On April 25, the Hainan Changjiang nuclear power project, jointly invested by China National Nuclear Corporation (CNNC) and China Huaneng Group with 51% and 49% shares, respectively, formally
The construction quality and efficiency of construction engineering are directly related to people's daily life.Therefore,construction enterprises must keep pace with the times and actively introduce advanced tech...The construction quality and efficiency of construction engineering are directly related to people's daily life.Therefore,construction enterprises must keep pace with the times and actively introduce advanced technical means into architectural design,project construction,and management,so as to ensure the quality and safety of construction to the maximum extent.The application of BIM not only improves the efficiency of construction and construction quality,but also realizes the control of construction cost.This study explores and analyzes the advantages of BIM as well as proposes application strategies of BIM in architectural design,project construction,and management,hoping to contribute to the smooth construction of construction engineering.展开更多
Qinshan Phase Ⅲ(PHWR)Nuclear Power Plant,the first commercial heavy water reactor nuclear power plant in China,was the biggest trade project performed between the governments of China and Canada.As the owner,the Thir...Qinshan Phase Ⅲ(PHWR)Nuclear Power Plant,the first commercial heavy water reactor nuclear power plant in China,was the biggest trade project performed between the governments of China and Canada.As the owner,the Third Qinshan Nuclear Power Company(TQNPC)persisted in independent innovation management during the project construction,commissioning and self-dependent operation,efficiently realizing the three controls of the project,i.e.quality control,schedule control and investment control,and persisted in technical improvement on the basis of digestion and absorption of CANDU-6 technology to improve the unit safety and reliability.The project construction practice has helped China's nuclear power project management to becomeprogrammed,computerized,standardized and internationalized management from the existing basis.After completion of the project,with unit safe and steady operation as the prerequisite,TQNPC performed several technical modifications and innovations to continuously improve the unit performance.In the area of staff development,TQNPC paid much attention to cultivation of corporate culture,strengthed staff training and built up a good circulating mechanism with staff training and project construction promoting each other.Further to "Zero Breakthrough" and a new step forward of locolization successfully realized in Qinshan Nuclear Power Plant and Nuclear Power Qinshan Joint Venture Company,the improvement and developemnt of nuclear power project management level in Qinshan Phase Ⅲ(PHWR)Nuclear Power Plant provided reference for promotion of nuclear power development in China and standardized management of introducing large imported project.展开更多
Construction project cost control involves many complex contents,forming a large amount of data information.If the processing method is unreasonable,it will likely affect the cost control efficiency.Therefore,in the c...Construction project cost control involves many complex contents,forming a large amount of data information.If the processing method is unreasonable,it will likely affect the cost control efficiency.Therefore,in the current construction project management,the review of project cost budget settlement is the focus to solve the cost management problems of construction projects and promote the development of the construction industry.This article mainly analyzes the influencing factors and current situation of construction project cost budget settlement review,and based on this,it explores the project cost budget settlement review strategy to promote the healthy development of construction project cost work.展开更多
The financial aspects of large-scale engineering construction projects profoundly influence their success.Strengthening cost control and establishing a scientific financial evaluation system can enhance the project’s...The financial aspects of large-scale engineering construction projects profoundly influence their success.Strengthening cost control and establishing a scientific financial evaluation system can enhance the project’s economic benefits,minimize unnecessary costs,and provide decision-makers with a robust financial foundation.Additionally,implementing an effective cash flow control mechanism and conducting a comprehensive assessment of potential project risks can ensure financial stability and mitigate the risk of fund shortages.Developing a practical and feasible fundraising plan,along with stringent fund management practices,can prevent fund wastage and optimize fund utilization efficiency.These measures not only facilitate smooth project progression and improve project management efficiency but also enhance the project’s economic and social outcomes.展开更多
Using the improved prospect theory with the linear transformations of rewarding good and punishing bad(RGPBIT),a new investment ranking model for power grid construction projects(PGCPs)is proposed.Given the uncertaint...Using the improved prospect theory with the linear transformations of rewarding good and punishing bad(RGPBIT),a new investment ranking model for power grid construction projects(PGCPs)is proposed.Given the uncertainty of each index value under the market environment,fuzzy numbers are used to describe qualitative indicators and interval numbers are used to describe quantitative ones.Taking into account decision-maker’s subjective risk attitudes,a multi-criteria decision-making(MCDM)method based on improved prospect theory is proposed.First,the[−1,1]RGPBIT operator is proposed to normalize the original data,to obtain the best andworst schemes of PGCPs.Furthermore,the correlation coefficients between interval/fuzzy numbers and the best/worst schemes are defined and introduced to the prospect theory to improve its value function and loss function,and the positive and negative prospect value matrices of the project are obtained.Then,the optimization model with the maximum comprehensive prospect value is constructed,the optimal attribute weight is determined,and the PGCPs are ranked accordingly.Taking four PGCPs of the IEEERTS-79 node system as examples,an illustration of the feasibility and effectiveness of the proposed method is provided.展开更多
Construction delay is a widespread issue in the construction industry of developing countries, and Nepal is no exception. These delays extend project durations and lead to cost overruns and disputes among stakeholders...Construction delay is a widespread issue in the construction industry of developing countries, and Nepal is no exception. These delays extend project durations and lead to cost overruns and disputes among stakeholders. To address this problem, this study aimed to identify and analyze the significant factors that contribute to construction project delays in Nepal. To gather data, a well-structured questionnaire was developed and administered to a sample of 100 participants, including contractors, consultants, and civil engineers. Various statistical tests were conducted to ensure the data’s integrity and consistency, such as reliability assessments and factor analyses. The findings of the study highlighted multiple factors contributing to delays in construction projects such as inadequate design, poor communication, and coordination among stakeholders, insufficient experience and planning by contractors, delays in material delivery and testing, labor-related problems including shortages and low qualifications, and external factors like regulatory changes and unforeseen circumstances. By identifying these major causes of construction project delays, this study presented insightful information that can contribute to the analysis and evaluation of project performance.展开更多
Construction projects,including road construction,are very important.Therefore,a lot of money is spent on these projects every year.So,the lack of proper planning will increase the cost and cause irreparable damage to...Construction projects,including road construction,are very important.Therefore,a lot of money is spent on these projects every year.So,the lack of proper planning will increase the cost and cause irreparable damage to the country.The role of workshop management is one of the most important factors in increasing the cost of these types of projects.Generally,workshop management plays a very important role in improving the quality and quantity of projects and has an important place in the project implementation process.Therefore,this study evaluated the impact of workshop management on the progress of road construction projects on a case-by-case basis in road construction projects in Tehran province.According to the purpose of the research,this study was a descriptive-survey type.In addition,the tool used in this research was a questionnaire.The statistical population of this research included all experts and specialists in road construction projects,among whom 65 people were selected by snowball method.Then the collected data were analyzed using SPSS software.The results of this study showed that the management of the workshop and its role in the control and implementation of projects is a complex process,which can be implemented at high levels and effectively by combining scientific and experimental training.And a very important point in the discussion of workshop management is applying scientific management to the use of valuable experiences from others.Because management knowledge not only does not negate the use of these experiences,but also emphasizes the necessity of using them.In other words,improving the knowledge of workshop management is one of the requirements for the implementation of value engineering in construction projects,especially road construction,and it is very important.展开更多
China’s economy has been developing rapidly in recent years,leading to an acceleration of urbanization,which in turn caused the number of construction projects in various regions to increase significantly.Archives ar...China’s economy has been developing rapidly in recent years,leading to an acceleration of urbanization,which in turn caused the number of construction projects in various regions to increase significantly.Archives are important information for construction projects.The quality of archives management can have a great impact on the quality and economic benefits of construction projects.For this reason,it is necessary to increase the emphasis on archives management of construction projects and take effective management measures.This article introduces the concept of construction project archives,highlights the significance of effective management in construction project archives,and examines prevalent issues along with practical measures to enhance construction project archives management,with the goal of offering valuable insights for archive managers.展开更多
With the development and progress of economic construction and market economy,urban construction is also developing rapidly.In the field of construction engineering,a large number of construction engineering files are...With the development and progress of economic construction and market economy,urban construction is also developing rapidly.In the field of construction engineering,a large number of construction engineering files are constantly being produced and accumulated.Therefore,the role of file management is becoming more and more important.The archives are the true records of the whole process of project construction,including the information on the whole process from project design to completion,and are also the main basis for operation management after project delivery.However,there are many aspects to construction project archives,and there are many problems.Nowadays,the classification and preservation of archives are receiving more and more attention.In this article,the origin and development history of construction project archives is first expounded,and its attributes and importance are analyzed.Secondly,the differences between ancient and modern archives management are compared,and at the same time suggestions on improving the archives’traceability system,strengthening the use of archives,and establishing and improving archives management are given.In this paper,we summarize the problems in archives sorting and put forward specific solutions to improve the standardization and systematic management of archives work and enhance the authenticity and integrity of construction project archives.展开更多
The importance and complexity of prioritizing construction projects (PCP) in urban road network planning lead to the necessity to develop an aided decision making program (ADMP). Cost benefit ratio model and stage rol...The importance and complexity of prioritizing construction projects (PCP) in urban road network planning lead to the necessity to develop an aided decision making program (ADMP). Cost benefit ratio model and stage rolled method are chosen as the theoretical foundations of the program, and then benefit model is improved to accord with the actuality of urban traffic in China. Consequently, program flows, module functions and data structures are designed, and particularly an original data structure of road ...展开更多
Sustainable performance is expected to become a major factor when examining the feasibility of a construction project in terms of its life cycle performance. The study on which this paper is based developed a simulati...Sustainable performance is expected to become a major factor when examining the feasibility of a construction project in terms of its life cycle performance. The study on which this paper is based developed a simulation model, using system dy- namics methodology, to assess the sustainable performance of projects. Three major factors are used to examine project sus- tainable performance (PSP): the sustainability of economic development (E), the sustainability of social development (S), and the sustainability of environmental development (En). Sustainable development ability (SDA) was used as a prototype to evaluate the degree of sustainable performance. The simulation software ‘ithink’ was used to help with the application of the model to a real life case. This paper explains and demonstrates the procedures used to develop the model and finally offers an approach for assessing the feasibility of a construction project in terms of its sustainable performance.展开更多
Project cost can control the input in construction project and improve economic benefits of construction enterprises,so it is an important section of construction engineering.Reasonable control and management of proje...Project cost can control the input in construction project and improve economic benefits of construction enterprises,so it is an important section of construction engineering.Reasonable control and management of project cost is the principle that building units must obey in the whole process of project,particularly in the construction stage,so it is extremely important to control and manage the project cost.This paper first analyzed possible causes for the unreasonable cost of construction projects,and put forward pertinent strategies for the control and management of construction project cost.展开更多
In recent years, in Vietnam, economy has been developing rapidly. To ensure rapid and sustainable economic growth, strong support from the energy sector is required. Governments in Vietnam have invested in numerous hy...In recent years, in Vietnam, economy has been developing rapidly. To ensure rapid and sustainable economic growth, strong support from the energy sector is required. Governments in Vietnam have invested in numerous hydropower projects, many of which employ the EPC (Engineering, Procurement and Construction) contract. However, the EPC general contractors are facing many difficulties, resulting in schedule delays and considerable losses. This research is conducted to highlight the main risk factors in the delays of hydropower construction projects in Vietnam. The research employs the method of statistical calculations and risk analysis to obtain feedback from experts participating in similar projects. The research outcomes are as follows: identifying the risks that can cause delays in EPC hydroelectric construction projects in Vietnam;calculating and classifying the degree of impact of each risk to the progress of the construction. The practical significance of this study is to ensure the timely completion of projects, benefits for the investors, and the EPC general contractors.展开更多
The Duifene teaching platform is a product of various teaching methods,which greatly improves the traditional teaching method.This article introduces the function and characteristics of a blended teaching platform as ...The Duifene teaching platform is a product of various teaching methods,which greatly improves the traditional teaching method.This article introduces the function and characteristics of a blended teaching platform as well as its application for histology and embryology modules.In addition,the advantages and disadvantages of blended teaching method is also discussed.The application of this teaching platform for Construction Project Management modules encourages students to be more enthusiastic and interested toward learning.This allows a more convenient and rapid teacher-student and student-student interaction thereby improving the teaching and learning experiences.展开更多
The process of engaging private sector in the provision of public infrastructure can improve economic value in service delivery and enable the government to utilize the capabilities and expertise held by private secto...The process of engaging private sector in the provision of public infrastructure can improve economic value in service delivery and enable the government to utilize the capabilities and expertise held by private sector. This has a positive impact on the public in terms of improving their well-being. This literature review attempts to compare the challenges encountered in implementation of PPP projects across the world, with a view to determining cross cutting challenges and recommendations for developing countries. A literature review was conducted for empirical studies focusing on construction projects. The studies are reviewed by analyzing the methodology used and conclusions made to identify the geographical study area, Public Private Partnership project financing model, emerging challenges and recommendation for future project management. The literature search was based on four keywords: construction projects, completion of construction projects, public private partnership, challenges in construction projects. Thus, a total of 11 empirical studies were identified for review in Europe, Asia and Africa. The review revealed that most risk factors affecting project completion can be categorized as human and organizational factors and unknown geotechnical conditions that were not known beforehand. Specifically, project owners’ interference was also attributable to delays with the delays having significant implications for project execution. Risks have great impact on the performance of construction projects because they affect their quality, time and cost. The general remedy to such potential risk factors is adoption of reliable prediction mechanisms which would estimate those factors using a probabilistic model that does not rely on expert judgments as they tend to be unreliable.展开更多
Whether the breakdown structure and coding system of construction projects are reasonable or not determines to a large degree the performance level of the entire project management. We analyze in detail the similariti...Whether the breakdown structure and coding system of construction projects are reasonable or not determines to a large degree the performance level of the entire project management. We analyze in detail the similarities and differences of two kinds of decomposing methods classified by type of work and construction elements based on the discussion of international typical coding standards system designing. We then deduce the differential coefficient relation between project breakdown structure (PBS) and work breakdown structure (WBS). At the same time we constitute a comprehensive construction project breakdown system including element code and type of work code and make a further schematic presentation of the implementation of the system’s functions.展开更多
To treat the relationship between project construction and ecological environment and effectively prevent new soil erosion during the construction, according to the project layout, soil erosion distribution as well as...To treat the relationship between project construction and ecological environment and effectively prevent new soil erosion during the construction, according to the project layout, soil erosion distribution as well as natural and socio-economic conditions, the control measures of newly increased soil erosion along the project were carried out based on site survey and analysis of relevant information. In addition, adhering to the prin- ciple of partition prevention and treatment, some guiding prevention and control measures of the natural zone passed by the project and soil erosion control district were determined, which provided scientific references and technical support for the rational layout of water and soil conservation and ecological restoration measures in Dina 2 gas field.展开更多
文摘On April 25, the Hainan Changjiang nuclear power project, jointly invested by China National Nuclear Corporation (CNNC) and China Huaneng Group with 51% and 49% shares, respectively, formally
文摘The construction quality and efficiency of construction engineering are directly related to people's daily life.Therefore,construction enterprises must keep pace with the times and actively introduce advanced technical means into architectural design,project construction,and management,so as to ensure the quality and safety of construction to the maximum extent.The application of BIM not only improves the efficiency of construction and construction quality,but also realizes the control of construction cost.This study explores and analyzes the advantages of BIM as well as proposes application strategies of BIM in architectural design,project construction,and management,hoping to contribute to the smooth construction of construction engineering.
文摘Qinshan Phase Ⅲ(PHWR)Nuclear Power Plant,the first commercial heavy water reactor nuclear power plant in China,was the biggest trade project performed between the governments of China and Canada.As the owner,the Third Qinshan Nuclear Power Company(TQNPC)persisted in independent innovation management during the project construction,commissioning and self-dependent operation,efficiently realizing the three controls of the project,i.e.quality control,schedule control and investment control,and persisted in technical improvement on the basis of digestion and absorption of CANDU-6 technology to improve the unit safety and reliability.The project construction practice has helped China's nuclear power project management to becomeprogrammed,computerized,standardized and internationalized management from the existing basis.After completion of the project,with unit safe and steady operation as the prerequisite,TQNPC performed several technical modifications and innovations to continuously improve the unit performance.In the area of staff development,TQNPC paid much attention to cultivation of corporate culture,strengthed staff training and built up a good circulating mechanism with staff training and project construction promoting each other.Further to "Zero Breakthrough" and a new step forward of locolization successfully realized in Qinshan Nuclear Power Plant and Nuclear Power Qinshan Joint Venture Company,the improvement and developemnt of nuclear power project management level in Qinshan Phase Ⅲ(PHWR)Nuclear Power Plant provided reference for promotion of nuclear power development in China and standardized management of introducing large imported project.
文摘Construction project cost control involves many complex contents,forming a large amount of data information.If the processing method is unreasonable,it will likely affect the cost control efficiency.Therefore,in the current construction project management,the review of project cost budget settlement is the focus to solve the cost management problems of construction projects and promote the development of the construction industry.This article mainly analyzes the influencing factors and current situation of construction project cost budget settlement review,and based on this,it explores the project cost budget settlement review strategy to promote the healthy development of construction project cost work.
文摘The financial aspects of large-scale engineering construction projects profoundly influence their success.Strengthening cost control and establishing a scientific financial evaluation system can enhance the project’s economic benefits,minimize unnecessary costs,and provide decision-makers with a robust financial foundation.Additionally,implementing an effective cash flow control mechanism and conducting a comprehensive assessment of potential project risks can ensure financial stability and mitigate the risk of fund shortages.Developing a practical and feasible fundraising plan,along with stringent fund management practices,can prevent fund wastage and optimize fund utilization efficiency.These measures not only facilitate smooth project progression and improve project management efficiency but also enhance the project’s economic and social outcomes.
文摘Using the improved prospect theory with the linear transformations of rewarding good and punishing bad(RGPBIT),a new investment ranking model for power grid construction projects(PGCPs)is proposed.Given the uncertainty of each index value under the market environment,fuzzy numbers are used to describe qualitative indicators and interval numbers are used to describe quantitative ones.Taking into account decision-maker’s subjective risk attitudes,a multi-criteria decision-making(MCDM)method based on improved prospect theory is proposed.First,the[−1,1]RGPBIT operator is proposed to normalize the original data,to obtain the best andworst schemes of PGCPs.Furthermore,the correlation coefficients between interval/fuzzy numbers and the best/worst schemes are defined and introduced to the prospect theory to improve its value function and loss function,and the positive and negative prospect value matrices of the project are obtained.Then,the optimization model with the maximum comprehensive prospect value is constructed,the optimal attribute weight is determined,and the PGCPs are ranked accordingly.Taking four PGCPs of the IEEERTS-79 node system as examples,an illustration of the feasibility and effectiveness of the proposed method is provided.
文摘Construction delay is a widespread issue in the construction industry of developing countries, and Nepal is no exception. These delays extend project durations and lead to cost overruns and disputes among stakeholders. To address this problem, this study aimed to identify and analyze the significant factors that contribute to construction project delays in Nepal. To gather data, a well-structured questionnaire was developed and administered to a sample of 100 participants, including contractors, consultants, and civil engineers. Various statistical tests were conducted to ensure the data’s integrity and consistency, such as reliability assessments and factor analyses. The findings of the study highlighted multiple factors contributing to delays in construction projects such as inadequate design, poor communication, and coordination among stakeholders, insufficient experience and planning by contractors, delays in material delivery and testing, labor-related problems including shortages and low qualifications, and external factors like regulatory changes and unforeseen circumstances. By identifying these major causes of construction project delays, this study presented insightful information that can contribute to the analysis and evaluation of project performance.
文摘Construction projects,including road construction,are very important.Therefore,a lot of money is spent on these projects every year.So,the lack of proper planning will increase the cost and cause irreparable damage to the country.The role of workshop management is one of the most important factors in increasing the cost of these types of projects.Generally,workshop management plays a very important role in improving the quality and quantity of projects and has an important place in the project implementation process.Therefore,this study evaluated the impact of workshop management on the progress of road construction projects on a case-by-case basis in road construction projects in Tehran province.According to the purpose of the research,this study was a descriptive-survey type.In addition,the tool used in this research was a questionnaire.The statistical population of this research included all experts and specialists in road construction projects,among whom 65 people were selected by snowball method.Then the collected data were analyzed using SPSS software.The results of this study showed that the management of the workshop and its role in the control and implementation of projects is a complex process,which can be implemented at high levels and effectively by combining scientific and experimental training.And a very important point in the discussion of workshop management is applying scientific management to the use of valuable experiences from others.Because management knowledge not only does not negate the use of these experiences,but also emphasizes the necessity of using them.In other words,improving the knowledge of workshop management is one of the requirements for the implementation of value engineering in construction projects,especially road construction,and it is very important.
文摘China’s economy has been developing rapidly in recent years,leading to an acceleration of urbanization,which in turn caused the number of construction projects in various regions to increase significantly.Archives are important information for construction projects.The quality of archives management can have a great impact on the quality and economic benefits of construction projects.For this reason,it is necessary to increase the emphasis on archives management of construction projects and take effective management measures.This article introduces the concept of construction project archives,highlights the significance of effective management in construction project archives,and examines prevalent issues along with practical measures to enhance construction project archives management,with the goal of offering valuable insights for archive managers.
文摘With the development and progress of economic construction and market economy,urban construction is also developing rapidly.In the field of construction engineering,a large number of construction engineering files are constantly being produced and accumulated.Therefore,the role of file management is becoming more and more important.The archives are the true records of the whole process of project construction,including the information on the whole process from project design to completion,and are also the main basis for operation management after project delivery.However,there are many aspects to construction project archives,and there are many problems.Nowadays,the classification and preservation of archives are receiving more and more attention.In this article,the origin and development history of construction project archives is first expounded,and its attributes and importance are analyzed.Secondly,the differences between ancient and modern archives management are compared,and at the same time suggestions on improving the archives’traceability system,strengthening the use of archives,and establishing and improving archives management are given.In this paper,we summarize the problems in archives sorting and put forward specific solutions to improve the standardization and systematic management of archives work and enhance the authenticity and integrity of construction project archives.
文摘The importance and complexity of prioritizing construction projects (PCP) in urban road network planning lead to the necessity to develop an aided decision making program (ADMP). Cost benefit ratio model and stage rolled method are chosen as the theoretical foundations of the program, and then benefit model is improved to accord with the actuality of urban traffic in China. Consequently, program flows, module functions and data structures are designed, and particularly an original data structure of road ...
基金Project supported by the Research Grant Council of Hong Kong,China
文摘Sustainable performance is expected to become a major factor when examining the feasibility of a construction project in terms of its life cycle performance. The study on which this paper is based developed a simulation model, using system dy- namics methodology, to assess the sustainable performance of projects. Three major factors are used to examine project sus- tainable performance (PSP): the sustainability of economic development (E), the sustainability of social development (S), and the sustainability of environmental development (En). Sustainable development ability (SDA) was used as a prototype to evaluate the degree of sustainable performance. The simulation software ‘ithink’ was used to help with the application of the model to a real life case. This paper explains and demonstrates the procedures used to develop the model and finally offers an approach for assessing the feasibility of a construction project in terms of its sustainable performance.
文摘Project cost can control the input in construction project and improve economic benefits of construction enterprises,so it is an important section of construction engineering.Reasonable control and management of project cost is the principle that building units must obey in the whole process of project,particularly in the construction stage,so it is extremely important to control and manage the project cost.This paper first analyzed possible causes for the unreasonable cost of construction projects,and put forward pertinent strategies for the control and management of construction project cost.
文摘In recent years, in Vietnam, economy has been developing rapidly. To ensure rapid and sustainable economic growth, strong support from the energy sector is required. Governments in Vietnam have invested in numerous hydropower projects, many of which employ the EPC (Engineering, Procurement and Construction) contract. However, the EPC general contractors are facing many difficulties, resulting in schedule delays and considerable losses. This research is conducted to highlight the main risk factors in the delays of hydropower construction projects in Vietnam. The research employs the method of statistical calculations and risk analysis to obtain feedback from experts participating in similar projects. The research outcomes are as follows: identifying the risks that can cause delays in EPC hydroelectric construction projects in Vietnam;calculating and classifying the degree of impact of each risk to the progress of the construction. The practical significance of this study is to ensure the timely completion of projects, benefits for the investors, and the EPC general contractors.
基金Chongqing Higher Education Teaching Reform Research Project Application Research of Blending Teaching based on Duifene Teaching Platform 203195.Chongqing Higher Vocational and Technical Education Research Association.Mobile phones in the classroom:a practical study on building a 1:1 digital teaching model GY201084.
文摘The Duifene teaching platform is a product of various teaching methods,which greatly improves the traditional teaching method.This article introduces the function and characteristics of a blended teaching platform as well as its application for histology and embryology modules.In addition,the advantages and disadvantages of blended teaching method is also discussed.The application of this teaching platform for Construction Project Management modules encourages students to be more enthusiastic and interested toward learning.This allows a more convenient and rapid teacher-student and student-student interaction thereby improving the teaching and learning experiences.
文摘The process of engaging private sector in the provision of public infrastructure can improve economic value in service delivery and enable the government to utilize the capabilities and expertise held by private sector. This has a positive impact on the public in terms of improving their well-being. This literature review attempts to compare the challenges encountered in implementation of PPP projects across the world, with a view to determining cross cutting challenges and recommendations for developing countries. A literature review was conducted for empirical studies focusing on construction projects. The studies are reviewed by analyzing the methodology used and conclusions made to identify the geographical study area, Public Private Partnership project financing model, emerging challenges and recommendation for future project management. The literature search was based on four keywords: construction projects, completion of construction projects, public private partnership, challenges in construction projects. Thus, a total of 11 empirical studies were identified for review in Europe, Asia and Africa. The review revealed that most risk factors affecting project completion can be categorized as human and organizational factors and unknown geotechnical conditions that were not known beforehand. Specifically, project owners’ interference was also attributable to delays with the delays having significant implications for project execution. Risks have great impact on the performance of construction projects because they affect their quality, time and cost. The general remedy to such potential risk factors is adoption of reliable prediction mechanisms which would estimate those factors using a probabilistic model that does not rely on expert judgments as they tend to be unreliable.
文摘Whether the breakdown structure and coding system of construction projects are reasonable or not determines to a large degree the performance level of the entire project management. We analyze in detail the similarities and differences of two kinds of decomposing methods classified by type of work and construction elements based on the discussion of international typical coding standards system designing. We then deduce the differential coefficient relation between project breakdown structure (PBS) and work breakdown structure (WBS). At the same time we constitute a comprehensive construction project breakdown system including element code and type of work code and make a further schematic presentation of the implementation of the system’s functions.
文摘To treat the relationship between project construction and ecological environment and effectively prevent new soil erosion during the construction, according to the project layout, soil erosion distribution as well as natural and socio-economic conditions, the control measures of newly increased soil erosion along the project were carried out based on site survey and analysis of relevant information. In addition, adhering to the prin- ciple of partition prevention and treatment, some guiding prevention and control measures of the natural zone passed by the project and soil erosion control district were determined, which provided scientific references and technical support for the rational layout of water and soil conservation and ecological restoration measures in Dina 2 gas field.