期刊文献+
共找到7篇文章
< 1 >
每页显示 20 50 100
Control and Management of Construction Project Cost 被引量:1
1
作者 ZHU Lili 《Journal of Landscape Research》 2016年第4期7-8,共2页
Project cost can control the input in construction project and improve economic benefits of construction enterprises,so it is an important section of construction engineering.Reasonable control and management of proje... Project cost can control the input in construction project and improve economic benefits of construction enterprises,so it is an important section of construction engineering.Reasonable control and management of project cost is the principle that building units must obey in the whole process of project,particularly in the construction stage,so it is extremely important to control and manage the project cost.This paper first analyzed possible causes for the unreasonable cost of construction projects,and put forward pertinent strategies for the control and management of construction project cost. 展开更多
关键词 Construction project Construction stage project cost Control and management
下载PDF
Research on the Development of Project Cost Informatization in the Era of Big Data
2
作者 Huiyu Long Yan Ma +1 位作者 Xiang Mao Xinyuerong Sun 《Journal on Big Data》 2020年第2期63-70,共8页
Under the background of big data,Informatization plays an important role in the development of the engineering cost industry.The rapid development of the industry and the increasing complexity of construction projects... Under the background of big data,Informatization plays an important role in the development of the engineering cost industry.The rapid development of the industry and the increasing complexity of construction projects require higher standards of informatization.The current information processing methods and models have been difficultly to meet new requirements.Based on this,this study deeply analyzes the key factors that impede the informatization of engineering cost development,and tries to find corresponding solutions through theoretical analysis and empirical research to break these constraints.This will play a guiding role in the development of informatization in China's engineering cost industry. 展开更多
关键词 Big data project cost engineering costs cost informatization
下载PDF
Lower Project Cost,Shorten Construction Schedule and Promote Market Competition of Fossil Power Plants
3
《Electricity》 1999年第3期23-27,共5页
关键词 project Lower project Cost Shorten Construction Schedule and Promote Market Competition of Fossil Power Plants
下载PDF
Exploring the Digital Talent Training Mode of Project Cost Specialty in Higher Vocational Colleges
4
作者 Li Song 《Journal of Architectural Research and Development》 2022年第2期22-25,共4页
Project construction,design,management,operation,and maintenance are all undergoing digital transformations,and project cost professionals’working mode and content will change as a result.This paper reviews the exist... Project construction,design,management,operation,and maintenance are all undergoing digital transformations,and project cost professionals’working mode and content will change as a result.This paper reviews the existing challenges in traditional talent training and adjusts training ideas as well as training modes to conform to the industry’s digital transformation trend as a training base for project cost talents. 展开更多
关键词 DIGITIZATION Talent training project cost specialty Higher vocational college
下载PDF
The Project Cost Control of China Thermal Power Project
5
作者 Lei Xueqin(Techno-economic Department, CPECC) 《Electricity》 1999年第2期41-43,共3页
关键词 The project Cost Control of China Thermal Power project
下载PDF
Prediction model for cost data of a power transmission and transformation project based on Pearson correlation coefficient-IPSO-ELM
6
作者 Ju Xin Liu ShangKe +1 位作者 Xiao YanLi Wan Ye 《Clean Energy》 EI 2021年第4期756-764,共9页
In view of the difficulty in predicting the cost data of power transmission and transformation projects at present,a method based on Pearson correlation coefficient-improved particle swarm optimization(IPSO)-extreme l... In view of the difficulty in predicting the cost data of power transmission and transformation projects at present,a method based on Pearson correlation coefficient-improved particle swarm optimization(IPSO)-extreme learning machine(ELM)is proposed.In this paper,the Pearson correlation coefficient is used to screen out the main influencing factors as the input-independent variables of the ELM algorithm and IPSO based on a ladder-structure coding method is used to optimize the number of hidden-layer nodes,input weights and bias values of the ELM.Therefore,the prediction model for the cost data of power transmission and transformation projects based on the Pearson correlation coefficient-IPSO-ELM algorithm is constructed.Through the analysis of calculation examples,it is proved that the prediction accuracy of the proposed method is higher than that of other algorithms,which verifies the effectiveness of the model. 展开更多
关键词 cost data of power transmission and transformation project Pearson correlation coefficient IPSO-ELM algorithm project-cost prediction
原文传递
Optimization design of anti-seismic engineering measures for intake tower based on non-dominated sorting genetic algorithm-Ⅱ
7
作者 Jia’ao YU Zhenzhong SHEN +1 位作者 Zhangxin HUANG Haoxuan LI 《Frontiers of Structural and Civil Engineering》 SCIE EI CSCD 2023年第9期1428-1441,共14页
High-rise intake towers in high-intensity seismic areas are prone to structural safety problems under vibration.Therefore,effective and low-cost anti-seismic engineering measures must be designed for protection.An int... High-rise intake towers in high-intensity seismic areas are prone to structural safety problems under vibration.Therefore,effective and low-cost anti-seismic engineering measures must be designed for protection.An intake tower in northwest China was considered the research object,and its natural vibration characteristics and dynamic response were first analyzed using the mode decomposition response spectrum method based on a three-dimensional finite element model.The non-dominated sorting genetic algorithm-II(NSGA-II)was adopted to optimize the anti-seismic scheme combination by comprehensively considering the dynamic tower response and variable project cost.Finally,the rationality of the original intake tower antiseismic design scheme was evaluated according to the obtained optimal solution set,and recommendations for improvement were proposed.The method adopted in this study may provide significant references for designing anti-seismic measures for high-rise structures such as intake towers located in high-intensity earthquake areas. 展开更多
关键词 intake tower NSGA-II mode decomposition response spectrum method anti-seismic engineering measures optimization design variable project cost
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部