期刊文献+
共找到8篇文章
< 1 >
每页显示 20 50 100
A New Algorithm for Resource Constraint Project Scheduling Problem Based on Multi-Agent Systems 被引量:1
1
作者 何曙光 齐二石 李钢 《Transactions of Tianjin University》 EI CAS 2003年第4期348-352,共5页
The resource constrained project scheduling problem (RCPSP) and a decision-making model based on multi-agent systems (MAS) and general equilibrium marketing are proposed. An algorithm leading to the resource allocatio... The resource constrained project scheduling problem (RCPSP) and a decision-making model based on multi-agent systems (MAS) and general equilibrium marketing are proposed. An algorithm leading to the resource allocation decision involved in RCPSP has also been developed. And this algorithm can be used in the multi-project scheduling field as well.Finally, an illustration is given. 展开更多
关键词 resource constrained project scheduling problem multi-agent systems general equilibrium market ALGORITHM
下载PDF
The construction management system and practice of Three Gorges Project 被引量:1
2
作者 Cao Guangjing 《Engineering Sciences》 EI 2011年第3期31-36,共6页
Three Gorges Project (TGP),the largest water resources and hydropower project in the world with huge scale and complex techniques,has great comprehensive benefits mainly in flood control,power generation and navigatio... Three Gorges Project (TGP),the largest water resources and hydropower project in the world with huge scale and complex techniques,has great comprehensive benefits mainly in flood control,power generation and navigation improvement.Through 17-year construction and practice,the project has been successfully completed.Some valuable experience from the successful construction of TGP has been gained for the management system and mechanism of hydropower project construction in China.Its construction management mode produces important influences on the management system of domestic capital construction.With combination of the construction management practice of TGP,the characteristics of management system and mechanism are summarized,and the suggestions on current hydropower development system and construction management mode are put forward. 展开更多
关键词 Three Gorges project(TGP) construction management water resources and hvdropower project
下载PDF
Fuzzy Approach to Determining Priority Preorders of Water Resources Projects
3
作者 刘英杰 冯平 《Transactions of Tianjin University》 EI CAS 2009年第2期121-125,共5页
In this paper,the criteria set related to the priority preorders of water resources projects is introduced.A fuzzy multiple criteria group decision-making model is established,which incorporates quantitative analysis,... In this paper,the criteria set related to the priority preorders of water resources projects is introduced.A fuzzy multiple criteria group decision-making model is established,which incorporates quantitative analysis,judgments,experience and preferences of decision-makers.The model is used in practice to determine the priority preorders of five water resources projects,and the results show that the best choice can supply more new employment,domestic water and irrigation water,and has better quality. 展开更多
关键词 fuzzy decision-making priority preorders water resources projects
下载PDF
Multi-Mode Resource Constrained Project Scheduling Models for Progress and Equal Time Interval Payments
4
作者 Yan Shangyao Wang Sin-Siang +1 位作者 Chen Miawjane Liu Jzu-Chun 《Journal of Modern Accounting and Auditing》 2014年第12期1187-1200,共14页
This study utilizes a time-precedence network technique to construct two models of multi-mode resource constrained project scheduling problem with discounted cash flows (MRCPSPDCF), individually including the progre... This study utilizes a time-precedence network technique to construct two models of multi-mode resource constrained project scheduling problem with discounted cash flows (MRCPSPDCF), individually including the progress payment (PP) and the payment at an equal time interval (ETI). The objective of each model is to maximize the net present value (NPV) for all cash flows in the project, subject to the related operational constraints. The models are characterized as NP-hard. A heuristic algorithm, coupled with two upper bound solutions, is proposed to efficiently solve the models and evaluate the heuristic algorithm performance which was not performed in past studies. The results show that the performance of proposed models and heuristic algorithm is good. 展开更多
关键词 project scheduling problem multi-mode resource constrained project scheduling problem with discountedcash flows (MRCPSPDCF) progress payment (PP) payment at an equal time interval (ETI) time-precedence network
下载PDF
Research Project Draws Clear Picture of Higher Fungus Resources
5
《Bulletin of the Chinese Academy of Sciences》 2002年第2期72-73,共2页
  A research project on China's tropical higher fungi was recently completed, providing a clear picture of the microbiological resource and a solid foundation for the protection, exploration and rational utiliza...   A research project on China's tropical higher fungi was recently completed, providing a clear picture of the microbiological resource and a solid foundation for the protection, exploration and rational utilization of China's natural legacies of biodiversity in general and tropical fungal resources in particular.…… 展开更多
关键词 project Research project Draws Clear Picture of Higher Fungus resources
下载PDF
A user-oriented resource scheduling method for improving agile software pattern in cloud environment
6
作者 龙飞 杨昌 +1 位作者 荣辉桂 李建方 《Journal of Central South University》 SCIE EI CAS CSCD 2016年第11期2906-2916,共11页
The crowdsourcing, as a service pattern in cloud environment, usually aims at the cross-disciplinary cooperation and creating value together with customers and becomes increasingly prevalent. Software process, as a ki... The crowdsourcing, as a service pattern in cloud environment, usually aims at the cross-disciplinary cooperation and creating value together with customers and becomes increasingly prevalent. Software process, as a kind of software development and management strategy, is defined as a series of activities implemented by software life cycle and provides a set of rules for various phases of the software engineering to achieve the desired objectives. With the current software development cycle getting shorter, facing more frequent needs change and fierce competition, a new resource management pattern is proposed to respond to these issues agilely by introducing the crowdsourcing service to agile software development for pushing the agility of software process. Then, a user-oriented resource scheduling method is proposed for rational use of various resources in the process and maximizing the benefits of all parties. From the experimental results, the proposed pattern and resources scheduling method reduces greatly the resource of project resource manager and increases the team resource utilization rate, which greatly improves the agility of software process and delivers software products quickly in crowdsourcing pattern. 展开更多
关键词 resource scheduling agile software development project resource manager(PRM) individual resource provider(IRP)-
下载PDF
Monitoring of small and medium embankment dams on permafrost in a changing climate
7
作者 Rudolf V.Zhang 《Research in Cold and Arid Regions》 CSCD 2014年第4期348-355,共8页
Global climate warming which began in the second half of the twentieth century is continuing. It is associated with increased risks for ecological management, especially in permafrost areas comprising over 65% of Russ... Global climate warming which began in the second half of the twentieth century is continuing. It is associated with increased risks for ecological management, especially in permafrost areas comprising over 65% of Russia. Of special concern are dams constructed on permafrost. They are subject not only to climatic impacts, but also to additional hydrothermal loads from water reservoirs. This paper presents the concept of geocryological monitoring of dams and other water resource projects and substantiates its necessity in view of climatic change. It also presents methods, scope and implementation of geocryological monitoring at medium and small dams, considering the specific nature of Far Northern areas, as well as the complicated geotechnical, hydrogeological and permafrost conditions. 展开更多
关键词 PERMAFROST water resources project embankment dam CLIMATE geotechnical system structural stability
下载PDF
Developing a new model for simultaneous scheduling of two grand projects based on game theory and solving the model with Benders decomposition
8
作者 Loghman Piri Vahidreza Ghezavati Ashkan Hafezalkotob 《Frontiers of Engineering Management》 2022年第1期117-134,共18页
Grand infrastructure projects,such as dam,power plant,petroleum,and gas industry projects,have several contractors working on them in several independent sub-projects.The concern of reducing the duration of these proj... Grand infrastructure projects,such as dam,power plant,petroleum,and gas industry projects,have several contractors working on them in several independent sub-projects.The concern of reducing the duration of these projects is one of the important issues among various aspects;thus,our aim is to fulfill the requirements by using the game theory approach.In this study,a mixed-integer programming model consisting of game theory and project scheduling is developed to reduce the duration of projects with a minimum increase in costs.In this model,two contractors in successive periods are entered into a step-by-step competition by the employer during dynamic games,considering an exchange in their limited resources.The optimum solution of the game in each stage are selected as the strategy,and the resources during the game are considered to be renewable and limited.The strategy of each contractor can be described as follows:1)share their resources with the other contractor and 2)not share the resources with the other contractor.This model can act dynamically in all circumstances during project implementation.If a player chooses a non-optimum strategy,then this strategy can immediately update itself at the succeeding time period.The proposed model is solved using the exact Benders decomposition method,which is coded in GAMS software.The results suggest the implementation of four step-by-step games between the contractors.Then,the results of our model are compared with those of the conventional models.The projects’duration in our model is reduced by 22.2%.The nominal revenue of both contractors has also reached a significant value of 46078 units compared with the relative value of zero units in the original model.Moreover,we observed in both projects the decreases of 19.5%,20.9%,and 19.7%in the total stagnation of resources of types 1,2,and 3,respectively. 展开更多
关键词 project scheduling resource leveling between projects constrained resources game theory Benders decomposition
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部