In order to realize the standardization and normalization of environmental protection project management.This paper uses the literature method to study the current status of the existing project management mode,and po...In order to realize the standardization and normalization of environmental protection project management.This paper uses the literature method to study the current status of the existing project management mode,and points out the problems:lack of a sound project management system,insufficient information application of project management,and unclear decentralization in project management;on this basis,this paper proposes optimization strategies from the aspects of perfecting the engineering project management system,clarifying the allocation of project management authority,and strengthening the construction of engineering project management information.And put forward the future development trend of project engineering management,on the basis of two mainstream management modes of BOT(Build-Operate-Transfer)and EPC(Engineering Procurement Construction),build a standardized project management platform to achieve intelligent management.Realize intelligent management of engineering project management to achieve standardization and standardization,greatly improving the efficiency of project management.展开更多
Currently,the investment of oil and gas industry is still facing an unfavorable environment,in which,instable factors,such as financial crisis,terrorist,religious conflicts and rigorous environmental regulations,keep ...Currently,the investment of oil and gas industry is still facing an unfavorable environment,in which,instable factors,such as financial crisis,terrorist,religious conflicts and rigorous environmental regulations,keep mucking up the business all around the world.Meanwhile,China’s rapid energy consumption growth boosted by a booming economy has put the country to rely heavily on exported oil.It is therefore extremely urgent to expand and diversify petroleum supply channel in consideration of the country’s energy security.As the world’s economy has been slowly recovering from the slump and展开更多
Under the background of rapid social and economic development,the traffic volume of highways has increased,which has brought tremendous pressure to the old highways.In response to this situation,the original highway m...Under the background of rapid social and economic development,the traffic volume of highways has increased,which has brought tremendous pressure to the old highways.In response to this situation,the original highway must be reconstructed and extended.It is necessary to focus on the analysis and exploration of the methods of interchange reconstruction and extension in current highway reconstruction and extension to avoid affecting normal traffic,as it will inevitably have an impact on the traffic operation environment.For this situation,it is necessary to analyze and understand the format and characteristics of traffic organization of the interchange operation area in time and propose corresponding safeguard measures.展开更多
In today’s era,with the increase in the number of enterprise innovations,enterprises must adopt project portfolio management for various innovations,select alternative projects from the perspective of enterprise stra...In today’s era,with the increase in the number of enterprise innovations,enterprises must adopt project portfolio management for various innovations,select alternative projects from the perspective of enterprise strategy.This paper primarily explores the use of project portfolio management in enterprise project management,hoping to improve the quality of enterprise project management and the utilization efficiency of project portfolio management in enterprise project management.展开更多
The strategic management of large projects is both theoretically and practically important. Some scholars have advanced flexible strategy theory in China. The difference of strategic flexibility and flexible strategy ...The strategic management of large projects is both theoretically and practically important. Some scholars have advanced flexible strategy theory in China. The difference of strategic flexibility and flexible strategy is pointed out. The supporting system and characteristics of flexible strategy are analyzed. The changes of flexible strategy and integration of strategic management are discussed.展开更多
The Construction project green risks (CPGRs) refer to those threats to environment, energy sources and material re-sources during the entire life-cycle of a construction project. The emergent green risks in exploiting...The Construction project green risks (CPGRs) refer to those threats to environment, energy sources and material re-sources during the entire life-cycle of a construction project. The emergent green risks in exploiting these resources are of varying concern to all. In this paper, evolutionary game is introduced to make about impacts of strategy choices from interactions among the choices developers, and between the choices developers and EPDs on project green risk. The results show that CPGRs will occur if either developers find that not managing CPGRs has a better payoff than opting for CPGR management, or if monitors impose only mild fines even when they find CPGRs within construction projects of developer’s firms. The study also shows that there is a prohibitively expensive cost incurred by EPDs in monitoring CPGRs. Finally, some strategies are given for EPDs to help them make policies to regulate the strategies of developers.展开更多
Risk management is relevant for every project that which seeks to avoid and suppress unanticipated costs, basically calling for pre-emptive action. The current work proposes a new approach for handling risks based on ...Risk management is relevant for every project that which seeks to avoid and suppress unanticipated costs, basically calling for pre-emptive action. The current work proposes a new approach for handling risks based on predictive analytics and machine learning (ML) that can work in real-time to help avoid risks and increase project adaptability. The main research aim of the study is to ascertain risk presence in projects by using historical data from previous projects, focusing on important aspects such as time, task time, resources and project results. t-SNE technique applies feature engineering in the reduction of the dimensionality while preserving important structural properties. This process is analysed using measures including recall, F1-score, accuracy and precision measurements. The results demonstrate that the Gradient Boosting Machine (GBM) achieves an impressive 85% accuracy, 82% precision, 85% recall, and 80% F1-score, surpassing previous models. Additionally, predictive analytics achieves a resource utilisation efficiency of 85%, compared to 70% for traditional allocation methods, and a project cost reduction of 10%, double the 5% achieved by traditional approaches. Furthermore, the study indicates that while GBM excels in overall accuracy, Logistic Regression (LR) offers more favourable precision-recall trade-offs, highlighting the importance of model selection in project risk management.展开更多
Project portfolio management(PPM) is the centralized management method, process and technology in multiple projects. When multiple projects in the space industry are implemented, it provides an effective methodology t...Project portfolio management(PPM) is the centralized management method, process and technology in multiple projects. When multiple projects in the space industry are implemented, it provides an effective methodology to resolve the problems at the same time such as conflicts among models, decrease in design efficiency,and increase in target deviation. Hence, a PPM dedicated to multiple projects management in space enterprise is presented in this paper. Firstly, an analysis of features and contents in space enterprise portfolio management mode is performed by using PPM based on its specific strategic characteristics. Then, the principle and selection methods of PPM are provided as a reference for the future development of an enterprise. Finally, a multiple-level organization architecture including decision making layers, function management layers and project execution layers is proposed so as to adapt to possible changes in the multiple projects and correspond to the strategic development. As a consequence, a perfect matching mechanism to fit the changes in PPM modes is reached. In addition, the flow chart of PPM is designed and optimized by analyzing the implementation procedure of strategic target and project portfolio life-cycle, which is expected to realize the purpose of improving space enterprise management efficiency, project management capacity, innovation development and economic benefits.展开更多
文摘In order to realize the standardization and normalization of environmental protection project management.This paper uses the literature method to study the current status of the existing project management mode,and points out the problems:lack of a sound project management system,insufficient information application of project management,and unclear decentralization in project management;on this basis,this paper proposes optimization strategies from the aspects of perfecting the engineering project management system,clarifying the allocation of project management authority,and strengthening the construction of engineering project management information.And put forward the future development trend of project engineering management,on the basis of two mainstream management modes of BOT(Build-Operate-Transfer)and EPC(Engineering Procurement Construction),build a standardized project management platform to achieve intelligent management.Realize intelligent management of engineering project management to achieve standardization and standardization,greatly improving the efficiency of project management.
文摘Currently,the investment of oil and gas industry is still facing an unfavorable environment,in which,instable factors,such as financial crisis,terrorist,religious conflicts and rigorous environmental regulations,keep mucking up the business all around the world.Meanwhile,China’s rapid energy consumption growth boosted by a booming economy has put the country to rely heavily on exported oil.It is therefore extremely urgent to expand and diversify petroleum supply channel in consideration of the country’s energy security.As the world’s economy has been slowly recovering from the slump and
文摘Under the background of rapid social and economic development,the traffic volume of highways has increased,which has brought tremendous pressure to the old highways.In response to this situation,the original highway must be reconstructed and extended.It is necessary to focus on the analysis and exploration of the methods of interchange reconstruction and extension in current highway reconstruction and extension to avoid affecting normal traffic,as it will inevitably have an impact on the traffic operation environment.For this situation,it is necessary to analyze and understand the format and characteristics of traffic organization of the interchange operation area in time and propose corresponding safeguard measures.
文摘In today’s era,with the increase in the number of enterprise innovations,enterprises must adopt project portfolio management for various innovations,select alternative projects from the perspective of enterprise strategy.This paper primarily explores the use of project portfolio management in enterprise project management,hoping to improve the quality of enterprise project management and the utilization efficiency of project portfolio management in enterprise project management.
文摘The strategic management of large projects is both theoretically and practically important. Some scholars have advanced flexible strategy theory in China. The difference of strategic flexibility and flexible strategy is pointed out. The supporting system and characteristics of flexible strategy are analyzed. The changes of flexible strategy and integration of strategic management are discussed.
文摘The Construction project green risks (CPGRs) refer to those threats to environment, energy sources and material re-sources during the entire life-cycle of a construction project. The emergent green risks in exploiting these resources are of varying concern to all. In this paper, evolutionary game is introduced to make about impacts of strategy choices from interactions among the choices developers, and between the choices developers and EPDs on project green risk. The results show that CPGRs will occur if either developers find that not managing CPGRs has a better payoff than opting for CPGR management, or if monitors impose only mild fines even when they find CPGRs within construction projects of developer’s firms. The study also shows that there is a prohibitively expensive cost incurred by EPDs in monitoring CPGRs. Finally, some strategies are given for EPDs to help them make policies to regulate the strategies of developers.
文摘Risk management is relevant for every project that which seeks to avoid and suppress unanticipated costs, basically calling for pre-emptive action. The current work proposes a new approach for handling risks based on predictive analytics and machine learning (ML) that can work in real-time to help avoid risks and increase project adaptability. The main research aim of the study is to ascertain risk presence in projects by using historical data from previous projects, focusing on important aspects such as time, task time, resources and project results. t-SNE technique applies feature engineering in the reduction of the dimensionality while preserving important structural properties. This process is analysed using measures including recall, F1-score, accuracy and precision measurements. The results demonstrate that the Gradient Boosting Machine (GBM) achieves an impressive 85% accuracy, 82% precision, 85% recall, and 80% F1-score, surpassing previous models. Additionally, predictive analytics achieves a resource utilisation efficiency of 85%, compared to 70% for traditional allocation methods, and a project cost reduction of 10%, double the 5% achieved by traditional approaches. Furthermore, the study indicates that while GBM excels in overall accuracy, Logistic Regression (LR) offers more favourable precision-recall trade-offs, highlighting the importance of model selection in project risk management.
基金the National Natural Science Foundation of China(No.71172123)the Aviation Science Fund of China(No.2012ZG53083)
文摘Project portfolio management(PPM) is the centralized management method, process and technology in multiple projects. When multiple projects in the space industry are implemented, it provides an effective methodology to resolve the problems at the same time such as conflicts among models, decrease in design efficiency,and increase in target deviation. Hence, a PPM dedicated to multiple projects management in space enterprise is presented in this paper. Firstly, an analysis of features and contents in space enterprise portfolio management mode is performed by using PPM based on its specific strategic characteristics. Then, the principle and selection methods of PPM are provided as a reference for the future development of an enterprise. Finally, a multiple-level organization architecture including decision making layers, function management layers and project execution layers is proposed so as to adapt to possible changes in the multiple projects and correspond to the strategic development. As a consequence, a perfect matching mechanism to fit the changes in PPM modes is reached. In addition, the flow chart of PPM is designed and optimized by analyzing the implementation procedure of strategic target and project portfolio life-cycle, which is expected to realize the purpose of improving space enterprise management efficiency, project management capacity, innovation development and economic benefits.