期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
Project Manager's Competencies in Czech Lottery Industry Enterprise
1
作者 Katerina Hrazdilova Bockova Monika Dohnanska +1 位作者 Daniela Hilciikova Radka Vanickova 《Economics World》 2016年第6期274-282,共9页
The presented paper analyses competencies of project manager of the enterprises operating on Czech lottery market. The contribution of the paper consists of two parts. The first part focuses on the basic terminology i... The presented paper analyses competencies of project manager of the enterprises operating on Czech lottery market. The contribution of the paper consists of two parts. The first part focuses on the basic terminology issues and anchors concepts such as project manager and competencies. The second part is dedicated to the analyzing and evaluation of the competencies of ideal project manager of the enterprises operating on Czech lottery market and subsequent presentation and verification. For the analyzing and evaluation of the competencies of ideal project manager, the questionnaire of the scale type with the grade valuation 1-6 was applied within the frame of 20 enterprises operating on the lottery market in Czech Republic. The respondents were from the AG CZ, Ltd. and the competitors of this enterprise. Analyzed data were after the evaluation worked up into the form of graphs. The final output of this paper is the definition of the competencies of ideal project manager operating on Czech lottery market. The paper arose thanks to the project supportted by The Ministry of Education, Slovakia (Project KEGA No. 001DTI-4/2015, proposal of behavior strategies in the difficult social situations in the management of secondary school using the innovative predictive software tools) in cooperation of Dubnicky, Technological lnstitut in Dubnica nad Vahom with AG CZ, Ltd. and The Institute of Technological and Business in Ceske Budejovice. 展开更多
关键词 Czech lottery market lottery enterprise competencies of project managers Czech Republic competency model of project managers definition of project manager's competencies
下载PDF
Application of Binomial Option Pricing Model to the Appraisal of Knowledge Management Investment
2
作者 Jing Sui Jinsheng He Jiancheng Yu 《Chinese Business Review》 2005年第3期1-5,共5页
This paper views knowledge management (KM) investment from the angle of real options, and demonstrates the utility of the real options approach to KM investment analysis. First, KM project has characteristics of unc... This paper views knowledge management (KM) investment from the angle of real options, and demonstrates the utility of the real options approach to KM investment analysis. First, KM project has characteristics of uncertainty, irreversibility and choice of timing, which suggests that we can appraise KM investment by real options theory. Second, the paper analyses corresponding states of real options in KM and finance options. Then, this paper sheds light on the way to the application of binomial pricing method to KM investment model, which includes modeling and conducting KM options. Finally, different results are shown of using DCF method and binomial model of option evaluation via a case. 展开更多
关键词 knowledge management real options binomial option pricing model project appraisal
下载PDF
Project management maturity in construction consulting services: Case of Expo in China 被引量:1
3
作者 Yongkui LI Qing YANG +1 位作者 Beverly PASIAN Yan ZHANG 《Frontiers of Engineering Management》 2020年第3期384-395,共12页
For many years,project management maturity models(PMMM)derived from the software industry have brought immeasurable benefits.However,the adoption and investigation of PMMM in the construction field have been weak and ... For many years,project management maturity models(PMMM)derived from the software industry have brought immeasurable benefits.However,the adoption and investigation of PMMM in the construction field have been weak and insufficient,particularly in construction consulting services(CCS).Moreover,professionals have gradually realized the importance of non-process factors(e.g.,teamwork,culture,leadership)in the evaluation of PMMM.This study describes the construction of PMMM for CCS that considers non-process factors and combines them with CCS-specific process factors.To verify the effectiveness of the proposed model,we conduct a case study on the overall project management consultancy for China’s 2010 Winter Expo.The results would fill in the PMMM research gap in CCS and provide practitioners with ideas to improve their performance. 展开更多
关键词 construction consulting services project management maturity model non-process factors EXPO
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部