Production scheduling has a major impact on the productivity of the manufacturing process. Recently, scheduling problems with deteriorating jobs have attracted increasing attentions from researchers. In many practical...Production scheduling has a major impact on the productivity of the manufacturing process. Recently, scheduling problems with deteriorating jobs have attracted increasing attentions from researchers. In many practical situations,it is found that some jobs fail to be processed prior to the pre-specified thresholds,and they often consume extra deteriorating time for successful accomplishment. Their processing times can be characterized by a step-wise function. Such kinds of jobs are called step-deteriorating jobs. In this paper,parallel machine scheduling problem with stepdeteriorating jobs( PMSD) is considered. Due to its intractability,four different mixed integer programming( MIP) models are formulated for solving the problem under consideration. The study aims to investigate the performance of these models and find promising optimization formulation to solve the largest possible problem instances. The proposed four models are solved by commercial software CPLEX. Moreover,the near-optimal solutions can be obtained by black-box local-search solver LocalS olver with the fourth one. The computational results show that the efficiencies of different MIP models depend on the distribution intervals of deteriorating thresholds, and the performance of LocalS olver is clearly better than that of CPLEX in terms of the quality of the solutions and the computational time.展开更多
提出了一种基于STEP-NC的数控车削加工仿真系统,该仿真系统能够验证STEP-NC数控程序、模拟实际系统运行。讨论了仿真系统的译码器、基于特征的加工数据库、实体建模以及仿真驱动等组成模块实现的关键技术和方法。介绍了仿真系统的建模工...提出了一种基于STEP-NC的数控车削加工仿真系统,该仿真系统能够验证STEP-NC数控程序、模拟实际系统运行。讨论了仿真系统的译码器、基于特征的加工数据库、实体建模以及仿真驱动等组成模块实现的关键技术和方法。介绍了仿真系统的建模工具V isua l C++和O penGL。最后指出了本文研究对于STEP-NC数控加工研究的意义。展开更多
基金National Natural Science Foundation of China(No.51405403)the Fundamental Research Funds for the Central Universities,China(No.2682014BR019)the Scientific Research Program of Education Bureau of Sichuan Province,China(No.12ZB322)
文摘Production scheduling has a major impact on the productivity of the manufacturing process. Recently, scheduling problems with deteriorating jobs have attracted increasing attentions from researchers. In many practical situations,it is found that some jobs fail to be processed prior to the pre-specified thresholds,and they often consume extra deteriorating time for successful accomplishment. Their processing times can be characterized by a step-wise function. Such kinds of jobs are called step-deteriorating jobs. In this paper,parallel machine scheduling problem with stepdeteriorating jobs( PMSD) is considered. Due to its intractability,four different mixed integer programming( MIP) models are formulated for solving the problem under consideration. The study aims to investigate the performance of these models and find promising optimization formulation to solve the largest possible problem instances. The proposed four models are solved by commercial software CPLEX. Moreover,the near-optimal solutions can be obtained by black-box local-search solver LocalS olver with the fourth one. The computational results show that the efficiencies of different MIP models depend on the distribution intervals of deteriorating thresholds, and the performance of LocalS olver is clearly better than that of CPLEX in terms of the quality of the solutions and the computational time.
文摘提出了一种基于STEP-NC的数控车削加工仿真系统,该仿真系统能够验证STEP-NC数控程序、模拟实际系统运行。讨论了仿真系统的译码器、基于特征的加工数据库、实体建模以及仿真驱动等组成模块实现的关键技术和方法。介绍了仿真系统的建模工具V isua l C++和O penGL。最后指出了本文研究对于STEP-NC数控加工研究的意义。