期刊文献+
共找到5,029篇文章
< 1 2 250 >
每页显示 20 50 100
Whole-Process Project Cost Management Based on Building Information Modeling (BIM)
1
作者 Liping Yan 《Journal of Architectural Research and Development》 2024年第4期57-62,共6页
The whole-process project cost management based on building information modeling(BIM)is a new management method,aiming to realize the comprehensive optimization and improvement of project cost management through the a... The whole-process project cost management based on building information modeling(BIM)is a new management method,aiming to realize the comprehensive optimization and improvement of project cost management through the application of BIM technology.This paper summarizes and analyzes the whole-process project cost management based on BIM,aiming to explore its application and development prospects in the construction industry.Firstly,this paper introduces the role and advantages of BIM technology in engineering cost management,including information integration,data sharing,and collaborative work.Secondly,the paper analyzes the key technologies and methods of the whole-process project cost management based on BIM,including model construction,data management,and cost control.In addition,the paper also discusses the challenges and limitations of the whole-process BIM project cost management,such as the inconsistency of technical standards,personnel training,and consciousness change.Finally,the paper summarizes the advantages and development prospects of the whole-process project cost management based on BIM and puts forward the direction and suggestions for future research.Through the research of this paper,it can provide a reference for construction cost management and promote innovation and development in the construction industry. 展开更多
关键词 Building Information Modeling(BIM) project cost management data integration Information sharing Cost control
下载PDF
Study of Quality Management in Construction Projects
2
作者 Tan Chin-Keng Abdul-Rahman, Hamzah 《Chinese Business Review》 2011年第7期542-552,共11页
This research management, exp and lores preliminarily the practices of quality management, management commitment in quality quality management implementation problems in construction projects in the context of Malaysi... This research management, exp and lores preliminarily the practices of quality management, management commitment in quality quality management implementation problems in construction projects in the context of Malaysian construction industry. The research applies semi-structured interview approach with twelve project management practitioners. The findings of the study indicate that the state of quality management in construction projects in Malaysia needs to be strengthened and there are problems in relation to quality management implementation that require attention and further research. The paper provides an insight on the state of quality management in construction projects in Malaysia. 展开更多
关键词 quality management construction project management PRACTICES management commitment PROBLEMS
下载PDF
Quality management project for blood transfusion services
3
《中国输血杂志》 CAS CSCD 2001年第S1期353-,共1页
关键词 quality management project for blood transfusion services
下载PDF
Research on the Present Situation and Improvement Strategy of Water Conservancy Project Construction Quality Management based on the Quality Efficiency Equilibrium Theory
4
作者 Ren Jianfei 《International Journal of Technology Management》 2015年第12期13-16,共4页
In this paper, we conduct research on the present situation and improvement strategy of the water conservancy project construction quality management based on quality efficiency equilibrium theory. Water conservancy e... In this paper, we conduct research on the present situation and improvement strategy of the water conservancy project construction quality management based on quality efficiency equilibrium theory. Water conservancy engineering construction enterprises should refer to oneself circumstance, and the characteristics of the water conservancy project, determine the quality objectives of specific quality assurance plan and the related measures, clear implementation content, methods and effects. Strictly control the factors influencing the water conservancy engineering quality of many aspects, in the process of the water conservancy project construction, to establish a meet the requirements of the technical process and quality standards, operation procedures. Establish the strict appraisal system, continuous improvement and improve the level of construction technique and technology. Establish strict quality assurance system and quality responsibility system, each division, subdivisional work will comprehensively implement in place management to ensure the engineering quality. 展开更多
关键词 Water Conservancy project quality management quality Efficiency Equilibrium
下载PDF
An Empirical Study on Project Management Maturity in Human Resources
5
作者 Seweryn Spalek 《Management Studies》 2014年第2期73-80,共8页
The assessment of the Project Management Maturity (PMM) level shows the company how good it is at managing projects. This measurement can be performed in different domains of expertise. In the article, the issue of ... The assessment of the Project Management Maturity (PMM) level shows the company how good it is at managing projects. This measurement can be performed in different domains of expertise. In the article, the issue of PMM in the human resources (HR) area is examined. The discussion is based on a world-wide empirical research project conducted in more than 400 companies. The study was mostly focused on the machinery industry as there is a dearth of research on project management topics in this branch of the economy. Therefore, by investigating the PMM level in the HR area, a picture of the state of project management in the machinery industry will be created. For the purposes of comparison, a study was conducted on the construction (CONS) and information technology (IT) industries which, in contradistinction, are very well recognized in the scientific literature related to project management issues. This approach will help to better contextualize and understand the results from the machinery industry. The PMM level measurement was done using the author's model which assesses maturity on a scale of one to five, where one is the lowest and five, the highest level of maturity. The results of the study revealed that there were differences among the industries in PMM levels and between Polish and foreign companies. 展开更多
关键词 project management maturity (PMM) human resources (HR) assessment LEVEL MACHINERY construction (CONS) information technology (IT) empirical study.
下载PDF
Cost Control research in Construction Project Management
6
作者 Danjing wang 《International Journal of Technology Management》 2013年第4期98-100,共3页
Construction project management as an important branch of management science has its own characteristics; it was known as an important aspect of project management in the 21 st century. Construction companies now face... Construction project management as an important branch of management science has its own characteristics; it was known as an important aspect of project management in the 21 st century. Construction companies now face a more complex competitive environment and more powerful competitors. In order to compete for the market and living space, Enterprises should be in a strategic height, cultivate long- term competitive advantage. Cost management is a new tool to enhance the competitiveness of enterprises, Popularization and application of Construction project management to the scientific development of the project management made the following three aspects urgent requirement. First. establish a scientific system for the construction project management. Construction Project Management knowledge system is the foundation and needs for Construction Project Management scientific and professional. 展开更多
关键词 Cost Control Construction project management quality Control.
下载PDF
Research of Graduation Project Management System Based on B/S Mode
7
作者 Ai-Mei XIAO Yan-Feng CAO 《通讯和计算机(中英文版)》 2014年第7期559-564,共6页
关键词 管理系统 毕业设计 S模式 管理人员 项目申请 项目选择 学生 教师
下载PDF
Common Management Process Model of New TQM Based on the Situation Analysis
8
作者 Kazuhiro Esaki 《Intelligent Information Management》 2016年第6期181-193,共13页
In the previous study, we suggested the concept of new TQM based on the consideration of basic concept of Quality Control. Also, in the previous study, we suggested the target domains and entities of product and proce... In the previous study, we suggested the concept of new TQM based on the consideration of basic concept of Quality Control. Also, in the previous study, we suggested the target domains and entities of product and process based on the TQM Matrix and view point of Three Dimensional Unification Value Models for managing quality of organization systems. Furthermore, in the previous study, we suggest the Common Management Process of organizations. Based on the above suggestion, in this paper, we would like to propose the Common Management Process Model of Total Quality Management based on the consideration of situation analysis and more precise definition of TQM Matrix and Three Dimensional Unification Value Model of “Product and Process”. Improvement of quality and efficiency of organization management can be expected by the integration of conventional different management such as quality assurance, quality improvement, risk management, investment individually from the view point of common management process. 展开更多
关键词 Common management Process Model TQM Matrix Three Dimensional Unification Value Model quality Assurance quality Improvement Static Risk management Dynamic Risk management Investment management project management
下载PDF
Target Entities of Total Quality Management Based on the New TQM and Three-Dimensional Unification Value Models 被引量:1
9
作者 Kazuhiro Esaki 《Intelligent Information Management》 2015年第2期70-79,共10页
In recent years, the method of TQM (Total Quality Management) is widely recognized. However, contents of target entities for assessment are various, and it is very difficult to define the whole scope of TQM. On the ot... In recent years, the method of TQM (Total Quality Management) is widely recognized. However, contents of target entities for assessment are various, and it is very difficult to define the whole scope of TQM. On the other hand, it is very important to define the whole target entities of quality management about the TQM because lack of important target entities may cause significant risk of loss in future. Furthermore, target entities of TQM should correspond to needs and priority of an objective requirement and that should be based on the consideration of basic principle of quality management. In the previous study, we have proposed the “framework of new TQM” of assessment for a total quality management of organizations based on the original concept of “TQM matrix”. On the other hand, we have proposed the view point of “Three-Dimensional Unification Value Models” for an evaluation of system product. Therefore, in this paper, we propose the target entities of whole assessment of quality management of organization totally based on the consideration of “New TQM framework” and the view point of “Three-Dimensional Unification Value Models”. Also, this paper proposes the result of verification based on the result of comparison between proposed target entities of assessment and American Malcolm Baldrige Prize for Performance Excellence. 展开更多
关键词 TARGET ENTITY TQM TQM Matrix quality Assurance quality Improvement Static RISK management Dynamic RISK management Investment management project management
下载PDF
Research on Concurrent Engineering Oriented Integrated Product Development Process Management System
10
作者 Cao Jian Zhang Shengsheng He Yuanjun CIT Lab, Shanghai Jiaotong University, Shanghai 200030, China 《Computer Aided Drafting,Design and Manufacturing》 2001年第1期48-55,共8页
In concurrent engineering, effective process management is the key to improve the efficiency and quality of product development. Although in project management system, workflow management system and PDM system, proces... In concurrent engineering, effective process management is the key to improve the efficiency and quality of product development. Although in project management system, workflow management system and PDM system, process management functions are provided, they can not meet the needs of product development. In this paper, we integrate the project management, workflow management and product management technique together and a concurrent engineering oriented integrated product development process management system is proposed. The system structure, integrated product development model and running method are introduced. The practice proves this system is powerful in supporting product development process. 展开更多
关键词 product development process project management workflow management product data management
全文增补中
A New Approach to University IT Project Portfolio Management Based on Multi-Criteria Methods and the COBIT 5 Governance Framework
11
作者 Majida LAAZIRI Khaoula BENMOUSSA +1 位作者 Abdelaziz EL ALAOUI EL AMRANI Ahmed MOUCHTACHI 《Journal of Systems Science and Information》 CSCD 2023年第5期636-654,共19页
Project portfolio management is a major challenge for some organizations.In most organizations,there are a large number of projects active at the same time,some not necessarily delivering value or not aligned with the... Project portfolio management is a major challenge for some organizations.In most organizations,there are a large number of projects active at the same time,some not necessarily delivering value or not aligned with their strategic goals.Also universities face a lot of uncertainties when selecting and prioritizing the projects that make up their portfolio.In addition,the achievement of those who are aligned with the strategy of the university becomes a great challenge.So to ensure good project portfolio management,the implementation of selection and prioritization methods and processes becomes important.For the project portfolio management to be effective,it is necessary to establish a structured method adapted to the needs and strategy of the university.In this context,this paper proposes a method for selecting and prioritizing projects within the framework of the portfolio management dedicated to universities,which can promote harmony between the university’s strategy,the needs and the priority objectives for enable better decision-making.This method is based on the processes of the COBIT 5 good practice framework,and on the multi-criteria decision-making methods AHP,TOPSIS and the WSM technique,thus,it proposes seven project selection criteria based on the five axes IT governance strategies and two catalysts derived from COBIT 5 enablers.The evaluation and validation of this method was applied in the portfolio management of the Abdelmalek Essaadi Moroccan University(AUE).The result shows that this proposed method has made it possible to make a better selection and prioritization of the portfolio of projects of Abdelmleek Essaadi University having the most value. 展开更多
关键词 IS governance information systems project portfolio management university governance project prioritization information technology(IT) good practice framework COBIT 5 APO05 multi-criteria decision-making method AHP TOPSIS WSM
原文传递
Model of generic project risk element transmission theory based on data mining 被引量:3
12
作者 李存斌 王建军 《Journal of Central South University of Technology》 EI 2008年第1期132-135,共4页
In order to construct the data mining frame for the generic project risk research, the basic definitions of the generic project risk element were given, and then a new model of the generic project risk element was pre... In order to construct the data mining frame for the generic project risk research, the basic definitions of the generic project risk element were given, and then a new model of the generic project risk element was presented with the definitions. From the model, data mining method was used to acquire the risk transmission matrix from the historical databases analysis. The quantitative calculation problem among the generic project risk elements was solved. This method deals with well the risk element transmission problems with limited states. And in order to get the limited states, fuzzy theory was used to discrete the historical data in historical databases. In an example, the controlling risk degree is chosen as P(Rs≥2) ≤0.1, it means that the probability of risk state which is not less than 2 in project is not more than 0.1, the risk element R3 is chosen to control the project, respectively. The result shows that three risk element transmission matrix can be acquired in 4 risk elements, and the frequency histogram and cumulative frequency histogram of each risk element are also given. 展开更多
关键词 data mining risk element risk management project management
下载PDF
Strengthening Project Management to Attain Overseas Blocks with High Potential for Exploration
13
作者 Shu-lin Zhang 《Frontiers of Engineering Management》 2016年第4期331-337,共7页
New overseas venture evaluation is key for oversea exploration of Chinese oil companies,whose credibility directly determine the degree of success of exploration for overseas blocks.The uniqueness of new overseas vent... New overseas venture evaluation is key for oversea exploration of Chinese oil companies,whose credibility directly determine the degree of success of exploration for overseas blocks.The uniqueness of new overseas venture evaluation in short assessing cycle and limited data make project management vital.Project management includes human resource allocation,quality control and effective communication.In China National Offshore Oilfield Corporation(CNOOC),the new overseas venture evaluation system has been established.This system includes quality control system and assurance for new overseas venture evaluation,geological evaluation norms for overseas oil & gas exploration,regulations for new overseas venture evaluation and seismic interpretation methodology and procedure for new overseas venture evaluation.Directed by the new overseas venture evaluation system,three-level quality control and management of data-room visit are strictly reinforced,which guarantees the efficiency and quality of new overseas venture evaluation.As a result the new overseas venture evaluation boosts the development of young explorationists and leads to breakthroughs in exploring potential target areas of CNOOC and in the discovery of giant oil and gas fields,which underpins the development of overseas business in CNOOC. 展开更多
关键词 new overseas venture evaluation EXPLORATION project management quality management assessing system
原文传递
Intelligent data analytics is here to change engineering management
14
作者 Jonathan Jingsheng SHI Saixing ZENG Xiaohua MENG 《Frontiers of Engineering Management》 2017年第1期41-48,共8页
A great deal of scientific research in the world aims at discovering the facts about the world so that we understand it better and find solutions to problems. Data enabling technology plays an important role in modern... A great deal of scientific research in the world aims at discovering the facts about the world so that we understand it better and find solutions to problems. Data enabling technology plays an important role in modern scientific discovery and technologic advancement. The importance of good information was long recognized by prominent leaders such as Sun Tzu and Napoleon. Factual data enables managers to measure, to understand their businesses, and to directly translate that knowledge into improved decision making and performance. This position paper argues that data analytics is ready to change engineering management in the following areas: 1) by making relevant historical data available to the manager at the time when it's needed; 2) by filtering out actionable intelligence from the ocean of data; and 3) by integrating useful data from multiple sources to support quantitative decision-making. Considering the unique need for engineering management, the paper proposes researchable topics in the two broad areas of data acquisition and data analytics. The purpose of the paper is to provoke discussion from peers and to encourage research activity. 展开更多
关键词 engineering management project management big data data analytics PLANNING EXECUTION
原文传递
国家重大项目管理应用技术就绪度评价的实施方案及优化——基于“工厂化农业关键技术与智能农机装备”国家重点专项的案例研究
15
作者 许永建 刘亚卓 +3 位作者 夏晓东 王璐瑶 胡小鹿 胡俊腾 《科技管理研究》 2024年第14期183-192,共10页
技术就绪度(TRL)评价是建立在项目分解结构和关键技术元素识别基础上的,强调了技术在不同发展阶段之间的转化,能够更直观展现专项实施进展和目标完成情况,并通过进一步丰富技术研发各阶段的评价细则创新项目管理。现阶段已经形成了比较... 技术就绪度(TRL)评价是建立在项目分解结构和关键技术元素识别基础上的,强调了技术在不同发展阶段之间的转化,能够更直观展现专项实施进展和目标完成情况,并通过进一步丰富技术研发各阶段的评价细则创新项目管理。现阶段已经形成了比较成熟的TRL9级定义,但以应用于工业领域为主,在管理层面衡量科技项目的成效尚未涉及。鉴于此,结合“工厂化农业关键技术与智能农机装备”国家重点专项的项目特点开展TRL管理方法案例研究。梳理TRL概念发展和国内外研究与应用状况,系统梳理“原理构想—技术验证—模拟环境测试—实际应用”这一研发链条,从TRL审查组、被评单位和评价对象3个关键要素入手,从技术指标、技术成果与创新性指标、应用指标3个维度构建覆盖技术、技术成果与创新性评估及应用效能的技术就绪度评价体系,并在考量评价组织机构的运作特性基础上,运用专家咨询法设计技术就绪度评价流程,分别从技术就绪度审查组和被评单位两个层面形成操作规范,构建符合该专项特点的TRL一般标准、TRL指标体系、评级要点参考指标,最终建立“工厂化农业关键技术与智能农机装备”重点专项项目的技术就绪度管理方法。根据所提出的TRL评价实施方案,进一步从开展农业领域应用试点和推广、加强评价方法普及和操作培训、促进与其他项目管理方法有效融合以及加快信息化应用和技术开发等方面,思考提出促进TRL在科技项目管理中高质量实施的建议。 展开更多
关键词 技术就绪度 国家重大项目 项目管理 项目评价 评价流程
下载PDF
BIM技术在公路桥梁施工中的应用技术
16
作者 李英杰 金花 丁广炜 《科技资讯》 2024年第14期139-141,共3页
公路建设作为我国现代社会发展的基础性工程,对促进经济社会稳定发展具有重要价值。BIM技术可以通过可视化模型的构建,优化项目管理的方式和理念,从而提高施工质量,优化施工效率。BIM技术在公路桥梁施工中的应用,对提高工程施工的整体... 公路建设作为我国现代社会发展的基础性工程,对促进经济社会稳定发展具有重要价值。BIM技术可以通过可视化模型的构建,优化项目管理的方式和理念,从而提高施工质量,优化施工效率。BIM技术在公路桥梁施工中的应用,对提高工程施工的整体质量具有重要价值。因此,分析了BIM技术在公路中的应用特点和在桥梁施工中的具体应用,旨在促进公路桥梁施工质量的提高。 展开更多
关键词 BIM技术 公路桥梁 施工技术 工程质量
下载PDF
世界一流油公司的开发管理体系与启示
17
作者 李勇 高严 +2 位作者 孙亮 韩如冰 刘双双 《石油科技论坛》 2024年第3期49-60,94,共13页
近年来,中国石油企业积极参与国际油气项目合作,与世界一流油公司展开竞争与合作,展示了技术实力,积累了丰富经验。文章研究分析世界一流油公司的先进管理案例,系统总结一流平台在方案设计体系、实施保障体系、科技与人才支撑体系及标... 近年来,中国石油企业积极参与国际油气项目合作,与世界一流油公司展开竞争与合作,展示了技术实力,积累了丰富经验。文章研究分析世界一流油公司的先进管理案例,系统总结一流平台在方案设计体系、实施保障体系、科技与人才支撑体系及标准规范体系建设方面的有力措施。方案设计体系建设包括对方案层级、模型迭代和先导试验的管理,实施保障体系建设包括对数据质量、审查机制和油藏健康的优化,科技与人才支撑体系建设包括对数据共享、技术创新和人才培养的完善,标准规范体系包括对管理标准、实施标准和技术标准的建设。建议我国油公司借鉴世界一流油公司先进管理经验,建立适合自身的开发管理体系,通过“1+4+5”的管理框架,建立以开发方案为核心的组织管理体系;通过“1+6+3”的执行方式,形成以油藏模型为核心的方案编制模式,促进企业快速成长为世界一流企业。 展开更多
关键词 国际油公司 开发管理体系 油气项目合作 模型迭代升级 科技人才培养 标准规范流程
下载PDF
人工智能技术赋能我国档案工作发展的现状与建议
18
作者 潘未梅 韩禹荣 +2 位作者 刘杨 董星仪 马林青 《档案与建设》 2024年第7期72-78,共7页
为了解当前我国档案领域人工智能技术应用的发展现状,论文运用内容分析法对全国及各省档案事业“十四五”规划、档案领域人工智能应用实践案例及国家档案局科技项目立项进行分析。研究发现我国鼓励并支持人工智能技术在档案领域的应用,... 为了解当前我国档案领域人工智能技术应用的发展现状,论文运用内容分析法对全国及各省档案事业“十四五”规划、档案领域人工智能应用实践案例及国家档案局科技项目立项进行分析。研究发现我国鼓励并支持人工智能技术在档案领域的应用,正在初步探索人工智能助推档案工作的路径和方法。在此基础上,论文从三个方面提出建议,分别是:推动人工智能技术在档案全流程管理中的应用,推动人工智能技术与档案工作的深度融合,以及关注人工智能技术成功应用于档案工作的影响因素。 展开更多
关键词 人工智能 档案管理 科技项目 融合 合作
下载PDF
借鉴发达国家经验优化我国国际科技合作项目管理的思考
19
作者 马宗文 牛雯 +3 位作者 荣念赫 巩玥 冷泠 呼万丽 《中国科学基金》 CSCD 北大核心 2024年第4期703-711,共9页
在科技创新发展新机遇与国际形势严峻复杂新挑战的双重背景下,探索建立更加符合国际合作规律的科技合作项目管理机制尤为重要。本文梳理了国家国际科技合作与交流专项及改革后的国家重点研发计划“政府间国际科技创新合作”和“战略性... 在科技创新发展新机遇与国际形势严峻复杂新挑战的双重背景下,探索建立更加符合国际合作规律的科技合作项目管理机制尤为重要。本文梳理了国家国际科技合作与交流专项及改革后的国家重点研发计划“政府间国际科技创新合作”和“战略性科技创新合作”2个国际合作类重点专项的实施情况、取得成效,分析存在的问题,借鉴美国、英国、日本、德国、欧盟等发达国家(组织)国际合作项目管理经验,提出破解当前突出问题、优化国际科技合作项目管理的政策建议。 展开更多
关键词 国际科技合作 项目管理 国家重点研发计划 发达国家经验
下载PDF
基于大数据赋能的重大科技项目监测评估新模式研究
20
作者 张亮 王再进 黄灿宏 《全球科技经济瞭望》 2024年第2期24-31,共8页
监测评估作为重大科技项目组织实施的重要抓手,在推动完善项目管理、提升管理绩效、构建科技大监督格局方面发挥了重要作用。但是,目前仍存在数字化评估手段有限、对科技决策支撑作用不充分和监测评估效能尚未充分释放等问题。为进一步... 监测评估作为重大科技项目组织实施的重要抓手,在推动完善项目管理、提升管理绩效、构建科技大监督格局方面发挥了重要作用。但是,目前仍存在数字化评估手段有限、对科技决策支撑作用不充分和监测评估效能尚未充分释放等问题。为进一步优化重大科技项目组织实施模式,让数字化、信息化工具更大程度赋能科技评估,以重大科技项目为研究对象,研究了国内外重大科技项目监测评估的模式,围绕中国现阶段重大科技项目监测评估面临的挑战,探讨了大数据赋能监测评估的理论依据、主要特点,探索构建了重大科技项目数据治理新路径,并提出了建立重大科技项目管理新机制、新方法、新模式等有关政策建议。 展开更多
关键词 重大科技项目 监测评估 数据治理 契约理论
下载PDF
上一页 1 2 250 下一页 到第
使用帮助 返回顶部