期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Study on Ways to Improve Economic Benefits by Strengthening Cost Management
1
作者 Zhu Hongchang 《China's Foreign Trade》 2011年第7期68-70,共3页
Engineering project management refers to the management through the whole process of engineering construction, including quality, time project time limit, safety, cost, environmental protection, and innovation, etc. T... Engineering project management refers to the management through the whole process of engineering construction, including quality, time project time limit, safety, cost, environmental protection, and innovation, etc. The most important thing for construction enterprises to improve market competitiveness is to reduce enterprise costs by decreasing resource consumption in the construction, and control the consumptions within the project budget. 展开更多
关键词 cost management engineering project management cost control risk control ways tocontrol
下载PDF
Engineering Projects Real-Time Supervision Mechanism Based on Grid Management
2
作者 乌云娜 董鹤云 +1 位作者 张昊渤 张金颖 《Journal of Shanghai Jiaotong university(Science)》 EI 2014年第4期502-507,共6页
This paper proposes an innovative supervision method that can provide project supervisors with realtime supervision of engineering projects and contractor activity. To obtain real-time and comprehensive state of proje... This paper proposes an innovative supervision method that can provide project supervisors with realtime supervision of engineering projects and contractor activity. To obtain real-time and comprehensive state of project, we use grid management to divide the project supervision grid in three levels: stage, objective, and milestone. Then, a detailed supervision mechanism is designed to help supervisors measure the project situation in real time. This mechanism checks that if the project objectives(such as schedule, cost, quality, and safety) in every supervision grid cell are under the healthy limits, any project deviation can be identified as soon as possible.A schedule objective is selected as an example to illustrate the method used to calculate the healthy limit. 展开更多
关键词 real-time supervision grid management healthy limit engineering project management
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部