model with the topographic following coordinate system.A Lagrangin Puff model under changing meteorological condition is adopted for atmosphericdispersion, the correction for dry and wet depositions. physical decay and partial plume penetrationof the top inversion and the deviation of plume axis caused by complex terrain have been taken in-to account. The calculation domain areas include three square grid areas with the sideline 10 km, 40krn and 160 km and a grid interval 0.5 km, 2.0 km, 8.0 km respectively. Three exposure pathwaysare taken into account:the external exposure from immersion cloud and passing puff, the internalexposure from inhalation and the external exposure from contaminated ground. This system is ableto provide the results of concentration and dose distributions within 10 minutes after the data havebeen inputed.展开更多
Aiming to meet the demand of the country' s nuclear demonstration project on the CAP1400 nuclear power plant, Baosteel uses the roll-bonding technology and develops the SA-533 Type B CL. 1 + SA-240 Type 304L high-st...Aiming to meet the demand of the country' s nuclear demonstration project on the CAP1400 nuclear power plant, Baosteel uses the roll-bonding technology and develops the SA-533 Type B CL. 1 + SA-240 Type 304L high-strength and high-toughness clad steel plate with a shear strength of over 310 MPa for the nuclear power plant' s safety injection tank. The properties of the quenched and tempered and the simulated post-weld heat treatment states are systematically studied herein through a comprehensive inspection and evaluation of the composition,microstructure,and properties of the clad steel plate. The results show that the bonding interface has high shear strength and that the base metal has high strength and good toughness at low temperatures. Hence, the performance fully meets the technical requirements of the CAP1400 nuclear power plant' s safety injection tank in the country' s nuclear demonstration project. The roll-bonded clad steel plate can be used to manufacture the safety injection tank of the CAP1400 nuclear power plant.展开更多
Recently, plant construction throughout the world, including nuclear power plant construction, has grown significantly. The scale of Korea’s nuclear power plant construction in particular, has increased gradually sin...Recently, plant construction throughout the world, including nuclear power plant construction, has grown significantly. The scale of Korea’s nuclear power plant construction in particular, has increased gradually since it won a contract for a nuclear power plant construction project in the United Arab Emirates in 2009. However, time and monetary resources have been lost in some nuclear power plant construction sites due to lack of risk management ability. The need to prevent losses at nuclear power plant construction sites has become more urgent because it demands professional skills and large-scale resources. Therefore, in this study, the Analytic Hierarchy Process (AHP) and Fuzzy Analytic Hierarchy Process (FAHP) were applied in order to make comparisons between decision-making methods, to assess the potential risks at nuclear power plant construction sites. To suggest the appropriate choice between two decision-making methods, a survey was carried out. From the results, the importance and the priority of 24 risk factors, classified by process, cost, safety, and quality, were analyzed. The FAHP was identified as a suitable method for risk assessment of nuclear power plant construction, compared with risk assessment using the AHP. These risk factors will be able to serve as baseline data for risk management in nuclear power plant construction projects.展开更多
Abstract: The containment vessel of a nuclear power plant is the last barrier to prevent nuclear reactor radiation. Aseismic safety analysis is the key to appropriate containment vessel design. A prestressed concrete...Abstract: The containment vessel of a nuclear power plant is the last barrier to prevent nuclear reactor radiation. Aseismic safety analysis is the key to appropriate containment vessel design. A prestressed concrete containment vessel (PCCV) model with a semi-infinite elastic foundation and practical arrangement of tendons has been established to analyze the aseismic ability of the CPR1000 PCCV structure under seismic loads and internal pressure. A method to model the prestressing tendon and its interaction with concrete was proposed and the axial force of the prestressing tendons showed that the simulation was reasonable and accurate. The numerical results show that for the concrete structure, the location of the cylinder wall bottom around the equipment hatch and near the ring beam are critical locations with large principal stress. The concrete cracks occurred at the bottom of the PCCV cylinder wall under the peak earthquake motion of 0.50 g, however the PCCV was still basically in an elastic state. Furthermore, the concrete cracks occurred around the equipment hatch under the design internal pressure of 0.4MPa, but the steel liner was still in the elastic stage and its leak-proof function soundness was verified. The results provide the basis for analysis and design of containment vessels.展开更多
This paper presents the ageing mechanism of fuse in nuclear power plant in detail. Metal Electromigration is identified as the dominant ageing mechanism. On this basis, the dominant status indicators, temperature and ...This paper presents the ageing mechanism of fuse in nuclear power plant in detail. Metal Electromigration is identified as the dominant ageing mechanism. On this basis, the dominant status indicators, temperature and resistance of fuse were ensured, and current-temperature curve was proposed. The infrared thermal imaging technology was used to inspect the ageing condition and prove the current-temperature curve. Finally, the accelerated ageing testing was conducted abiding by the dominant ageing mechanism, and the lifetime was evaluated.展开更多
With the global warming and sea level rising, it is widely recognized that there is an increasing tendency of typhoon occurrence frequency and intensity. The defenses code against typhoon attacks for nuclear power pla...With the global warming and sea level rising, it is widely recognized that there is an increasing tendency of typhoon occurrence frequency and intensity. The defenses code against typhoon attacks for nuclear power plant should be calibrated because of the increasing threat of typhoon disaster and severe consequences. This paper discusses the probabilistic approach of definitions about "probable maximum typhoon" and "probable maximum storm surge" in nuclear safety regulations of China and has made some design code calibrations by use of a newly proposed Double Layer Nested Mtdti-objective Probability Model (DLNMPM).展开更多
The countermeasures are the actions that should be taken, after the occurrence of a nuclear accident to protect the public against the associated risks. These actions may be represented by sheltering, evacuation, dist...The countermeasures are the actions that should be taken, after the occurrence of a nuclear accident to protect the public against the associated risks. These actions may be represented by sheltering, evacuation, distribution of stable iodine tablets and/or relocation. This study represents a comprehensive probabilistic study to investigate the role of the adoption of the countermeasures in case of a hypothetical accident of type LOCA for nuclear power plant of PWR (1000 Mw). The effective doses in different organs, short and long health effects, and the associated risks are calculated with and without countermeasures. In addition, the overall costs of the accident and the costs of countermeasures are estimated which represent our first trials to know how much the proposed accident cost. The results showed that, the area around the site requires early and late countermeasures action after the accident especially in the downwind sectors. For late countermeasures, the duration time of relocation ranged from about two to 10 years. The adoption of the countermeasures increases the costs of emergency plan by 40% but reduces the risk associated the accident.展开更多
A nuclear power plant real-time engineering simulator was developed based on general-purpose ther- mal-hydraulic system simulation code RELAP5. It mainly consists of three parts:improved thermal-hydraulic system simul...A nuclear power plant real-time engineering simulator was developed based on general-purpose ther- mal-hydraulic system simulation code RELAP5. It mainly consists of three parts:improved thermal-hydraulic system simulation code RELAP5,control and protection system and human-machine interface. A normal transient of CHASHMA nuclear power plant turbine step load change from 100% to 90% of full power,was simulated by the en- gineering simulator as an application example. This paper presents structure and main features of the engineering simulator,and application results are shown and discussed.展开更多
A quantitative environmental assessment method and the corresponding computer code are introduced in this paper. By the consideration of all fuel cycle steps,it gives that the public health risk of China nuclear power...A quantitative environmental assessment method and the corresponding computer code are introduced in this paper. By the consideration of all fuel cycle steps,it gives that the public health risk of China nuclear power industry is 5.2 × 10-1 man /(GW.a), the occupational health risk is 2.5 man /(GW.a), and the total health risk is 3.0 man /(GW.a). After the health risk calculation for coal mining, transport, burning up and ash disposal, it gives that the public health risk of China coal-fired power industry is 3.6mall/(GW-a), the occupational health risk is 50man /(GW.a), and the total is 54man /(GW.d). Accordingly, the conclusion that China nuclear power industry is an industry with high safety and cleanness is derived at the end.展开更多
The original internal flooding probabilistic safety analysis (PSA) study of Krsko Nuclear Power Plant (two-loop Pressurized Water Reactor (PWR) plant of Westinghouse design) was performed in mid nineties and lim...The original internal flooding probabilistic safety analysis (PSA) study of Krsko Nuclear Power Plant (two-loop Pressurized Water Reactor (PWR) plant of Westinghouse design) was performed in mid nineties and limited to reactor core damage risk (Level 1 PSA). In 2003, it was, together with other safety and hazard analyses, subject to the Periodic Safety Review (PSR). In the PSR, it was stated that methodological PSA approaches and guidelines have evoluted during the past decade and several observations were provided, concerning the area screening process, residual risk and treatment of plant damage states and risk from radioactivity releases (i.e., Level 2 PSA). In order to address the PSR observations, upgrade ofKrsko NPP internal flooding PSA was undertaken. The area screening process was revisited in order to cover the areas without automatic reactor trip equipment. The model was extended to Level 2. Residual risk was estimated at both Level 1 and Level 2, in terms of core damage frequency (CDF) and large early release frequency (LERF), respectively.展开更多
This paper presents main results of a comprehensive study performed by the European Clearinghouse on Operating Experience Feedback of NPP with the support of IRSN (Institut de S?reté Nucléaire et de Radiopro...This paper presents main results of a comprehensive study performed by the European Clearinghouse on Operating Experience Feedback of NPP with the support of IRSN (Institut de S?reté Nucléaire et de Radioprotection) and GRS (Gesellschaft für Anlagen und Reaktorsi-cherheit mbH). Physical ageing mechanisms of structure, systems and components that eventually lead to ageing related systems and components failures at nuclear power plants were the main focus of this study. The analysis of ageing related events involved operating experience reported by NPP operators in France, Germany, USA and to the IAEA/NEA International Reporting system, on operating experience for the past 20 years (i.e. 1990-2009). A list of ageing related events was populated. Each ageing related event contained in the list was analyzed and results of analysis were summarized for each commodity group for which the ageing degradation appeared to be a dominant contributor or direct cause. The most common degradation mechanisms/ageing effects for each specific component/commodity group, their risk significance and consequences to the plant performance are described. This paper provides insights into ageing related operating experience as well as recommendations to deal with the physical ageing of nuclear power plant SSC important to safety.展开更多
In order to ensure the highest safety requirements, nuclear power plant structures (the containment structures, the fuel storages and transportation systems) should be assessed against all possible internal and extern...In order to ensure the highest safety requirements, nuclear power plant structures (the containment structures, the fuel storages and transportation systems) should be assessed against all possible internal and external impact threats. The internal impact threats include kinetic missiles generated by the failure of high pressure vessels and pipes, the failure of high speed rotating machineries and accidental drops. The external impact threats may come from airborne missiles, aircraft impact, explosion blast and fragments. The impact effects of these threats on concrete and steel structures in a nuclear power plant are discussed. Methods and procedures for the impact assessment of nuclear power plants are introduced. Recent studies on penetration and perforation mechanics as well as progresses on dynamic properties of concrete-like materials are presented to increase the understanding of the impact effects on concrete containment structures.展开更多
The conflict between safety and economics requirements is peculiar to the present nuclear power (NP). The main point of the conflict is that for traditional type reactors the increase of requirements to safety of nucl...The conflict between safety and economics requirements is peculiar to the present nuclear power (NP). The main point of the conflict is that for traditional type reactors the increase of requirements to safety of nuclear power plants (NPP) worsens their economical characteristics. This is caused by large potential energy accumulated in reactor coolant. In the presented paper the opportunity and expediency of changeover to reactors with heavy liquid-metal coolants (HLMC) in future NP is grounded. First of all, this refers to lead-bismuth coolant (LBC) mastered in the process of operating nuclear submarines (NS) reactors. The reactor facilities (RFs) of that type cannot cause destruction of defense barriers and make possible deterministic elimination of severe accidents with catastrophic radioactivity release. So it will make possible to eliminate the highlighted conflict and reasons for existence of population’s radiophobia. Lead-bismuth fast reactor SVBR-100 with electric power of 100 MWe is the reactor facility of that type. The effect of accumulated in coolant potential energy on safety and economics is considered. Main specific features of SVBR-100 technology providing a high level of inherent self-protection and passive safety are presented.展开更多
文摘The paper presents a computer code system 'SRDAAR- QNPP' for the real-time dose as-sessment of an accident release for Qinshan Nuclear Power Plant. It includes three parts:thereal-time data acquisition system, assessment computer. and the assessment operating code system. InSRDAAR-QNPP, the wind field of the surface and the lower levels are determined hourly by using amass consistent three-dimension diasnosis model with the topographic following coordinate system.A Lagrangin Puff model under changing meteorological condition is adopted for atmosphericdispersion, the correction for dry and wet depositions. physical decay and partial plume penetrationof the top inversion and the deviation of plume axis caused by complex terrain have been taken in-to account. The calculation domain areas include three square grid areas with the sideline 10 km, 40krn and 160 km and a grid interval 0.5 km, 2.0 km, 8.0 km respectively. Three exposure pathwaysare taken into account:the external exposure from immersion cloud and passing puff, the internalexposure from inhalation and the external exposure from contaminated ground. This system is ableto provide the results of concentration and dose distributions within 10 minutes after the data havebeen inputed.
文摘Aiming to meet the demand of the country' s nuclear demonstration project on the CAP1400 nuclear power plant, Baosteel uses the roll-bonding technology and develops the SA-533 Type B CL. 1 + SA-240 Type 304L high-strength and high-toughness clad steel plate with a shear strength of over 310 MPa for the nuclear power plant' s safety injection tank. The properties of the quenched and tempered and the simulated post-weld heat treatment states are systematically studied herein through a comprehensive inspection and evaluation of the composition,microstructure,and properties of the clad steel plate. The results show that the bonding interface has high shear strength and that the base metal has high strength and good toughness at low temperatures. Hence, the performance fully meets the technical requirements of the CAP1400 nuclear power plant' s safety injection tank in the country' s nuclear demonstration project. The roll-bonded clad steel plate can be used to manufacture the safety injection tank of the CAP1400 nuclear power plant.
文摘Recently, plant construction throughout the world, including nuclear power plant construction, has grown significantly. The scale of Korea’s nuclear power plant construction in particular, has increased gradually since it won a contract for a nuclear power plant construction project in the United Arab Emirates in 2009. However, time and monetary resources have been lost in some nuclear power plant construction sites due to lack of risk management ability. The need to prevent losses at nuclear power plant construction sites has become more urgent because it demands professional skills and large-scale resources. Therefore, in this study, the Analytic Hierarchy Process (AHP) and Fuzzy Analytic Hierarchy Process (FAHP) were applied in order to make comparisons between decision-making methods, to assess the potential risks at nuclear power plant construction sites. To suggest the appropriate choice between two decision-making methods, a survey was carried out. From the results, the importance and the priority of 24 risk factors, classified by process, cost, safety, and quality, were analyzed. The FAHP was identified as a suitable method for risk assessment of nuclear power plant construction, compared with risk assessment using the AHP. These risk factors will be able to serve as baseline data for risk management in nuclear power plant construction projects.
基金National Natural Science Foundation of China under Grant Nos.51138001 and 51479027
文摘Abstract: The containment vessel of a nuclear power plant is the last barrier to prevent nuclear reactor radiation. Aseismic safety analysis is the key to appropriate containment vessel design. A prestressed concrete containment vessel (PCCV) model with a semi-infinite elastic foundation and practical arrangement of tendons has been established to analyze the aseismic ability of the CPR1000 PCCV structure under seismic loads and internal pressure. A method to model the prestressing tendon and its interaction with concrete was proposed and the axial force of the prestressing tendons showed that the simulation was reasonable and accurate. The numerical results show that for the concrete structure, the location of the cylinder wall bottom around the equipment hatch and near the ring beam are critical locations with large principal stress. The concrete cracks occurred at the bottom of the PCCV cylinder wall under the peak earthquake motion of 0.50 g, however the PCCV was still basically in an elastic state. Furthermore, the concrete cracks occurred around the equipment hatch under the design internal pressure of 0.4MPa, but the steel liner was still in the elastic stage and its leak-proof function soundness was verified. The results provide the basis for analysis and design of containment vessels.
文摘This paper presents the ageing mechanism of fuse in nuclear power plant in detail. Metal Electromigration is identified as the dominant ageing mechanism. On this basis, the dominant status indicators, temperature and resistance of fuse were ensured, and current-temperature curve was proposed. The infrared thermal imaging technology was used to inspect the ageing condition and prove the current-temperature curve. Finally, the accelerated ageing testing was conducted abiding by the dominant ageing mechanism, and the lifetime was evaluated.
基金supported by the Nationam Natural Science Foundation of China(Grant No.50679076)Office of State Flood Control and Drought Relief Headquarters of China(Grant No.20060120)
文摘With the global warming and sea level rising, it is widely recognized that there is an increasing tendency of typhoon occurrence frequency and intensity. The defenses code against typhoon attacks for nuclear power plant should be calibrated because of the increasing threat of typhoon disaster and severe consequences. This paper discusses the probabilistic approach of definitions about "probable maximum typhoon" and "probable maximum storm surge" in nuclear safety regulations of China and has made some design code calibrations by use of a newly proposed Double Layer Nested Mtdti-objective Probability Model (DLNMPM).
文摘The countermeasures are the actions that should be taken, after the occurrence of a nuclear accident to protect the public against the associated risks. These actions may be represented by sheltering, evacuation, distribution of stable iodine tablets and/or relocation. This study represents a comprehensive probabilistic study to investigate the role of the adoption of the countermeasures in case of a hypothetical accident of type LOCA for nuclear power plant of PWR (1000 Mw). The effective doses in different organs, short and long health effects, and the associated risks are calculated with and without countermeasures. In addition, the overall costs of the accident and the costs of countermeasures are estimated which represent our first trials to know how much the proposed accident cost. The results showed that, the area around the site requires early and late countermeasures action after the accident especially in the downwind sectors. For late countermeasures, the duration time of relocation ranged from about two to 10 years. The adoption of the countermeasures increases the costs of emergency plan by 40% but reduces the risk associated the accident.
文摘A nuclear power plant real-time engineering simulator was developed based on general-purpose ther- mal-hydraulic system simulation code RELAP5. It mainly consists of three parts:improved thermal-hydraulic system simulation code RELAP5,control and protection system and human-machine interface. A normal transient of CHASHMA nuclear power plant turbine step load change from 100% to 90% of full power,was simulated by the en- gineering simulator as an application example. This paper presents structure and main features of the engineering simulator,and application results are shown and discussed.
文摘A quantitative environmental assessment method and the corresponding computer code are introduced in this paper. By the consideration of all fuel cycle steps,it gives that the public health risk of China nuclear power industry is 5.2 × 10-1 man /(GW.a), the occupational health risk is 2.5 man /(GW.a), and the total health risk is 3.0 man /(GW.a). After the health risk calculation for coal mining, transport, burning up and ash disposal, it gives that the public health risk of China coal-fired power industry is 3.6mall/(GW-a), the occupational health risk is 50man /(GW.a), and the total is 54man /(GW.d). Accordingly, the conclusion that China nuclear power industry is an industry with high safety and cleanness is derived at the end.
文摘The original internal flooding probabilistic safety analysis (PSA) study of Krsko Nuclear Power Plant (two-loop Pressurized Water Reactor (PWR) plant of Westinghouse design) was performed in mid nineties and limited to reactor core damage risk (Level 1 PSA). In 2003, it was, together with other safety and hazard analyses, subject to the Periodic Safety Review (PSR). In the PSR, it was stated that methodological PSA approaches and guidelines have evoluted during the past decade and several observations were provided, concerning the area screening process, residual risk and treatment of plant damage states and risk from radioactivity releases (i.e., Level 2 PSA). In order to address the PSR observations, upgrade ofKrsko NPP internal flooding PSA was undertaken. The area screening process was revisited in order to cover the areas without automatic reactor trip equipment. The model was extended to Level 2. Residual risk was estimated at both Level 1 and Level 2, in terms of core damage frequency (CDF) and large early release frequency (LERF), respectively.
文摘This paper presents main results of a comprehensive study performed by the European Clearinghouse on Operating Experience Feedback of NPP with the support of IRSN (Institut de S?reté Nucléaire et de Radioprotection) and GRS (Gesellschaft für Anlagen und Reaktorsi-cherheit mbH). Physical ageing mechanisms of structure, systems and components that eventually lead to ageing related systems and components failures at nuclear power plants were the main focus of this study. The analysis of ageing related events involved operating experience reported by NPP operators in France, Germany, USA and to the IAEA/NEA International Reporting system, on operating experience for the past 20 years (i.e. 1990-2009). A list of ageing related events was populated. Each ageing related event contained in the list was analyzed and results of analysis were summarized for each commodity group for which the ageing degradation appeared to be a dominant contributor or direct cause. The most common degradation mechanisms/ageing effects for each specific component/commodity group, their risk significance and consequences to the plant performance are described. This paper provides insights into ageing related operating experience as well as recommendations to deal with the physical ageing of nuclear power plant SSC important to safety.
文摘In order to ensure the highest safety requirements, nuclear power plant structures (the containment structures, the fuel storages and transportation systems) should be assessed against all possible internal and external impact threats. The internal impact threats include kinetic missiles generated by the failure of high pressure vessels and pipes, the failure of high speed rotating machineries and accidental drops. The external impact threats may come from airborne missiles, aircraft impact, explosion blast and fragments. The impact effects of these threats on concrete and steel structures in a nuclear power plant are discussed. Methods and procedures for the impact assessment of nuclear power plants are introduced. Recent studies on penetration and perforation mechanics as well as progresses on dynamic properties of concrete-like materials are presented to increase the understanding of the impact effects on concrete containment structures.
文摘The conflict between safety and economics requirements is peculiar to the present nuclear power (NP). The main point of the conflict is that for traditional type reactors the increase of requirements to safety of nuclear power plants (NPP) worsens their economical characteristics. This is caused by large potential energy accumulated in reactor coolant. In the presented paper the opportunity and expediency of changeover to reactors with heavy liquid-metal coolants (HLMC) in future NP is grounded. First of all, this refers to lead-bismuth coolant (LBC) mastered in the process of operating nuclear submarines (NS) reactors. The reactor facilities (RFs) of that type cannot cause destruction of defense barriers and make possible deterministic elimination of severe accidents with catastrophic radioactivity release. So it will make possible to eliminate the highlighted conflict and reasons for existence of population’s radiophobia. Lead-bismuth fast reactor SVBR-100 with electric power of 100 MWe is the reactor facility of that type. The effect of accumulated in coolant potential energy on safety and economics is considered. Main specific features of SVBR-100 technology providing a high level of inherent self-protection and passive safety are presented.