This paper addresses the integrated processes of planning and scheduling of projects using technologies advanced tools as means for managing change in the era of the 4IR.The paper explores the traditional project mana...This paper addresses the integrated processes of planning and scheduling of projects using technologies advanced tools as means for managing change in the era of the 4IR.The paper explores the traditional project management planning and scheduling tools in conjunction with what technology has to offer,to bridge the gap between the traditional project management planning and scheduling tools and what the modern-day business market demands.An analysis of literature covering a wide range of theoretic and empirical studies was performed.The theories underlying various planning and scheduling methods were analysed in relation to the design of projects.A descriptive quantitative secondary data was used as a tool to assess the impact of technology on project planning for scheduling.The analysis of the study’s data was conducted using the principles of cross-tabulation.Inferences were drawn on the significant impact of the use of advanced technological tools on project planning for scheduling in current business time.Organisations can make use of the findings of this study to correctly apply the available advanced technological tools for more efficient schedule management planning to enhance the successful delivery of their projects.Further,this research can be used to provide learning opportunities for new and inexperienced planners and schedulers,and as a basis for further research in this field of knowledge.展开更多
Weapon project planning(WPP) plays a critical role in the process of national defense development and establishment of the future national defense force. WPP faces the backgrounds of various uncertainties, intense int...Weapon project planning(WPP) plays a critical role in the process of national defense development and establishment of the future national defense force. WPP faces the backgrounds of various uncertainties, intense inter-influence of weapon systems and involves modelling, assessment, and optimization procedures.The contents of this paper are mainly divided into three parts: first,the WPP processes are analyzed, and related elements are formulated to transform the qualitative problem to mathematics form;second, the value evaluation model of WPP solutions is proposed based on two criteria of total capability gap and total capability dispersion; third, two robustness optimization models are constructed based on the absolute robustness criterion and the robustness deviation criterion to support the robustness optimization process under multi-scenario. Finally, a case is studied to examine the feasibility and effectiveness of the proposed models and approaches.展开更多
Stakeholder involvement in the project planning process should include a variety of actors with different roles and responsibilities at the planning phase of the project life cycle. Failure to adequately plan greatly ...Stakeholder involvement in the project planning process should include a variety of actors with different roles and responsibilities at the planning phase of the project life cycle. Failure to adequately plan greatly reduces the project’s chances of successfully accomplishing its goals. The objective of this study was to determine the influence of stakeholder participation in project planning on the completion of urban road transport-infrastructure projects in Kenya. Pragmatic research paradigm was utilized for this study to facilitate mixed research methods. The study adopted descriptive survey and correlational research design. The target population was 1593. A sample size of 309 respondents was drawn utilizing purposive and simple random sampling procedures. A five point Likert type scale questionnaire was used to collect quantitative data while interview guides were used to collect qualitative data. The study found that stakeholder participation in project planning had a positive and significant influence on the completion of urban road transport infrastructure projects in Kenya (r = 0.838, R2 = 0.703, F (4, 209) = 123.43, p 2 = 0.703 indicating that stakeholder participation in project planning explains 70.3% of the variations in the completion of urban road transport infrastructure projects in Kenya. The study concluded that stakeholder participation in project planning significantly influences completion of urban road transport-infrastructure projects in Kenya. The study recommends the need to increase training and awareness on participation in project planning. The study also recommends the need to develop a guiding policy document detailing the importance of stakeholder participation in road construction life cycle in order to curb any future misgivings in implementation of these important socio-economic projects.展开更多
Application of participatory approaches in governmental forestry projects is a bran-new forestry design method. The purpose is to plan the utilization of land correctly, and to determine planting sites, planting speci...Application of participatory approaches in governmental forestry projects is a bran-new forestry design method. The purpose is to plan the utilization of land correctly, and to determine planting sites, planting species, participating households and management models, based on the projects' requirements and the farmers' demands. Participatory approaches are now practiced in some of the counties in Land Conversion Project. The paper presents the significance and necessity of practicing community mechanis...展开更多
As the most significant water project,the Three Gorges Project (TGP) was designed to take care of multiple objectives for water utilization such as flood control,power generation and navigation.The implementation of t...As the most significant water project,the Three Gorges Project (TGP) was designed to take care of multiple objectives for water utilization such as flood control,power generation and navigation.The implementation of the project improved the flood safety level of Jingjiang reach to more than 100-year return period,which reduced greatly the flood risk at the mid-lower reaches of Changjiang River,produce huge quantity of energy for the central,east and south China,and improved significantly the navigation conditions of Chuanjiang River.Meanwhile,the operation of the TGP in dry season which compensate the downstream water resources,will as well deepen the navigation channel and thus improve the navigation conditions in the middle river reach.With the increasing demands raised from various aspects of the society,new requirements will be made for the TGP for the purpose of harnessing,development and protection of the Yangtze River Basin.Therefore,it will be a long-term task for the operation of TGP on how to optimize the water resources utilization and implement an effective operation.展开更多
The developmental activities, particularly the construction of hydroelectric projects are causing a great loss of biodiversity in the Indian Himalayan Region. The Himachal Pradesh, a part of IHR is well known for the ...The developmental activities, particularly the construction of hydroelectric projects are causing a great loss of biodiversity in the Indian Himalayan Region. The Himachal Pradesh, a part of IHR is well known for the development of hydroelectric projects. The Parbati H.E. Project is amongst the major projects of the State. The different stages of the project are all causing loss of biodiversity of the area. Stage Ⅲ of the Parbati H.E. Project is a run of the river scheme on the Sainj River downstream of Power House of Parbati H.E. Project Stage Ⅱ. The project shall utilize regulated discharge of Parbati H.E. Project Stage Ⅱ and inflow of River Sainj for power generation, and has been contemplated as a peaking station operating in tandem with Stage Ⅱ. The present study has been undertaken to see the impact of hydroelectric project on the biodiversity, particularly on medicinal plants. A total of 104 species of medicinal plants, belonging to different life forms, i.e., trees (23 spp.), shrubs (22 spp.), herbs (57 spp.) and ferns (2 spp.) were recorded. The species have been analyzed and studied for their distribution, classification, altitudinal zones, part (s) used, indigenous uses, nativity, endemism and rarity.Different parts of these species, such as whole plants, roots (including rhizomes and tubers), leaves, flowers, fruits, seeds, stems, barks, spikes, nuts and insect galls are used by the inhabitants for curing various diseases and ailments. 30 species are native to the Himalayan region, 9 species native to the Himalayan region and adjacent countries also and 65 species are non-natives. 9 species are near endemics. Considering the whole Himalaya as a biogeographic unit (sensu lato), the near endemics are endemic to the Himalaya. Among these species, Zanthoxylum armatum is categorized as Endangered and Valeriana wallichii as Vulnerable. Hedychium spicatum, Rhus javanica, Berberis lycium, Thalictrum foliolossum, Salvia lanata, Rubia cordifolia and Bergenia ligulata may be considered as threatened species due to their over exploitation for trade. 90 species are propagated by seeds, 8 species by seeds and rhizomes/roots/tubers, 4 species by seeds and cuttings, and 2 species by sori. A management plan for the cultivation and conservation of the medicinal plants in the dam submergence area, and the commercially viable medicinal plants with high value in the catchment area is suggested.展开更多
Migrant resettlement is essential to the success of the Three Gorges Project (TGP),and the smooth implementation of resettlement is ensured by the resettlement planning and effective organization management.In the pro...Migrant resettlement is essential to the success of the Three Gorges Project (TGP),and the smooth implementation of resettlement is ensured by the resettlement planning and effective organization management.In the process of resettlement planning and implementation,systematic legislation and document support system is established;environmental capacity analysis and assets appraisal methods are introduced;resettlement sites are selected through in-depth analysis and comparison;the relationship between resettlement compensation and local development is correctly understood and considered,and reasonable resettlement schedules are well prepared.Through the establishment of efficient management system and capital management mode of "static control and dynamic management",as well as the timely adjustment of plan according to actual situations,the resettlement is accomplished smoothly.Thus,the social stability of the reservoir area is ensured;the economic development of reservoir area is promoted,and it has promoted successfully the improvement of legislation,regulations and techniques for land requisition and resettlement.The paper also discusses the theory and prospective work of resettlement.展开更多
It hasn’t been easy, but almost all of the work on the Three Gorges Project is on schedule, according to a corporation overseeing construction of the dam. The China Yangtze Three Gorges Project Development Corporatio...It hasn’t been easy, but almost all of the work on the Three Gorges Project is on schedule, according to a corporation overseeing construction of the dam. The China Yangtze Three Gorges Project Development Corporation has reported that contractors and other staff are working hard to ensure that the flood season does not slow the dam project. The company recently detailed the mammoth tasks that have taken place so展开更多
During the Eighth Five-Year Planperiod, Shaanxi Province intensifiedthe restructuring of investment andmacro-control in fixed assets investment byimplementing the policy of "limiting totalamount, readjusting stru...During the Eighth Five-Year Planperiod, Shaanxi Province intensifiedthe restructuring of investment andmacro-control in fixed assets investment byimplementing the policy of "limiting totalamount, readjusting structure, rectifying orderand improving efficiency". The wholeprovince realized RMB 110 billion in fixedassets investment, (including RMB 86.5 billionby state-owned units, RMB 14.23 billionthrough loans from the construction bank,making up 16.5 percent), RMB 67 billionmore than in the Seventh Five-Year Planperiod, with an annual increase of 26.5 percent.Thanks to the support, a group of medium-to-large and key projects have been put展开更多
Substituted plan in the environmental impact assessment (EIA) mainly means the treatment technology and the substituted site of plant, and it also includes the many kinds of environment protection measures. This paper...Substituted plan in the environmental impact assessment (EIA) mainly means the treatment technology and the substituted site of plant, and it also includes the many kinds of environment protection measures. This paper will make detailed analysis on the treatment technology, the substituted site of plant, the purpose of discharged water and the dispose of sludge in the Yongchuan wastewater treatment project.展开更多
Based on analytic hierarchy process(AHP) theory,a vital important problem for top-layer planning and overall design of modern self-propelled gun-howitzer system,namely overall project decision-making,was analyzed.A hi...Based on analytic hierarchy process(AHP) theory,a vital important problem for top-layer planning and overall design of modern self-propelled gun-howitzer system,namely overall project decision-making,was analyzed.A hierarchy model was built to solve the complex and uncertain problem,and a decision-making index system was established.Then,the weights in all layers of the model were determined by simulating experts.Finally,according to the calculated results of the elements in each layer,the weights of the alternatives to the overall goal were calculated to conduct the hierarchy total decision.A decision example shows that the overall project of a self-propelled gun-howitzer A is much better than that of another self-propelled gun-howitzer B,digitalized in comprehensive efficiency,operability,system accuracy and economy,but inferior to it in the information capability,and there exists relatively larger gap between them in the information sharing index.展开更多
文摘This paper addresses the integrated processes of planning and scheduling of projects using technologies advanced tools as means for managing change in the era of the 4IR.The paper explores the traditional project management planning and scheduling tools in conjunction with what technology has to offer,to bridge the gap between the traditional project management planning and scheduling tools and what the modern-day business market demands.An analysis of literature covering a wide range of theoretic and empirical studies was performed.The theories underlying various planning and scheduling methods were analysed in relation to the design of projects.A descriptive quantitative secondary data was used as a tool to assess the impact of technology on project planning for scheduling.The analysis of the study’s data was conducted using the principles of cross-tabulation.Inferences were drawn on the significant impact of the use of advanced technological tools on project planning for scheduling in current business time.Organisations can make use of the findings of this study to correctly apply the available advanced technological tools for more efficient schedule management planning to enhance the successful delivery of their projects.Further,this research can be used to provide learning opportunities for new and inexperienced planners and schedulers,and as a basis for further research in this field of knowledge.
基金supported by the National Social Science Foundation of China(15GJ003-278)the National Natural Science Foundation of China(71501182)
文摘Weapon project planning(WPP) plays a critical role in the process of national defense development and establishment of the future national defense force. WPP faces the backgrounds of various uncertainties, intense inter-influence of weapon systems and involves modelling, assessment, and optimization procedures.The contents of this paper are mainly divided into three parts: first,the WPP processes are analyzed, and related elements are formulated to transform the qualitative problem to mathematics form;second, the value evaluation model of WPP solutions is proposed based on two criteria of total capability gap and total capability dispersion; third, two robustness optimization models are constructed based on the absolute robustness criterion and the robustness deviation criterion to support the robustness optimization process under multi-scenario. Finally, a case is studied to examine the feasibility and effectiveness of the proposed models and approaches.
文摘Stakeholder involvement in the project planning process should include a variety of actors with different roles and responsibilities at the planning phase of the project life cycle. Failure to adequately plan greatly reduces the project’s chances of successfully accomplishing its goals. The objective of this study was to determine the influence of stakeholder participation in project planning on the completion of urban road transport-infrastructure projects in Kenya. Pragmatic research paradigm was utilized for this study to facilitate mixed research methods. The study adopted descriptive survey and correlational research design. The target population was 1593. A sample size of 309 respondents was drawn utilizing purposive and simple random sampling procedures. A five point Likert type scale questionnaire was used to collect quantitative data while interview guides were used to collect qualitative data. The study found that stakeholder participation in project planning had a positive and significant influence on the completion of urban road transport infrastructure projects in Kenya (r = 0.838, R2 = 0.703, F (4, 209) = 123.43, p 2 = 0.703 indicating that stakeholder participation in project planning explains 70.3% of the variations in the completion of urban road transport infrastructure projects in Kenya. The study concluded that stakeholder participation in project planning significantly influences completion of urban road transport-infrastructure projects in Kenya. The study recommends the need to increase training and awareness on participation in project planning. The study also recommends the need to develop a guiding policy document detailing the importance of stakeholder participation in road construction life cycle in order to curb any future misgivings in implementation of these important socio-economic projects.
文摘Application of participatory approaches in governmental forestry projects is a bran-new forestry design method. The purpose is to plan the utilization of land correctly, and to determine planting sites, planting species, participating households and management models, based on the projects' requirements and the farmers' demands. Participatory approaches are now practiced in some of the counties in Land Conversion Project. The paper presents the significance and necessity of practicing community mechanis...
文摘As the most significant water project,the Three Gorges Project (TGP) was designed to take care of multiple objectives for water utilization such as flood control,power generation and navigation.The implementation of the project improved the flood safety level of Jingjiang reach to more than 100-year return period,which reduced greatly the flood risk at the mid-lower reaches of Changjiang River,produce huge quantity of energy for the central,east and south China,and improved significantly the navigation conditions of Chuanjiang River.Meanwhile,the operation of the TGP in dry season which compensate the downstream water resources,will as well deepen the navigation channel and thus improve the navigation conditions in the middle river reach.With the increasing demands raised from various aspects of the society,new requirements will be made for the TGP for the purpose of harnessing,development and protection of the Yangtze River Basin.Therefore,it will be a long-term task for the operation of TGP on how to optimize the water resources utilization and implement an effective operation.
文摘The developmental activities, particularly the construction of hydroelectric projects are causing a great loss of biodiversity in the Indian Himalayan Region. The Himachal Pradesh, a part of IHR is well known for the development of hydroelectric projects. The Parbati H.E. Project is amongst the major projects of the State. The different stages of the project are all causing loss of biodiversity of the area. Stage Ⅲ of the Parbati H.E. Project is a run of the river scheme on the Sainj River downstream of Power House of Parbati H.E. Project Stage Ⅱ. The project shall utilize regulated discharge of Parbati H.E. Project Stage Ⅱ and inflow of River Sainj for power generation, and has been contemplated as a peaking station operating in tandem with Stage Ⅱ. The present study has been undertaken to see the impact of hydroelectric project on the biodiversity, particularly on medicinal plants. A total of 104 species of medicinal plants, belonging to different life forms, i.e., trees (23 spp.), shrubs (22 spp.), herbs (57 spp.) and ferns (2 spp.) were recorded. The species have been analyzed and studied for their distribution, classification, altitudinal zones, part (s) used, indigenous uses, nativity, endemism and rarity.Different parts of these species, such as whole plants, roots (including rhizomes and tubers), leaves, flowers, fruits, seeds, stems, barks, spikes, nuts and insect galls are used by the inhabitants for curing various diseases and ailments. 30 species are native to the Himalayan region, 9 species native to the Himalayan region and adjacent countries also and 65 species are non-natives. 9 species are near endemics. Considering the whole Himalaya as a biogeographic unit (sensu lato), the near endemics are endemic to the Himalaya. Among these species, Zanthoxylum armatum is categorized as Endangered and Valeriana wallichii as Vulnerable. Hedychium spicatum, Rhus javanica, Berberis lycium, Thalictrum foliolossum, Salvia lanata, Rubia cordifolia and Bergenia ligulata may be considered as threatened species due to their over exploitation for trade. 90 species are propagated by seeds, 8 species by seeds and rhizomes/roots/tubers, 4 species by seeds and cuttings, and 2 species by sori. A management plan for the cultivation and conservation of the medicinal plants in the dam submergence area, and the commercially viable medicinal plants with high value in the catchment area is suggested.
文摘Migrant resettlement is essential to the success of the Three Gorges Project (TGP),and the smooth implementation of resettlement is ensured by the resettlement planning and effective organization management.In the process of resettlement planning and implementation,systematic legislation and document support system is established;environmental capacity analysis and assets appraisal methods are introduced;resettlement sites are selected through in-depth analysis and comparison;the relationship between resettlement compensation and local development is correctly understood and considered,and reasonable resettlement schedules are well prepared.Through the establishment of efficient management system and capital management mode of "static control and dynamic management",as well as the timely adjustment of plan according to actual situations,the resettlement is accomplished smoothly.Thus,the social stability of the reservoir area is ensured;the economic development of reservoir area is promoted,and it has promoted successfully the improvement of legislation,regulations and techniques for land requisition and resettlement.The paper also discusses the theory and prospective work of resettlement.
文摘It hasn’t been easy, but almost all of the work on the Three Gorges Project is on schedule, according to a corporation overseeing construction of the dam. The China Yangtze Three Gorges Project Development Corporation has reported that contractors and other staff are working hard to ensure that the flood season does not slow the dam project. The company recently detailed the mammoth tasks that have taken place so
文摘During the Eighth Five-Year Planperiod, Shaanxi Province intensifiedthe restructuring of investment andmacro-control in fixed assets investment byimplementing the policy of "limiting totalamount, readjusting structure, rectifying orderand improving efficiency". The wholeprovince realized RMB 110 billion in fixedassets investment, (including RMB 86.5 billionby state-owned units, RMB 14.23 billionthrough loans from the construction bank,making up 16.5 percent), RMB 67 billionmore than in the Seventh Five-Year Planperiod, with an annual increase of 26.5 percent.Thanks to the support, a group of medium-to-large and key projects have been put
文摘Substituted plan in the environmental impact assessment (EIA) mainly means the treatment technology and the substituted site of plant, and it also includes the many kinds of environment protection measures. This paper will make detailed analysis on the treatment technology, the substituted site of plant, the purpose of discharged water and the dispose of sludge in the Yongchuan wastewater treatment project.
文摘Based on analytic hierarchy process(AHP) theory,a vital important problem for top-layer planning and overall design of modern self-propelled gun-howitzer system,namely overall project decision-making,was analyzed.A hierarchy model was built to solve the complex and uncertain problem,and a decision-making index system was established.Then,the weights in all layers of the model were determined by simulating experts.Finally,according to the calculated results of the elements in each layer,the weights of the alternatives to the overall goal were calculated to conduct the hierarchy total decision.A decision example shows that the overall project of a self-propelled gun-howitzer A is much better than that of another self-propelled gun-howitzer B,digitalized in comprehensive efficiency,operability,system accuracy and economy,but inferior to it in the information capability,and there exists relatively larger gap between them in the information sharing index.