The effective implementation of the project management plays a core roll in avoiding bad project use effect and waste of funds, caused by asset management planning and design errors or equipment selection errors;meanw...The effective implementation of the project management plays a core roll in avoiding bad project use effect and waste of funds, caused by asset management planning and design errors or equipment selection errors;meanwhile, it can effectively improve the operational efficiency of enterprise assets, lower operating costs and save resources. In June 1974, A. Gordon published a paper “3L Economics Concept” as the starting point, on the “Building and Quantity Surveying”, which is organized by the Royal Institution of Chartered Surveyors. In this paper, a review of domestic and foreign research, from 1974 to 2015, on the total life cycle management progress will be given, and then a comment on it will be established. After detailed investigation and analysis of related materials, we can draw a conclusion: the study of the oil and gas development project lifecycle management is just beginning now. Hence, building the whole life cycle planning index system in line with the characteristics of oil and gas development project is very necessary.展开更多
This paper presents a conceptual framework of integrated waste management which focuses on all stages of product life cycle. A mechanism of resource recovery motivating from waste in economic system (designers, produ...This paper presents a conceptual framework of integrated waste management which focuses on all stages of product life cycle. A mechanism of resource recovery motivating from waste in economic system (designers, producers, consumers, stakeholders in the field of disposal of the product) is suggested. The classification of institutional and economic instruments in the field of waste management as recoverable resources is developed. The author has proposed a scientific and methodical approach to the formation of an integrated waste management as recoverable resources, which is based on a set of methods of economic incentives at all stages of product life cycle and ensures the maximum possible and the environmentally safe management of wastes containing valuable resource components.展开更多
The critical path method is one of the oldest and most important techniques used for planning and scheduling projects.The main objective of project management science is to determine the critical path through a networ...The critical path method is one of the oldest and most important techniques used for planning and scheduling projects.The main objective of project management science is to determine the critical path through a network representation of projects.The critical path through a network can be determined by many algorithms and is useful for managing,monitoring,and controlling the time and cost of an entire project.The essential problem in this case is that activity durations are uncertain;time presents considerable uncertainty because the time of an activity is not always easily or accurately estimated.This issue increases the need to use neutrosophic theory to solve the critical path problem.Real-world problems are characterized by a lack of precision,consistency,and completeness.The concept of neutrosophic sets has been introduced as a generalization of fuzzy,intuitionistic fuzzy,and crisp sets to overcome the ambiguity surrounding real-world problems.Truth-,falsity-,and indeterminacy-membership functions are used to express neutrosophic elements.This study was performed to examine a neutrosophic event-oriented algorithm for determining the critical path in activity-on-arc networks.The activity time estimates are presented as trapezoidal neutrosophic numbers,and score and accuracy functions are used to obtain a crisp model of the problem.An appropriate numerical example is then used to explain the proposed method.展开更多
美国国防部高级研究计划局(Defense Advanced Research Projects Agency,DARPA)先进技术开发项目是研发目标明确、项目体量大、综合性强的任务导向型项目。基于科技项目生命周期过程管理研究基础,建立了科技项目管理分析框架,选取DARPA...美国国防部高级研究计划局(Defense Advanced Research Projects Agency,DARPA)先进技术开发项目是研发目标明确、项目体量大、综合性强的任务导向型项目。基于科技项目生命周期过程管理研究基础,建立了科技项目管理分析框架,选取DARPA高空长航时无人机项目为典型案例,从项目选题、项目立项、项目实施、项目验收与转化4个阶段对DARPA先进技术开发项目管理实践进行梳理,总结了DARPA开展此类任务导向型科技项目的管理经验,以期为中国相关科技项目管理工作提供参考。展开更多
文摘The effective implementation of the project management plays a core roll in avoiding bad project use effect and waste of funds, caused by asset management planning and design errors or equipment selection errors;meanwhile, it can effectively improve the operational efficiency of enterprise assets, lower operating costs and save resources. In June 1974, A. Gordon published a paper “3L Economics Concept” as the starting point, on the “Building and Quantity Surveying”, which is organized by the Royal Institution of Chartered Surveyors. In this paper, a review of domestic and foreign research, from 1974 to 2015, on the total life cycle management progress will be given, and then a comment on it will be established. After detailed investigation and analysis of related materials, we can draw a conclusion: the study of the oil and gas development project lifecycle management is just beginning now. Hence, building the whole life cycle planning index system in line with the characteristics of oil and gas development project is very necessary.
文摘This paper presents a conceptual framework of integrated waste management which focuses on all stages of product life cycle. A mechanism of resource recovery motivating from waste in economic system (designers, producers, consumers, stakeholders in the field of disposal of the product) is suggested. The classification of institutional and economic instruments in the field of waste management as recoverable resources is developed. The author has proposed a scientific and methodical approach to the formation of an integrated waste management as recoverable resources, which is based on a set of methods of economic incentives at all stages of product life cycle and ensures the maximum possible and the environmentally safe management of wastes containing valuable resource components.
基金This work was supported by the Soonchunhyang University Research Fund.
文摘The critical path method is one of the oldest and most important techniques used for planning and scheduling projects.The main objective of project management science is to determine the critical path through a network representation of projects.The critical path through a network can be determined by many algorithms and is useful for managing,monitoring,and controlling the time and cost of an entire project.The essential problem in this case is that activity durations are uncertain;time presents considerable uncertainty because the time of an activity is not always easily or accurately estimated.This issue increases the need to use neutrosophic theory to solve the critical path problem.Real-world problems are characterized by a lack of precision,consistency,and completeness.The concept of neutrosophic sets has been introduced as a generalization of fuzzy,intuitionistic fuzzy,and crisp sets to overcome the ambiguity surrounding real-world problems.Truth-,falsity-,and indeterminacy-membership functions are used to express neutrosophic elements.This study was performed to examine a neutrosophic event-oriented algorithm for determining the critical path in activity-on-arc networks.The activity time estimates are presented as trapezoidal neutrosophic numbers,and score and accuracy functions are used to obtain a crisp model of the problem.An appropriate numerical example is then used to explain the proposed method.
文摘美国国防部高级研究计划局(Defense Advanced Research Projects Agency,DARPA)先进技术开发项目是研发目标明确、项目体量大、综合性强的任务导向型项目。基于科技项目生命周期过程管理研究基础,建立了科技项目管理分析框架,选取DARPA高空长航时无人机项目为典型案例,从项目选题、项目立项、项目实施、项目验收与转化4个阶段对DARPA先进技术开发项目管理实践进行梳理,总结了DARPA开展此类任务导向型科技项目的管理经验,以期为中国相关科技项目管理工作提供参考。