The whole-process project cost management based on building information modeling(BIM)is a new management method,aiming to realize the comprehensive optimization and improvement of project cost management through the a...The whole-process project cost management based on building information modeling(BIM)is a new management method,aiming to realize the comprehensive optimization and improvement of project cost management through the application of BIM technology.This paper summarizes and analyzes the whole-process project cost management based on BIM,aiming to explore its application and development prospects in the construction industry.Firstly,this paper introduces the role and advantages of BIM technology in engineering cost management,including information integration,data sharing,and collaborative work.Secondly,the paper analyzes the key technologies and methods of the whole-process project cost management based on BIM,including model construction,data management,and cost control.In addition,the paper also discusses the challenges and limitations of the whole-process BIM project cost management,such as the inconsistency of technical standards,personnel training,and consciousness change.Finally,the paper summarizes the advantages and development prospects of the whole-process project cost management based on BIM and puts forward the direction and suggestions for future research.Through the research of this paper,it can provide a reference for construction cost management and promote innovation and development in the construction industry.展开更多
Escalation of commitment has been linked to losses in information systems (IS) projects. Understanding the nature and the rationality of escalation allows the firm to promote optimal project management practices. Th...Escalation of commitment has been linked to losses in information systems (IS) projects. Understanding the nature and the rationality of escalation allows the firm to promote optimal project management practices. This study takes an inter-disciplinary approach and draws on research from economics and management to create a model of irrational escalation and a model of rational escalation. The forces that contribute to irrational escalation include the responsibility of the same manager for both the project selection and project continuation decisions that create proneness to self-justification, the potential for negative framing of decision options due to large sunk costs, the proximity of project completion and the presence of organizational inertia. Identifying these irrational escalation factors helps design appropriate de-escalation techniques. The rational escalation model draws on the real option theory and the bandit process theory to identify conditions when project continuation is justified by the value of information and the value of flexibility that the firm receives from continuing the project.展开更多
This paper describes the implementation of an Information Systems (IS) capstone project management course that is a requirement for graduating seniors in an undergraduate Computer Information Systems (CIS) program...This paper describes the implementation of an Information Systems (IS) capstone project management course that is a requirement for graduating seniors in an undergraduate Computer Information Systems (CIS) program at a regional university. The description provides a model which includes the culmination of students' academic training in an IS curriculum which is part of a Bachelor of Business Administration (BBA) program in an accredited college of business. The course requires an application of technical and business skills, as well as systems development and project management skills--while students are working on an actual IS project for an external sponsoring organization. Rationale for implementing this type of course includes the benefits it provides to the students, the project sponsors, and the IS department providing the course. Feedback from the course is used as integral part of the C1S curriculum assessment process used for accreditation purposes.展开更多
Based on the principle of project management, through analysis and discussion of the information requirements at different stages of the project, this paper provides the readers with programming and designing methods ...Based on the principle of project management, through analysis and discussion of the information requirements at different stages of the project, this paper provides the readers with programming and designing methods of the project management information of HongHe Cigarette Factory. In this system network technique is employed to trace and evaluate the implementation of the project, finally, this paper supplies a typical function-structure of project management information system and the mode of how to construct the system.展开更多
In order to make management scientific, standard and intensive, more and more companies pay attention to plant management. Tlie system presented in this paper aims at helping NanHua Group Co. to improve its plant mana...In order to make management scientific, standard and intensive, more and more companies pay attention to plant management. Tlie system presented in this paper aims at helping NanHua Group Co. to improve its plant management level. This paper emphasizes the importance of plant management to NanHua Group Co. and mainly discusses the PMIS and how to implement plant management based on the contents of modern plant management. This part is the core of this paper. The final part sums up the research work and results.展开更多
This paper presents an analytic description of the background, general objective, design, development and implementation course of the Three Gorges Project Management System (TGPMS), puts forward a universal system st...This paper presents an analytic description of the background, general objective, design, development and implementation course of the Three Gorges Project Management System (TGPMS), puts forward a universal system structure of software management for a big scale project, and states some key factors for building a successful system through analysis of the course of building TGPMS.展开更多
Before Information Systems are developed, they must have undergone a process called Systems Development Life Cycle (SDLC) using appropriate methodology. The SDLC consists of phases varying from author to author. Howev...Before Information Systems are developed, they must have undergone a process called Systems Development Life Cycle (SDLC) using appropriate methodology. The SDLC consists of phases varying from author to author. However, an information systems project can only be successful with intense interaction amongst project manager, systems analyst, system designers and the end users. Viewed from the project manager’s perspective, the SDLC lacks the essence of project management activities. Similarly, end users involvement is not clearly specified. The main aim of this paper is to propose a framework for information systems management and development process which accommodates the views of the different participants. Furthermore, the paper sharpens the concept of conventional SDLC, on the basis of the proposed framework. In addition, tools and methods that are appropriate for the implementation of the framework are herein discussed.展开更多
The assessment of the Project Management Maturity (PMM) level shows the company how good it is at managing projects. This measurement can be performed in different domains of expertise. In the article, the issue of ...The assessment of the Project Management Maturity (PMM) level shows the company how good it is at managing projects. This measurement can be performed in different domains of expertise. In the article, the issue of PMM in the human resources (HR) area is examined. The discussion is based on a world-wide empirical research project conducted in more than 400 companies. The study was mostly focused on the machinery industry as there is a dearth of research on project management topics in this branch of the economy. Therefore, by investigating the PMM level in the HR area, a picture of the state of project management in the machinery industry will be created. For the purposes of comparison, a study was conducted on the construction (CONS) and information technology (IT) industries which, in contradistinction, are very well recognized in the scientific literature related to project management issues. This approach will help to better contextualize and understand the results from the machinery industry. The PMM level measurement was done using the author's model which assesses maturity on a scale of one to five, where one is the lowest and five, the highest level of maturity. The results of the study revealed that there were differences among the industries in PMM levels and between Polish and foreign companies.展开更多
According to the actual requirement of project management on BIM application, the paper presents a new the overall implementation scheme and system architecture based on BIM project management. This paper established ...According to the actual requirement of project management on BIM application, the paper presents a new the overall implementation scheme and system architecture based on BIM project management. This paper established the engineering project management process that suitable for the situation of our country, design the organizational structure and verified the rationality through the example simulation based on the study of ideological characteristics of BIM combined with the modem project management theory and method. The research results has a certain theory reference value in our implementation and project management to improve the level of BIM information integration.展开更多
文摘The whole-process project cost management based on building information modeling(BIM)is a new management method,aiming to realize the comprehensive optimization and improvement of project cost management through the application of BIM technology.This paper summarizes and analyzes the whole-process project cost management based on BIM,aiming to explore its application and development prospects in the construction industry.Firstly,this paper introduces the role and advantages of BIM technology in engineering cost management,including information integration,data sharing,and collaborative work.Secondly,the paper analyzes the key technologies and methods of the whole-process project cost management based on BIM,including model construction,data management,and cost control.In addition,the paper also discusses the challenges and limitations of the whole-process BIM project cost management,such as the inconsistency of technical standards,personnel training,and consciousness change.Finally,the paper summarizes the advantages and development prospects of the whole-process project cost management based on BIM and puts forward the direction and suggestions for future research.Through the research of this paper,it can provide a reference for construction cost management and promote innovation and development in the construction industry.
文摘Escalation of commitment has been linked to losses in information systems (IS) projects. Understanding the nature and the rationality of escalation allows the firm to promote optimal project management practices. This study takes an inter-disciplinary approach and draws on research from economics and management to create a model of irrational escalation and a model of rational escalation. The forces that contribute to irrational escalation include the responsibility of the same manager for both the project selection and project continuation decisions that create proneness to self-justification, the potential for negative framing of decision options due to large sunk costs, the proximity of project completion and the presence of organizational inertia. Identifying these irrational escalation factors helps design appropriate de-escalation techniques. The rational escalation model draws on the real option theory and the bandit process theory to identify conditions when project continuation is justified by the value of information and the value of flexibility that the firm receives from continuing the project.
文摘This paper describes the implementation of an Information Systems (IS) capstone project management course that is a requirement for graduating seniors in an undergraduate Computer Information Systems (CIS) program at a regional university. The description provides a model which includes the culmination of students' academic training in an IS curriculum which is part of a Bachelor of Business Administration (BBA) program in an accredited college of business. The course requires an application of technical and business skills, as well as systems development and project management skills--while students are working on an actual IS project for an external sponsoring organization. Rationale for implementing this type of course includes the benefits it provides to the students, the project sponsors, and the IS department providing the course. Feedback from the course is used as integral part of the C1S curriculum assessment process used for accreditation purposes.
文摘Based on the principle of project management, through analysis and discussion of the information requirements at different stages of the project, this paper provides the readers with programming and designing methods of the project management information of HongHe Cigarette Factory. In this system network technique is employed to trace and evaluate the implementation of the project, finally, this paper supplies a typical function-structure of project management information system and the mode of how to construct the system.
文摘In order to make management scientific, standard and intensive, more and more companies pay attention to plant management. Tlie system presented in this paper aims at helping NanHua Group Co. to improve its plant management level. This paper emphasizes the importance of plant management to NanHua Group Co. and mainly discusses the PMIS and how to implement plant management based on the contents of modern plant management. This part is the core of this paper. The final part sums up the research work and results.
文摘This paper presents an analytic description of the background, general objective, design, development and implementation course of the Three Gorges Project Management System (TGPMS), puts forward a universal system structure of software management for a big scale project, and states some key factors for building a successful system through analysis of the course of building TGPMS.
文摘Before Information Systems are developed, they must have undergone a process called Systems Development Life Cycle (SDLC) using appropriate methodology. The SDLC consists of phases varying from author to author. However, an information systems project can only be successful with intense interaction amongst project manager, systems analyst, system designers and the end users. Viewed from the project manager’s perspective, the SDLC lacks the essence of project management activities. Similarly, end users involvement is not clearly specified. The main aim of this paper is to propose a framework for information systems management and development process which accommodates the views of the different participants. Furthermore, the paper sharpens the concept of conventional SDLC, on the basis of the proposed framework. In addition, tools and methods that are appropriate for the implementation of the framework are herein discussed.
文摘The assessment of the Project Management Maturity (PMM) level shows the company how good it is at managing projects. This measurement can be performed in different domains of expertise. In the article, the issue of PMM in the human resources (HR) area is examined. The discussion is based on a world-wide empirical research project conducted in more than 400 companies. The study was mostly focused on the machinery industry as there is a dearth of research on project management topics in this branch of the economy. Therefore, by investigating the PMM level in the HR area, a picture of the state of project management in the machinery industry will be created. For the purposes of comparison, a study was conducted on the construction (CONS) and information technology (IT) industries which, in contradistinction, are very well recognized in the scientific literature related to project management issues. This approach will help to better contextualize and understand the results from the machinery industry. The PMM level measurement was done using the author's model which assesses maturity on a scale of one to five, where one is the lowest and five, the highest level of maturity. The results of the study revealed that there were differences among the industries in PMM levels and between Polish and foreign companies.
文摘According to the actual requirement of project management on BIM application, the paper presents a new the overall implementation scheme and system architecture based on BIM project management. This paper established the engineering project management process that suitable for the situation of our country, design the organizational structure and verified the rationality through the example simulation based on the study of ideological characteristics of BIM combined with the modem project management theory and method. The research results has a certain theory reference value in our implementation and project management to improve the level of BIM information integration.