In this paper, we consider the replacement of a single unit with catastrophic failure mode. Besides replaced at a preset time, the unit is also replaced at failure time or if it encounters a production wait and its ag...In this paper, we consider the replacement of a single unit with catastrophic failure mode. Besides replaced at a preset time, the unit is also replaced at failure time or if it encounters a production wait and its age has reached a threshold. The joint preventive maintenance interval and threshold optimization problem are formulated with the objective of minimizing the expected cost per unit time in long run. A numerical example is presented to illustrate the applicability of the model.展开更多
基金the National Natural Science Foundation of China(Nos.11426084,11001005,71231001,71301009 and 71420107023)the China Postdoctoral Science Foundation Funded Project(No.2013M530531)+2 种基金the Natural Science Foundation of Hebei Province(No.A2014208133)the Foundation of Hebei Education Department(No.QN2014132)the Ministry of Education Doctor of Philosophy Supervisor Fund(No.20120006110025)
文摘In this paper, we consider the replacement of a single unit with catastrophic failure mode. Besides replaced at a preset time, the unit is also replaced at failure time or if it encounters a production wait and its age has reached a threshold. The joint preventive maintenance interval and threshold optimization problem are formulated with the objective of minimizing the expected cost per unit time in long run. A numerical example is presented to illustrate the applicability of the model.