期刊文献+
共找到29,565篇文章
< 1 2 250 >
每页显示 20 50 100
Construction Safety Management of Mechanical and Electrical Installation Projects
1
作者 Honglou Chi 《Journal of Architectural Research and Development》 2024年第2期50-54,共5页
Various industries today rely on the support of electromechanical equipment,expanding its scope of application and leading to an increase in electromechanical installation projects.However,due to the high level of exp... Various industries today rely on the support of electromechanical equipment,expanding its scope of application and leading to an increase in electromechanical installation projects.However,due to the high level of expertise required and the potential risks involved,it is crucial to emphasize safety management during construction.This paper delves into the significance of construction safety management for electromechanical installation projects,identifies common problems encountered during construction,and proposes solutions.This analysis aims to provide relevant personnel with essential guidance and references for managing electromechanical installation projects safely. 展开更多
关键词 Construction safety Mechanical and electrical installation installation engineering Engineering projects Safety management
下载PDF
Whole-Process Project Cost Management Based on Building Information Modeling (BIM)
2
作者 Liping Yan 《Journal of Architectural Research and Development》 2024年第4期57-62,共6页
The whole-process project cost management based on building information modeling(BIM)is a new management method,aiming to realize the comprehensive optimization and improvement of project cost management through the a... The whole-process project cost management based on building information modeling(BIM)is a new management method,aiming to realize the comprehensive optimization and improvement of project cost management through the application of BIM technology.This paper summarizes and analyzes the whole-process project cost management based on BIM,aiming to explore its application and development prospects in the construction industry.Firstly,this paper introduces the role and advantages of BIM technology in engineering cost management,including information integration,data sharing,and collaborative work.Secondly,the paper analyzes the key technologies and methods of the whole-process project cost management based on BIM,including model construction,data management,and cost control.In addition,the paper also discusses the challenges and limitations of the whole-process BIM project cost management,such as the inconsistency of technical standards,personnel training,and consciousness change.Finally,the paper summarizes the advantages and development prospects of the whole-process project cost management based on BIM and puts forward the direction and suggestions for future research.Through the research of this paper,it can provide a reference for construction cost management and promote innovation and development in the construction industry. 展开更多
关键词 Building information Modeling(BIM) project cost management Data integration information sharing Cost control
下载PDF
Financial Calculation Problems and Countermeasure Analysis of Large-Scale Engineering Construction Projects
3
作者 Qiong Hou 《Proceedings of Business and Economic Studies》 2024年第2期15-21,共7页
The financial aspects of large-scale engineering construction projects profoundly influence their success.Strengthening cost control and establishing a scientific financial evaluation system can enhance the project’s... The financial aspects of large-scale engineering construction projects profoundly influence their success.Strengthening cost control and establishing a scientific financial evaluation system can enhance the project’s economic benefits,minimize unnecessary costs,and provide decision-makers with a robust financial foundation.Additionally,implementing an effective cash flow control mechanism and conducting a comprehensive assessment of potential project risks can ensure financial stability and mitigate the risk of fund shortages.Developing a practical and feasible fundraising plan,along with stringent fund management practices,can prevent fund wastage and optimize fund utilization efficiency.These measures not only facilitate smooth project progression and improve project management efficiency but also enhance the project’s economic and social outcomes. 展开更多
关键词 Large-scale engineering construction projects Financial calculation Fund management
下载PDF
Integrating Project Management, Software Development, and Knowledge Management Models: A Case Study in a Public ICT Services Organization
4
作者 Jorge Luiz dos Santos Renelson Ribeiro Sampaio 《Social Networking》 2023年第1期1-27,共27页
In project-based organizations knowledge is a critical resource used to develop and deliver products and services with a high level of quality. Therefore, a systematic and sustainable process is necessary to coordinat... In project-based organizations knowledge is a critical resource used to develop and deliver products and services with a high level of quality. Therefore, a systematic and sustainable process is necessary to coordinate knowledge management, project management and product lifecycle. This scenario predominates in companies focused on the creation and maintenance of information systems. This article presents an exploratory study based on a framework that integrates cognitive, managerial, and operational processes in a public Brazilian organization that provides services in the area of information and communications technology, focusing on the construction and maintenance of information systems. Those processes are operationalized by three management models considering knowledge, project, and software development processes. Our proposal aims to understand the relationships between those three management models and their influence on the software development process in the organization under study. Our premise is based on the principle that cognitive management, project management, and software development management must be integrated to fulfill the demands of product development and service provision. The research data was composed of registers of working hours spent on software development and maintenance projects involving 244 people allocated to 5064 projects in the period from 2007 to 2013. The study resulted in the identification of the relationships among the three management models adopted by the organization, with emphasis on knowledge management activities, which were not directly identified, making it difficult to account for and measure them. We established a set of activities connected to each one of the knowledge management model phases. Since those activities were not visible before, our approach contributed to build a systematic process to register and relate activities linked to the dimensions of cognitive processes, project management, and software construction. 展开更多
关键词 Knowledge management Knowledge Sharing integrated management project Teams Software Development
下载PDF
Fourth Industrial Revolution: A Readiness Assessment of Project Managers in Tanzania
5
作者 Edephonce Ngemera Nfuka 《Journal of Software Engineering and Applications》 2023年第3期73-90,共18页
The Fourth Industrial Revolution (4IR) is transforming the way we live, learn, work, and relate to one another. However, there is still an awareness inadequacy of the 4IR among project managers and the society in Tanz... The Fourth Industrial Revolution (4IR) is transforming the way we live, learn, work, and relate to one another. However, there is still an awareness inadequacy of the 4IR among project managers and the society in Tanzania, thus low readiness to conceptualize, implement and manage 4IR-related projects in the country. This study aimed to assess the 4IR readiness of project managers in Tanzania. The assessment is made in the frame of 4 readiness dimensions: strategy and governance structure, technology awareness, human capital digital skills development, and social-economic impact. The research used a quantitative method with the diffusion of innovations theory perspective, and data were collected mainly through an online survey questionnaire. The survey aimed at answering the research question concerning the project managers’ readiness for the 4IR. The 50 valid samples were completed by project managers from various industries such as agriculture, finance, consulting, construction, education and training, government, healthcare, Information Technology, and manufacturing. Data were analysed using SPSS. The results revealed that despite the generally low awareness of 4IR, several project managers in Tanzania have some varying awareness of 4IR technologies such as artificial intelligence, Internet of Things (IoT), data analytics, blockchain, robotics, cryptocurrency, chatbots, drones, and other digital transformation platforms. The results also indicated that project managers in Tanzania had little extent in readiness to initiate, develop and implement 4IR products and services due to inadequate 4IR-related awareness, strategy and governance structure, human capital digital skills development, and social economic impact. Consequently, some recommendations are made in the frame of the four assessed readiness dimensions for improvement. The value of this research is mainly to provide the state of 4IR readiness of project managers and associated recommendations to policymakers, practitioners, academia, donors, business industry and youth in digital innovation. The study also contributes to the body of knowledge on 4IR, project management and digital transformation. 展开更多
关键词 Fourth industrial Revolution 4IR project managers Readiness Assessment
下载PDF
Evaluating the Impact of Workshop Management on the Progress of Road Construction Projects(Case Study:Road Construction Projects of Tehran Province)
6
作者 Morteza Modarresi Fatemeh Mousavi 《Journal of Management Science & Engineering Research》 2023年第1期49-59,共11页
Construction projects,including road construction,are very important.Therefore,a lot of money is spent on these projects every year.So,the lack of proper planning will increase the cost and cause irreparable damage to... Construction projects,including road construction,are very important.Therefore,a lot of money is spent on these projects every year.So,the lack of proper planning will increase the cost and cause irreparable damage to the country.The role of workshop management is one of the most important factors in increasing the cost of these types of projects.Generally,workshop management plays a very important role in improving the quality and quantity of projects and has an important place in the project implementation process.Therefore,this study evaluated the impact of workshop management on the progress of road construction projects on a case-by-case basis in road construction projects in Tehran province.According to the purpose of the research,this study was a descriptive-survey type.In addition,the tool used in this research was a questionnaire.The statistical population of this research included all experts and specialists in road construction projects,among whom 65 people were selected by snowball method.Then the collected data were analyzed using SPSS software.The results of this study showed that the management of the workshop and its role in the control and implementation of projects is a complex process,which can be implemented at high levels and effectively by combining scientific and experimental training.And a very important point in the discussion of workshop management is applying scientific management to the use of valuable experiences from others.Because management knowledge not only does not negate the use of these experiences,but also emphasizes the necessity of using them.In other words,improving the knowledge of workshop management is one of the requirements for the implementation of value engineering in construction projects,especially road construction,and it is very important. 展开更多
关键词 Construction projects Workshop management SNOWBALL Road construction
下载PDF
Project Management in College Students' Interpreting Practice 被引量:1
7
作者 孙瑾 《海外英语》 2019年第3期173-174,共2页
Nowadays, college students, as a main part of interpreters, have engaged more and more in interpreting practices in formsof foreign guests’reception, telephone interpreting, escort interpreting and consecutive interp... Nowadays, college students, as a main part of interpreters, have engaged more and more in interpreting practices in formsof foreign guests’reception, telephone interpreting, escort interpreting and consecutive interpreting, etc. However, these practicesstill remain a lot of problems, such as low quality, disordered management and improper resource utilization, which are in urgentneed of systematic interpreting project management. Combined with the features of students’interpreting practice, students-oriented interpreting project can better manage these problems above and build a standardized and effective language servicegroup. After summarizing the features of students’interpreting practice, this paper will focus on the concrete application of interpreting project management in college students’interpreting practice. Furthermore, this paper will also provide specific work flowand methods in students-oriented interpreting project. 展开更多
关键词 inTERPRETinG project management inTERPRETinG project management students’interpreting practice students-oriented inTERPRETinG project project manager CONSULTANT inTERPRETER
下载PDF
Multi-objective optimization in highway pavement maintenance and rehabilitation project selection and scheduling:A state-of-the-art review 被引量:1
8
作者 Mohammadhosein Pourgholamali Samuel Labi Kumares C.Sinha 《Journal of Road Engineering》 2023年第3期239-251,共13页
The motivation for cost-effective management of highway pavements is evidenced not only by the massive expenditures associated with these activities at a national level but also by the consequences of poor pavement co... The motivation for cost-effective management of highway pavements is evidenced not only by the massive expenditures associated with these activities at a national level but also by the consequences of poor pavement condition on road users.This paper presents a state-of-the-art review of multi-objective optimization(MOO)problems that have been formulated and solution techniques that have been used in selecting and scheduling highway pavement rehabilitation and maintenance activities.First,the paper presents a taxonomy and hierarchy for these activities,the role of funding sources,and levels of jurisdiction.The paper then describes how three different decision mechanisms have been used in past research and practice for project selection and scheduling(historical practices,expert opinion,and explicit mathematical optimization)and identifies the pros and cons of each mechanism.The paper then focuses on the optimization mechanism and presents the types of optimization problems,formulations,and objectives that have been used in the literature.Next,the paper examines various solution algorithms and discusses issues related to their implementation.Finally,the paper identifies some barriers to implementing multi-objective optimization in selecting and scheduling highway pavement rehabilitation and maintenance activities,and makes recommendations to overcome some of these barriers. 展开更多
关键词 Multi-objective optimization Highway pavement REHABILITATION Maintenance project selection project scheduling Decision mechanism Pavement management
下载PDF
Contractor-Related Factors and Performance of Bridge Construction Projects Implemented by Kenya National Highways Authority (KeNHA) Kenya
9
作者 Joan Anyika Otike Charles Kabubo Victoria Okumu 《Open Journal of Civil Engineering》 2024年第2期214-224,共11页
The performance of bridge projects in Kenya is poor in terms of completion by schedule, cost, and quality (scope). Yet, there is less evidence of empirical research on what factors contribute to this outcome. This stu... The performance of bridge projects in Kenya is poor in terms of completion by schedule, cost, and quality (scope). Yet, there is less evidence of empirical research on what factors contribute to this outcome. This study aimed to bridge this gap by examining the effects of contractor-related factors on the performance of bridge construction projects in Kenya through a case study of the Bridge projects Implemented by the Kenya National Highway Agency (KeNHA). The theory of constraints (TOC) was adopted as its theoretical framework. Descriptive research was used, and the target population was 18 bridge construction projects, which were the units of analysis from 2012 to 2022. In each of these projects, 18 respondents, namely clients, consultants, contractors, engineers, environment and social guards, project managers, stakeholders, subcontractors, technical advisors, and inspectors, were included in a target population of 144 respondents. A census was conducted and a structured questionnaire was administered from which a response rate of 68% was achieved. The information was analyzed using descriptive, correlation, and multiple linear regression analysis. The contractor-related factors considered in the study were staff and management factors. The findings indicated that staff and management factors had a positive and significant outcome on performance of bridge construction projects. The study recommends continuous training and a safe learning environment for staff to improve their skills and performance in future projects. The study also recommends that a special category for bridge contractors be created in Kenya’s National Construction Authority rankings to ensure that only qualified contractors implement the Bridge projects. 展开更多
关键词 Staff Factors management Factors Performance Bridge projects KeNHA
下载PDF
Key Points and Difficulties in the Management of a New Guangzhou 12th People’s Hospital Branch
10
作者 Liya Fang 《Journal of World Architecture》 2024年第3期63-71,共9页
During the 13th Five-Year Plan period,to improve medical and health services,the Guangzhou Municipal government invested billions in medical construction.During that time,Guangzhou was renewing its approval procedures... During the 13th Five-Year Plan period,to improve medical and health services,the Guangzhou Municipal government invested billions in medical construction.During that time,Guangzhou was renewing its approval procedures for construction projects,and the COVID-19 outbreak changed the requirements of hospital construction.In addition to focusing more on spatial planning and layout,the integration of specialized departments,large-scale medical equipment,and numerous intelligent systems increased the complexity of hospital construction projects.The success of these projects often hinges on the quality of the management team.If a hospital construction project manager lacks experience and an understanding of the project’s key aspects,they may struggle with organization,management,and problem-solving,leading to rework,resource waste,and delays.This paper uses the construction of a new Guangzhou 12th People’s Hospital branch as an example to describe the key points and difficulties in each stage of project construction and proposes solutions for the management of similar projects in the future. 展开更多
关键词 Hospital construction project project management management essentials
下载PDF
基于Microsoft Project的建筑施工项目管理分析
11
作者 杨盛华 《中国厨卫》 2024年第7期82-84,共3页
在当前社会经济快速发展的情况下,建设工程数量不断增加,而传统的手工记录方式已经无法满足现代建设工程的需求。因此,采用先进的计算机技术来辅助建筑施工项目管理已成为当今建筑业发展的趋势。Microsoft Project作为一种专业的项目管... 在当前社会经济快速发展的情况下,建设工程数量不断增加,而传统的手工记录方式已经无法满足现代建设工程的需求。因此,采用先进的计算机技术来辅助建筑施工项目管理已成为当今建筑业发展的趋势。Microsoft Project作为一种专业的项目管理软件,具有良好的数据存储和可视化展示功能,可以有效地提高建筑施工项目的质量和效率。文章分析了如何利用Microsoft Project软件进行建筑施工项目管理,并对该方法的应用效果进行评估,以期为今后的建筑施工项目管理提供参考价值。 展开更多
关键词 Microsoft project 建筑施工 项目管理
下载PDF
How Does Robotics Process Automation (RPA) Affect Project Management Practices
12
作者 Mounir El Khatib Amna Almarri +1 位作者 Asma Almemari Aysha Alqassimi 《Advances in Internet of Things》 2023年第2期13-30,共18页
The main purpose of this literature review is to understand the effectiveness and impacts of Robotics Process Automation (RPA) on the practices of Project Management (PM). For attaining the purposes of the research st... The main purpose of this literature review is to understand the effectiveness and impacts of Robotics Process Automation (RPA) on the practices of Project Management (PM). For attaining the purposes of the research study, an extensive literature review was conducted, which helped in gaining a theoretical understanding. These findings were then justified with the help of current and relevant secondary sources in the analysis section. The findings suggested that RPA is quite advantageous for implementing in varied aspects of a business, especially in the field of project management. However, it can pose several challenges, which need to be taken into due consideration by the organizations during execution such as the capabilities of the employees and the abilities of the existing systems to incorporate automation, among others. It was ultimately concluded that RPA is highly advantageous for project management teams but its effective implementation is the key to success. 展开更多
关键词 ROBOTICS Robotics Process Automation project management PLATFORMS
下载PDF
The Importance of Construction Project Archives Management and Ways to Strengthen it
13
作者 Meicong Tao 《Journal of Architectural Research and Development》 2023年第6期43-48,共6页
China’s economy has been developing rapidly in recent years,leading to an acceleration of urbanization,which in turn caused the number of construction projects in various regions to increase significantly.Archives ar... China’s economy has been developing rapidly in recent years,leading to an acceleration of urbanization,which in turn caused the number of construction projects in various regions to increase significantly.Archives are important information for construction projects.The quality of archives management can have a great impact on the quality and economic benefits of construction projects.For this reason,it is necessary to increase the emphasis on archives management of construction projects and take effective management measures.This article introduces the concept of construction project archives,highlights the significance of effective management in construction project archives,and examines prevalent issues along with practical measures to enhance construction project archives management,with the goal of offering valuable insights for archive managers. 展开更多
关键词 Construction projects Archives management Strengthening measures
下载PDF
Reliability model of organization management chain of South-to-North Water Diversion Project during construction period 被引量:3
14
作者 Feng Jingchun Zhou Yang +2 位作者 Hong Yuzhen Zhao Shixin Ren Xiaoqiang 《Water Science and Engineering》 EI CAS 2008年第4期107-113,共7页
In order to analyze the indispensability of the organization management chain of the South-to-North Water Diversion Project (SNWDP), two basic forms (series connection state and mixed state of both series connectio... In order to analyze the indispensability of the organization management chain of the South-to-North Water Diversion Project (SNWDP), two basic forms (series connection state and mixed state of both series connection and parallel connection) of the organization management chain can be abstracted. The indispensability of each form has been studied and is described in this paper. Through analysis of the reliability of the two basic forms, reliability models of the organization management chain in the series connection state and the mixed state of both series connection and parallel connection have been set up. 展开更多
关键词 South-to-North Water Diversion project reliability model management chain parallel connection series connection
下载PDF
θ-improved limited tolerance relation model of incomplete information system for evaluation of water conservancy project management modernization 被引量:4
15
作者 Yu-qin GAO Guo-hua FANG Ya-qin LIU 《Water Science and Engineering》 EI CAS CSCD 2013年第4期469-477,共9页
The modernization of water conservancy project management is a complicated engineering system involving a management system, a management method, management personnel, the exertion of social, economic, and ecological ... The modernization of water conservancy project management is a complicated engineering system involving a management system, a management method, management personnel, the exertion of social, economic, and ecological effects, and so on. However, indices for evaluating the modernization of water conservancy project management are usually unobtainable in practical applications. Conducting appropriate extension of the classical rough set theory and then applying it to an incomplete information system are the key to the application of the rough set theory Based on analysis of some extended rough set models in incomplete information systems, a rough set model based on the θ-improved limited tolerance relation is put forward. At the same time, upper approximation and lower approximation are defined under this improved relation. According to the evaluation index system and management practices, the threshold for θ is defined. An example study indicates the practicability and maneuverability of the model. 展开更多
关键词 Key words: modernization of water conservancy project management O-improved limitedtolerance relation model upper and lower approximations threshold
下载PDF
Fuzzy Assessment Method and Its Application to Selecting Project Managers 被引量:1
16
作者 Sun Renjin Wang Zhigang Wang Li 《Petroleum Science》 SCIE CAS CSCD 2006年第4期63-66,共4页
Open competition is a new form of the assessment of candidates and selection of project managers. This has many merits compared to the traditional administrative method of appointment. This article introduces a method... Open competition is a new form of the assessment of candidates and selection of project managers. This has many merits compared to the traditional administrative method of appointment. This article introduces a method of fuzzy assessment of project manager candidates. Fuzzy assessment unifies objective qualitative and quantitative appraisal and can be used for improving decision-making in the selection process. 展开更多
关键词 Fuzzy assessment project manager selection process
下载PDF
Optimizing Bidders Selection of Multi-Round Procurement Problem in Software Project Management Using Parallel Max-Min Ant System Algorithm 被引量:1
17
作者 Dac-Nhuong Le Gia Nhu Nguyen +3 位作者 arish Garg Quyet-Thang Huynh Trinh Ngoc Bao Nguyen Ngoc Tuan 《Computers, Materials & Continua》 SCIE EI 2021年第1期993-1010,共18页
This paper presents a Game-theoretic optimization via Parallel Min-Max Ant System(PMMAS)algorithm is used in practice to determine the Nash equilibrium value to resolve the confusion in choosing appropriate bidders of... This paper presents a Game-theoretic optimization via Parallel Min-Max Ant System(PMMAS)algorithm is used in practice to determine the Nash equilibrium value to resolve the confusion in choosing appropriate bidders of multi-round procurement problem in software project management.To this end,we introduce an approach that proposes:(i)A Game-theoretic model of multiround procurement problem(ii)A Nash equilibrium strategy corresponds to multi-round strategy bid(iii)An application of PSO for the determination of global Nash equilibrium.The balance point in Nash Equilibrium can help to maintain a sustainable structure not only in terms of project management but also in terms of future cooperation.As an alternative of procuring entities subjectively,a methodology to support decision making has been studied using Nash equilibrium to create a balance point on benefit in procurement where buyers and suppliers need multiple rounds of bidding.Our goal focus on the balance point in Nash Equilibrium to optimizing bidder selection in multi-round procurement which is the most beneficial for both investors and selected tenderers.Our PMMAS algorithm is implemented based on MPI(message passing interface)to find the approximate optimal solution for the question of how to choose bidders and ensure a path for a win-win relationship of all participants in the procurement process.We also evaluate the speedup ratio and parallel efficiency between our algorithm and other proposed algorithms.As the experiment results,the high feasibility and effectiveness of the PMMAS algorithm are verified. 展开更多
关键词 Parallel min-max ant system multi-objective multi-round procurement software project management project conflicts Nash equilibrium game theory MPI
下载PDF
A Comparative Analysis of RAD and Agile Technique for Management of Computing Graduation Projects 被引量:1
18
作者 Fazal Qudus Khan Saim Rasheed +2 位作者 Maged Alsheshtawi Tarig Mohamed Ahmed Sadeeq Jan 《Computers, Materials & Continua》 SCIE EI 2020年第8期777-796,共20页
Computing students face the problem with time and quality of the work while managing their graduation/senior projects.Rapid Application Development(RAD)model is based on continual user involvement for the process of r... Computing students face the problem with time and quality of the work while managing their graduation/senior projects.Rapid Application Development(RAD)model is based on continual user involvement for the process of requirement gathering via prototyping.After each iteration,the developers can validate the requirements that are completed in the iteration.Managing a project with RAD is easier but not flexible.On the other hand,Agile project management techniques focus on flexibility,agility,teamwork and quality based on user stories.Continual user involvement is avoided,which requires extensive maintenance time for fixing iteration and release of the story points.This also makes it necessary to provide onsite training to the users of the application.This research provides the pros and cons of RAD and Agile project management techniques,to help students in deciding the best approach for managing their graduation projects.For the evaluation of these techniques,similar case studies were given to the senior project students(having similar CGPAs)for building similar functionality-based applications.The two projects“Life Organizer”developed and managed using RAD and“Smart Patient Assistant(SPA)”developed and managed through Agile methodology were evaluated against the quality assurance criteria for senior projects.The study found that the project developed with RAD methodology performed 13.33%better in providing extensive and elaborated documentation than the students following the Agile technique.On the other hand,SPA-Agile based project,due to teamwork had 2.5%better implementation than Life Organizer-RAD based project. 展开更多
关键词 Rapid application development PROTOTYPinG agile project management smart application development graduation project THESIS
下载PDF
Research on the Teaching Mode of Entrepreneurial Project Management General Courses 被引量:4
19
作者 Lai Yifei Zhao Xiaoqian Zhang Wan 《教育研究前沿(中英文版)》 2019年第2期42-47,共6页
Under the background of "the Belt and Road" and "Internet +", innovation and Entrepreneurial education in colleges and universities has been pushed to the focus of education. The opening of the cou... Under the background of "the Belt and Road" and "Internet +", innovation and Entrepreneurial education in colleges and universities has been pushed to the focus of education. The opening of the course 3.0 "Entrepreneurial Project Management" in General Studies course of Wuhan University is an innovative education mode under the requirements of the background of the times. The development of network information technology in the new era has brought about the subversion and reform of teaching mode. This paper first analyzes the problems and present situation of the teaching of Entrepreneurial project management, introduces the characteristics of the teaching mode, and makes effective research and exploration on the three teaching modes of Entrepreneurial project management, in order to provide reference for the curriculum teaching reform and to promote the teaching effect of innovation and Entrepreneurial courses in colleges and universities. 展开更多
关键词 GENERAL COURSE ENTREPRENEURIAL project management TEACHinG MODE
下载PDF
A Review on the Role of Risk Management (RM) and Value Engineering (VE) Tools for Project Successful Delivery 被引量:1
20
作者 Elysé Masengesho Ji Wei +1 位作者 Nadine Umubyeyi Rosette Niyirora 《World Journal of Engineering and Technology》 2021年第1期109-127,共19页
Both in developed and in developing countries, the construction industry is regarded as an economic investment activity without forgetting its significant relationship with national economic development due to its gre... Both in developed and in developing countries, the construction industry is regarded as an economic investment activity without forgetting its significant relationship with national economic development due to its great contributions to the national gross domestic product (GDP) of the country. Concerning construction processes, both risk management (RM) and value engineering (VE) techniques have commonalities from the beginning up to the completion of the project due to enhancing the project value/quality, meeting the project deadline, and reducing overall project cost. VE includes resolving the uncertainty of project objectives and ensuring that the project is delivered in a value for money way. The key point of RM is to solve the uncertainty of the project itself and its results to ensure that the specifications are achieved within the prescribed time, cost, and quality constraints. This review work is comparatively and collectively focus</span><span style="font-family:Verdana;">ed</span><span style="font-family:Verdana;"> on assessing the role of RM and VE tools for project successful delivery. It studies the points of difference and common features of the two aspects in terms of construction project delivery. So, this study concluded that in construction RM tool cannot be the chief aim of the all parties involved in the project execution because sometimes it produces itself negative results and reduces project management success. Therefore, RM needs a strong combination with VE due to the dependence of the target in identifying and assessing risks by considering the highest performance and lowest cost. The integration of RM and VE combination in a single study would avoid duplication of work and deliver better value for money thereby leading to better project outcomes. 展开更多
关键词 Managing projects Risk management Value Engineering Proper project Delivery
下载PDF
上一页 1 2 250 下一页 到第
使用帮助 返回顶部