The performance of bridge projects in Kenya is poor in terms of completion by schedule, cost, and quality (scope). Yet, there is less evidence of empirical research on what factors contribute to this outcome. This stu...The performance of bridge projects in Kenya is poor in terms of completion by schedule, cost, and quality (scope). Yet, there is less evidence of empirical research on what factors contribute to this outcome. This study aimed to bridge this gap by examining the effects of contractor-related factors on the performance of bridge construction projects in Kenya through a case study of the Bridge projects Implemented by the Kenya National Highway Agency (KeNHA). The theory of constraints (TOC) was adopted as its theoretical framework. Descriptive research was used, and the target population was 18 bridge construction projects, which were the units of analysis from 2012 to 2022. In each of these projects, 18 respondents, namely clients, consultants, contractors, engineers, environment and social guards, project managers, stakeholders, subcontractors, technical advisors, and inspectors, were included in a target population of 144 respondents. A census was conducted and a structured questionnaire was administered from which a response rate of 68% was achieved. The information was analyzed using descriptive, correlation, and multiple linear regression analysis. The contractor-related factors considered in the study were staff and management factors. The findings indicated that staff and management factors had a positive and significant outcome on performance of bridge construction projects. The study recommends continuous training and a safe learning environment for staff to improve their skills and performance in future projects. The study also recommends that a special category for bridge contractors be created in Kenya’s National Construction Authority rankings to ensure that only qualified contractors implement the Bridge projects.展开更多
Sustainable performance is expected to become a major factor when examining the feasibility of a construction project in terms of its life cycle performance. The study on which this paper is based developed a simulati...Sustainable performance is expected to become a major factor when examining the feasibility of a construction project in terms of its life cycle performance. The study on which this paper is based developed a simulation model, using system dy- namics methodology, to assess the sustainable performance of projects. Three major factors are used to examine project sus- tainable performance (PSP): the sustainability of economic development (E), the sustainability of social development (S), and the sustainability of environmental development (En). Sustainable development ability (SDA) was used as a prototype to evaluate the degree of sustainable performance. The simulation software ‘ithink’ was used to help with the application of the model to a real life case. This paper explains and demonstrates the procedures used to develop the model and finally offers an approach for assessing the feasibility of a construction project in terms of its sustainable performance.展开更多
Major science and technology project generally got high social expectations as a result of harge investment.To ensure that the science and technology teams follow the norms of S&T research and make full use of the...Major science and technology project generally got high social expectations as a result of harge investment.To ensure that the science and technology teams follow the norms of S&T research and make full use of the investment,the effective norms maintenance mechanism must be established which includes punishment for violators and burnout of teams of supervisors,namely setting up the meta-norm execution mechanism.It is very important to establish the effective major science and technology project evaluation system to reduce the norm and metanorm execution cost.In this paper,the principles,methods and implementation system guarantee of evaluation system building are studied as well.展开更多
Hospital projects worldwide often experience misperformance,showing a tendency to exceed their estimated cost,miss their deadline,suffer quality problems,and yield benefit shortfalls.Considering this ubiquitous proble...Hospital projects worldwide often experience misperformance,showing a tendency to exceed their estimated cost,miss their deadline,suffer quality problems,and yield benefit shortfalls.Considering this ubiquitous problem,this paper aims to make sense of this phenomenon by addressing the following research question:How can we make sense of hospital project misperformance,and what can be done to mitigate its occurrence?We use an illustrative case study approach and the analytical lens of sense-making to examine the misperformance of three mega-hospital projects.Our research reveals issues such as scope changes,an inability to adapt and respond to risk and uncertainty,ineffectual project management and governance,and optimism bias,which combine to impact project performance adversely.We suggest that the two prominent theoretical perspectives dominating the literature in this field fall short of adequately explaining hospital project misperformance.We provide suggestions for improving the procurement process of hospitals and submit there is a need to develop a robust and balanced theory of project misperformance.展开更多
A number of studies conducted in Kenya </span><span style="font-family:Verdana;">and </span><span style="font-family:Verdana;">internationally indicate</span>...A number of studies conducted in Kenya </span><span style="font-family:Verdana;">and </span><span style="font-family:Verdana;">internationally indicate</span><span style="font-family:Verdana;">d</span><span style="font-family:""><span style="font-family:Verdana;"> that most of the construction firms and contractors do not seem to strictly observe safety administration in construction industry, hence compromised performance at implementation stage of projects and even later in the post implementation or post-delivery stage. The study aimed to examine the influence of contractors’ safety record on road performance. This is to create better understanding of how the safety record of contractors could either positively or negatively influence performance of roads during post-delivery stage. The study used both descriptive survey research design and correlation design based on a pragmatic mixed method approach. Through stratified sampling and proportionate sampling, a sample of 210 was drawn from a population of 460 comprising of registered contractors and Public Service Vehicles (PSV) drivers within Nairobi County in Kenya. Questionnaires were distributed using simple random sampling. The questionnaires returned were 153 in total representing 72.8% of all questionnaires distributed to the respondents. Data was descriptively analyzed using percentages, frequencies, means and standard deviations for measuring central tendency and variability. Inferential analysis was done by use of correlation and regression. The descriptive analysis revealed that safety policy management system, insurance policy, and adequacy of standards in addressing safety outcome are to some extent practiced and adhered to. However, compliance behavior to safety procedures is still weak and requires improvement. The null hypothesis was tested and the results obtained from a simple linear regression indicated that, R = 0.657, R</span><sup><span style="font-size:12px;font-family:Verdana;">2</span></sup><span style="font-family:Verdana;"> = 0.431, B = 0.359, t = 10.703, F (1,151) = 114.558, p = 0.000 < 0.05. This means that contractors’ safety record has a strong positive and significant relationship with road performance and that 43.1% of variation in performance is explained by safety record. This study recommends that contractors’ safety record should be part</span></span><span style="font-family:Verdana;">,</span><span style="font-family:Verdana;"> and parcel of the evaluation criteria used in selection of a suitable road contractor to ensure road performance is achieved even after construction is completed. The study is significant in that it contributes to the body of knowledge by providing empirical data on the need for safety procedures in urban road construction and beyond.展开更多
The volume of highway traffic in the United States continues to increase. In the face of this there is a concomitant need to improve and repair transportation infrastructure. Construction frequently requires a reducti...The volume of highway traffic in the United States continues to increase. In the face of this there is a concomitant need to improve and repair transportation infrastructure. Construction frequently requires a reduction in capacity during construction activity; consequently road users as well as adjacent businesses must endure the delays and inconveniences associated with transportation construction. Recognizing the problems that construction can produce, state highway agencies (SHAs) have continually sought ways to minimize the negative impact from their construction operations. Incentive contracting has played an important role in this effort to improve project performance. The Florida Department of Transportation (FDOT) is one of the leading SHAs using such innovative contracting methods as Incentive/Disincentive (I/D), A+B (cost plus time bidding) combined with I/D, No Excuse Bonus, and Liquidated Savings. This paper analyzes the traffic impact on incentive project time performance using highway construction projects recently completed in Florida. Project data obtained from FDOT were evaluated using time performance indices. A survey of traffic impact on project work types was performed in Florida in order to evaluate the relationship between construction project types and road traffic influence during construction. Based on the survey results, the 38 most frequently used work types in Florida during the study period were categorized into three traffic impact levels: (1) high traffic impact, (2) medium traffic impact, and (3) low traffic impact. Statistical analysis was performed. The results show that there are significant differences on project time performance between low and high impact levels as well as low and medium impact levels.展开更多
The construction phase of a project is a critical factor that significantly impacts its overall success.The construction environment is characterized by uncertainty and dynamism,involving nonlinear relationships among...The construction phase of a project is a critical factor that significantly impacts its overall success.The construction environment is characterized by uncertainty and dynamism,involving nonlinear relationships among various factors that affect construction quality.This study utilized 987 construction inspection records from 1993 to 2022,obtained from the Taiwan residents Public Construction Management Information System(PCMIS),to determine the relationships between construction factors and quality.First,fuzzy logic was applied to calculate the weights of 499 defects,and 25 critical construction factors were selected based on these weight values.Next,a deep neural network was used to identify the relationship between the critical construction factors(input variables)and construction quality(output variable).Finally,the prediction model’s performance was evaluated to confirm the impact of these critical construction factors on project outcomes.This study employed an innovative hybrid soft computing technique,com-bining fuzzy logic and an artificial neural network,to effectively predict the relationship between critical construction factors and construction quality,achieving a model accuracy of 96.08%.Project managers can utilize the findings of this study to enhance project management practices and establish effective construction management strategies,thereby improving project construction quality.展开更多
The agricultural comprehensive development project performance evaluation refers to the evaluation and assessment of the expected target original and effectiveness after the completion of a project, discuss how to acc...The agricultural comprehensive development project performance evaluation refers to the evaluation and assessment of the expected target original and effectiveness after the completion of a project, discuss how to according to different projects to form a reasonable evaluation system for agricultural comprehensive development project, make a reasonable assessment, which can not only ensure the project quality, but also to achieve the project plans to further improve and perfect, make agricultural development operation became more efficient, so it has the practical significance. This paper describes the construction of the performance evaluation system of agricultural comprehensive development project problems, and puts forward some countermeasures for construction of agricultural comprehensive development project performance evaluation system.展开更多
This paper takes Hebei province of small water conservancy facilities construction project as the research object, the performance evaluation purposes of construction of farmland water conservancy facilities project, ...This paper takes Hebei province of small water conservancy facilities construction project as the research object, the performance evaluation purposes of construction of farmland water conservancy facilities project, the data sources when carry out performance evaluation, performance evaluation procedures and limitations of farmland water conservancy facilities construction project performance evaluation were discussed.展开更多
Integrated Agricultural Development Project is an important part of China' s fiscal expenditure. Make a reasonable assessment to Integrated projects for agricultural development, not only can to protect the quality o...Integrated Agricultural Development Project is an important part of China' s fiscal expenditure. Make a reasonable assessment to Integrated projects for agricultural development, not only can to protect the quality of the project has been implemented, but also has important practical significance for enhancing China' s comprehensive agricultural production capacity. In this paper, combined with the present situation of China' s comprehensive agricultural development project performance evaluation, proposed the design process of comprehensive agricultural development project performance evaluation system, and analysis of the performance evaluation method selected.展开更多
Agricultural comprehensive development project is an important component of our country's financial expenditure. Making a reasonable evaluation of comprehensive agricultural development projects is not only to guaran...Agricultural comprehensive development project is an important component of our country's financial expenditure. Making a reasonable evaluation of comprehensive agricultural development projects is not only to guarantee high quality of project implementation, but also of practical significance to the enhancement of our country' s comprehensive agricultural production capacity. Being based on the present situation and characteristics of the project, this paper has raised the general thinking about the overall performance evaluation for the project and analyzed the dimension factors in the evaluation system.展开更多
Project-based learning (PBL) as an instructional approach focuses on student-centeredness through contextualizing learning by presenting students with real world issues and practices that aim at achieving enduring l...Project-based learning (PBL) as an instructional approach focuses on student-centeredness through contextualizing learning by presenting students with real world issues and practices that aim at achieving enduring learning effects. As a challenge to traditional lecture-based instruction, PBL may generate positive backwash assessment effects via documenting the process of developing authentic language skills. These skills-oriented outcomes are achieved through proper curricula in appropriate learning situations via various dimensions. However, problems may occur such as management, pressure from administration, evaluation doing their selected projects. teacher/student attitude, class size and proper group process and criteria, and students' likely frustrations in展开更多
A pplication o f m echanical excavators is one o f th e m o st com m only used excavation m eth o d s because itcan bring th e p ro ject m ore productivity, accuracy and safety. A m ong th e m echanical excavators, ro...A pplication o f m echanical excavators is one o f th e m o st com m only used excavation m eth o d s because itcan bring th e p ro ject m ore productivity, accuracy and safety. A m ong th e m echanical excavators, roadhead ers are m echanical m iners w h ich have b een extensively u se d in tu n n elin g , m ining an d civil indu stries. Perform ance pred ictio n is an im p o rta n t issue for successful ro a d h e a d e r application andgenerally deals w ith m achine selection, p ro d u ctio n rate an d b it consu m p tio n . The m ain aim o f thisresearch is to investigate th e c u ttin g p erfo rm an ce (in stan tan eo u s c u ttin g rates (ICRs)) o f m ed iu m -d u tyro ad h ead ers by using artificial neural n etw o rk (ANN) approach. T here are d ifferent categories forANNs, b u t based o n train in g alg o rith m th e re are tw o m ain k in d s: supervised and u n su p erv ised . Them u lti-lay er p ercep tro n (MLP) an d K ohonen self-organizing feature m ap (KSOFM) are th e m o st w idelyused neu ral netw o rk s for supervised an d u n su p erv ised ones, respectively. For gaining this goal, ad atab ase w as prim arily provided from ro ad h e a d e rs' p erfo rm an ce an d geom echanical characteristics o frock form ations in tu n n els and d rift galleries in Tabas coal m ine, th e larg est an d th e only fullymech an ized coal m ine in Iran. T hen th e datab ase w as analyzed in o rd e r to yield th e m ost im p o rtan tfactor for ICR by using relatively im p o rta n t factor in w hich G arson eq u atio n w as utilized. The MLPn etw o rk w as train ed by 3 in p u t p ara m e te rs including rock m ass pro p erties, rock quality d esignation(RQD), in tact rock p ro p erties such as uniaxial com pressive stre n g th (UCS) an d Brazilian ten sile stren g th(BTS), and o n e o u tp u t p a ra m e te r (ICR). In o rd e r to have m ore v alidation o n MLP o u tp u ts, KSOFM visualizationw as applied. The m ean square e rro r (MSE) an d regression coefficient (R ) o f MLP w e re found tobe 5.49 an d 0.97, respectively. M oreover, KSOFM n etw o rk has a m ap size o f 8 x 5 and final qu an tizatio nan d topographic erro rs w e re 0.383 an d 0.032, respectively. The results show th a t MLP neural n etw orkshave a strong capability to p red ict an d ev alu ate th e perfo rm an ce o f m ed iu m -d u ty ro ad h ead ers in coalm easu re rocks. Furtherm ore, it is concluded th a t KSOFM neural n etw o rk is an efficient w ay for u n d e rstand in g system beh av io r an d know ledge extraction. Finally, it is indicated th a t UCS has m ore influenceo n ICR b y applying th e b e st train ed MLP n etw o rk w eig h ts in G arson eq u atio n w h ich is also confirm ed byKSOFM.展开更多
Intellectual capital (IC) is an important source of value for companies. The competitive firm invests in new productive ideas through scientific and technological researches of the human factor and services. The tra...Intellectual capital (IC) is an important source of value for companies. The competitive firm invests in new productive ideas through scientific and technological researches of the human factor and services. The traditional factors of"old economy" based on physical assets have been replaced or at least reinforced, with the belief that the "new economy" takes its steps mainly through IC. The knowledge workers, at every organizational level, have the knowledge that allows the organization to be competitive and deal with the complexity of the environment by creating intellectual added value. In particular, the proposed analysis consists with an empirical way to show other financial indicators and market-to-book (MTB) value from the perspective of creating value for shareholders based on the dynamics of companies' performance, as value-added intellectual capital (VAICTM) is capable of expressing a direct relationship with the return on equity (ROE). The traditional financial information cannot ensure the high efficiency of a stock market and the need for IC reporting to explain intangible asset contribution in company performance.展开更多
The purpose of this paper is to describe and demonstrate the validity of a methodology to distinguish, in the performances of high education institutions (HEIs), real from perceived performances. The extension of ac...The purpose of this paper is to describe and demonstrate the validity of a methodology to distinguish, in the performances of high education institutions (HEIs), real from perceived performances. The extension of accountability to the evaluation of educational programs involves significant topics concerning the gap between perceived and real performances. It means that, since many actors such as teachers, students, and external stakeholders are involved in the process, the research on methodologies to distinguish subjective from objective parameters is still on the floor. Debate about performance evaluation in this collaboration is still in progress particularly as it concerns the proposal of several parameters and indexes to quantify the topic and reduce the subjectivism in the assessment and the gap between real and perceived performances. After describing and discussing an evaluation model based on three interdependent typologies of indexes, this will be tested in two Tempus projects having the purpose of activating Ph.D. and masters courses. The results encourage deepening researches in this direction and disseminating this methodology and extending and enriching the validation process.展开更多
In this paper,we introduce the design and implementation of ParaVT,which is a visual performance analysis and parallel debugging tool.In ParaVT,we propose an automated instrumentation mechanism.Based on this mechanism...In this paper,we introduce the design and implementation of ParaVT,which is a visual performance analysis and parallel debugging tool.In ParaVT,we propose an automated instrumentation mechanism.Based on this mechanism,ParaVT automatically analyzes the performance bottleneck of parallel applications and provides a visual user interface to monitor and analyze the performance of parallel programs.In addition,it also supports certain extensions.展开更多
Teacher evaluations intend to cultivate quality among teachers. However, since they are traditionally dependent on observers and their reports that are likely biased, the procedures probably effectuate discords among ...Teacher evaluations intend to cultivate quality among teachers. However, since they are traditionally dependent on observers and their reports that are likely biased, the procedures probably effectuate discords among the calling-teaching professionals. An evaluation procedure that can ascertain fairness in the decisions about teacher retentions, terminations, promotions, and sanctions can capture the accordance of all teachers and teacher facilitators. This paper identifies the possibility of such an evaluation system that is built upon the existing value-added methods. Drawing upon the observations and recommendations by Chetty, Friedman, and Rockoff (2012) on value-added methods of evaluation, and considering the uniqueness of ELTs (English Language Teachers) as it was observed by Borg (2006) and Lee (2010), this paper describes the application of the value-added evaluation method, in gauging the quality of ELTs. The paper further explicates the vantages and conformities embodied in the procedure that could boost up the morale of ELTs as independent professionals of a creative art, and help them perform to their fullest potential展开更多
The future of enterprises mainly depends on product research and development. For the modern enterprises, high performance project team is the most important means of R & D projects. According to the interviews and s...The future of enterprises mainly depends on product research and development. For the modern enterprises, high performance project team is the most important means of R & D projects. According to the interviews and survey found of a plurality of enterprise project R & D team. the internal high performance team of modern business is good or bad, its key lies in whether the team managers for the team creation and management is in place, this is the most difficult place for the high performance team management system, especially the team leadership. Based on this, this paper discusses on the creation and management of high performance modern enterprise team, aiming to provide valuable reference for the enterprise team management.展开更多
The Three Gorges Project (TGP) is the largest water conservancy and hydropower complex in the world, with a concrete consumption of 28 million m^3 in total. For such a significant world-attracting project, first rate ...The Three Gorges Project (TGP) is the largest water conservancy and hydropower complex in the world, with a concrete consumption of 28 million m^3 in total. For such a significant world-attracting project, first rate quality concrete is needed. Various mechanical and deformation performances of hydraulic mass concrete are determined conventionally by the wet screening method to make small specimens and the test results of the small standard specimens are taken to represent the properties of the mass concrete. However, the quantity of the coarse aggregate after wet screening would be reduced by 30% or so and the gel materials would increase by 20% or so, thus causing significant differences between the properties of the small concrete specimen and that of the total gradation concrete. To well understand the performances of the total gradation concrete of TGP dam, test studies have been performed on the total gradation concrete, including compressive strength, split tensile strength, elastic modulus, ultimate tension, dry shrinkage, self volume deformation, creep, seepage prevention, and so on, and comparison made with the small standard specimens to find out the relationship between them, which have provided scientific ground for the design, operation and safety verification of the TGP dam.展开更多
文摘The performance of bridge projects in Kenya is poor in terms of completion by schedule, cost, and quality (scope). Yet, there is less evidence of empirical research on what factors contribute to this outcome. This study aimed to bridge this gap by examining the effects of contractor-related factors on the performance of bridge construction projects in Kenya through a case study of the Bridge projects Implemented by the Kenya National Highway Agency (KeNHA). The theory of constraints (TOC) was adopted as its theoretical framework. Descriptive research was used, and the target population was 18 bridge construction projects, which were the units of analysis from 2012 to 2022. In each of these projects, 18 respondents, namely clients, consultants, contractors, engineers, environment and social guards, project managers, stakeholders, subcontractors, technical advisors, and inspectors, were included in a target population of 144 respondents. A census was conducted and a structured questionnaire was administered from which a response rate of 68% was achieved. The information was analyzed using descriptive, correlation, and multiple linear regression analysis. The contractor-related factors considered in the study were staff and management factors. The findings indicated that staff and management factors had a positive and significant outcome on performance of bridge construction projects. The study recommends continuous training and a safe learning environment for staff to improve their skills and performance in future projects. The study also recommends that a special category for bridge contractors be created in Kenya’s National Construction Authority rankings to ensure that only qualified contractors implement the Bridge projects.
基金Project supported by the Research Grant Council of Hong Kong,China
文摘Sustainable performance is expected to become a major factor when examining the feasibility of a construction project in terms of its life cycle performance. The study on which this paper is based developed a simulation model, using system dy- namics methodology, to assess the sustainable performance of projects. Three major factors are used to examine project sus- tainable performance (PSP): the sustainability of economic development (E), the sustainability of social development (S), and the sustainability of environmental development (En). Sustainable development ability (SDA) was used as a prototype to evaluate the degree of sustainable performance. The simulation software ‘ithink’ was used to help with the application of the model to a real life case. This paper explains and demonstrates the procedures used to develop the model and finally offers an approach for assessing the feasibility of a construction project in terms of its sustainable performance.
基金Supported by Soft Subject of 2011 Science Research and Technology Development Program of Nanning CityThe Performance Evaluation Research of Major Science and Technology Program in Nanning City(201106070F)
文摘Major science and technology project generally got high social expectations as a result of harge investment.To ensure that the science and technology teams follow the norms of S&T research and make full use of the investment,the effective norms maintenance mechanism must be established which includes punishment for violators and burnout of teams of supervisors,namely setting up the meta-norm execution mechanism.It is very important to establish the effective major science and technology project evaluation system to reduce the norm and metanorm execution cost.In this paper,the principles,methods and implementation system guarantee of evaluation system building are studied as well.
文摘Hospital projects worldwide often experience misperformance,showing a tendency to exceed their estimated cost,miss their deadline,suffer quality problems,and yield benefit shortfalls.Considering this ubiquitous problem,this paper aims to make sense of this phenomenon by addressing the following research question:How can we make sense of hospital project misperformance,and what can be done to mitigate its occurrence?We use an illustrative case study approach and the analytical lens of sense-making to examine the misperformance of three mega-hospital projects.Our research reveals issues such as scope changes,an inability to adapt and respond to risk and uncertainty,ineffectual project management and governance,and optimism bias,which combine to impact project performance adversely.We suggest that the two prominent theoretical perspectives dominating the literature in this field fall short of adequately explaining hospital project misperformance.We provide suggestions for improving the procurement process of hospitals and submit there is a need to develop a robust and balanced theory of project misperformance.
文摘A number of studies conducted in Kenya </span><span style="font-family:Verdana;">and </span><span style="font-family:Verdana;">internationally indicate</span><span style="font-family:Verdana;">d</span><span style="font-family:""><span style="font-family:Verdana;"> that most of the construction firms and contractors do not seem to strictly observe safety administration in construction industry, hence compromised performance at implementation stage of projects and even later in the post implementation or post-delivery stage. The study aimed to examine the influence of contractors’ safety record on road performance. This is to create better understanding of how the safety record of contractors could either positively or negatively influence performance of roads during post-delivery stage. The study used both descriptive survey research design and correlation design based on a pragmatic mixed method approach. Through stratified sampling and proportionate sampling, a sample of 210 was drawn from a population of 460 comprising of registered contractors and Public Service Vehicles (PSV) drivers within Nairobi County in Kenya. Questionnaires were distributed using simple random sampling. The questionnaires returned were 153 in total representing 72.8% of all questionnaires distributed to the respondents. Data was descriptively analyzed using percentages, frequencies, means and standard deviations for measuring central tendency and variability. Inferential analysis was done by use of correlation and regression. The descriptive analysis revealed that safety policy management system, insurance policy, and adequacy of standards in addressing safety outcome are to some extent practiced and adhered to. However, compliance behavior to safety procedures is still weak and requires improvement. The null hypothesis was tested and the results obtained from a simple linear regression indicated that, R = 0.657, R</span><sup><span style="font-size:12px;font-family:Verdana;">2</span></sup><span style="font-family:Verdana;"> = 0.431, B = 0.359, t = 10.703, F (1,151) = 114.558, p = 0.000 < 0.05. This means that contractors’ safety record has a strong positive and significant relationship with road performance and that 43.1% of variation in performance is explained by safety record. This study recommends that contractors’ safety record should be part</span></span><span style="font-family:Verdana;">,</span><span style="font-family:Verdana;"> and parcel of the evaluation criteria used in selection of a suitable road contractor to ensure road performance is achieved even after construction is completed. The study is significant in that it contributes to the body of knowledge by providing empirical data on the need for safety procedures in urban road construction and beyond.
文摘The volume of highway traffic in the United States continues to increase. In the face of this there is a concomitant need to improve and repair transportation infrastructure. Construction frequently requires a reduction in capacity during construction activity; consequently road users as well as adjacent businesses must endure the delays and inconveniences associated with transportation construction. Recognizing the problems that construction can produce, state highway agencies (SHAs) have continually sought ways to minimize the negative impact from their construction operations. Incentive contracting has played an important role in this effort to improve project performance. The Florida Department of Transportation (FDOT) is one of the leading SHAs using such innovative contracting methods as Incentive/Disincentive (I/D), A+B (cost plus time bidding) combined with I/D, No Excuse Bonus, and Liquidated Savings. This paper analyzes the traffic impact on incentive project time performance using highway construction projects recently completed in Florida. Project data obtained from FDOT were evaluated using time performance indices. A survey of traffic impact on project work types was performed in Florida in order to evaluate the relationship between construction project types and road traffic influence during construction. Based on the survey results, the 38 most frequently used work types in Florida during the study period were categorized into three traffic impact levels: (1) high traffic impact, (2) medium traffic impact, and (3) low traffic impact. Statistical analysis was performed. The results show that there are significant differences on project time performance between low and high impact levels as well as low and medium impact levels.
文摘The construction phase of a project is a critical factor that significantly impacts its overall success.The construction environment is characterized by uncertainty and dynamism,involving nonlinear relationships among various factors that affect construction quality.This study utilized 987 construction inspection records from 1993 to 2022,obtained from the Taiwan residents Public Construction Management Information System(PCMIS),to determine the relationships between construction factors and quality.First,fuzzy logic was applied to calculate the weights of 499 defects,and 25 critical construction factors were selected based on these weight values.Next,a deep neural network was used to identify the relationship between the critical construction factors(input variables)and construction quality(output variable).Finally,the prediction model’s performance was evaluated to confirm the impact of these critical construction factors on project outcomes.This study employed an innovative hybrid soft computing technique,com-bining fuzzy logic and an artificial neural network,to effectively predict the relationship between critical construction factors and construction quality,achieving a model accuracy of 96.08%.Project managers can utilize the findings of this study to enhance project management practices and establish effective construction management strategies,thereby improving project construction quality.
文摘The agricultural comprehensive development project performance evaluation refers to the evaluation and assessment of the expected target original and effectiveness after the completion of a project, discuss how to according to different projects to form a reasonable evaluation system for agricultural comprehensive development project, make a reasonable assessment, which can not only ensure the project quality, but also to achieve the project plans to further improve and perfect, make agricultural development operation became more efficient, so it has the practical significance. This paper describes the construction of the performance evaluation system of agricultural comprehensive development project problems, and puts forward some countermeasures for construction of agricultural comprehensive development project performance evaluation system.
文摘This paper takes Hebei province of small water conservancy facilities construction project as the research object, the performance evaluation purposes of construction of farmland water conservancy facilities project, the data sources when carry out performance evaluation, performance evaluation procedures and limitations of farmland water conservancy facilities construction project performance evaluation were discussed.
文摘Integrated Agricultural Development Project is an important part of China' s fiscal expenditure. Make a reasonable assessment to Integrated projects for agricultural development, not only can to protect the quality of the project has been implemented, but also has important practical significance for enhancing China' s comprehensive agricultural production capacity. In this paper, combined with the present situation of China' s comprehensive agricultural development project performance evaluation, proposed the design process of comprehensive agricultural development project performance evaluation system, and analysis of the performance evaluation method selected.
文摘Agricultural comprehensive development project is an important component of our country's financial expenditure. Making a reasonable evaluation of comprehensive agricultural development projects is not only to guarantee high quality of project implementation, but also of practical significance to the enhancement of our country' s comprehensive agricultural production capacity. Being based on the present situation and characteristics of the project, this paper has raised the general thinking about the overall performance evaluation for the project and analyzed the dimension factors in the evaluation system.
文摘Project-based learning (PBL) as an instructional approach focuses on student-centeredness through contextualizing learning by presenting students with real world issues and practices that aim at achieving enduring learning effects. As a challenge to traditional lecture-based instruction, PBL may generate positive backwash assessment effects via documenting the process of developing authentic language skills. These skills-oriented outcomes are achieved through proper curricula in appropriate learning situations via various dimensions. However, problems may occur such as management, pressure from administration, evaluation doing their selected projects. teacher/student attitude, class size and proper group process and criteria, and students' likely frustrations in
文摘A pplication o f m echanical excavators is one o f th e m o st com m only used excavation m eth o d s because itcan bring th e p ro ject m ore productivity, accuracy and safety. A m ong th e m echanical excavators, roadhead ers are m echanical m iners w h ich have b een extensively u se d in tu n n elin g , m ining an d civil indu stries. Perform ance pred ictio n is an im p o rta n t issue for successful ro a d h e a d e r application andgenerally deals w ith m achine selection, p ro d u ctio n rate an d b it consu m p tio n . The m ain aim o f thisresearch is to investigate th e c u ttin g p erfo rm an ce (in stan tan eo u s c u ttin g rates (ICRs)) o f m ed iu m -d u tyro ad h ead ers by using artificial neural n etw o rk (ANN) approach. T here are d ifferent categories forANNs, b u t based o n train in g alg o rith m th e re are tw o m ain k in d s: supervised and u n su p erv ised . Them u lti-lay er p ercep tro n (MLP) an d K ohonen self-organizing feature m ap (KSOFM) are th e m o st w idelyused neu ral netw o rk s for supervised an d u n su p erv ised ones, respectively. For gaining this goal, ad atab ase w as prim arily provided from ro ad h e a d e rs' p erfo rm an ce an d geom echanical characteristics o frock form ations in tu n n els and d rift galleries in Tabas coal m ine, th e larg est an d th e only fullymech an ized coal m ine in Iran. T hen th e datab ase w as analyzed in o rd e r to yield th e m ost im p o rtan tfactor for ICR by using relatively im p o rta n t factor in w hich G arson eq u atio n w as utilized. The MLPn etw o rk w as train ed by 3 in p u t p ara m e te rs including rock m ass pro p erties, rock quality d esignation(RQD), in tact rock p ro p erties such as uniaxial com pressive stre n g th (UCS) an d Brazilian ten sile stren g th(BTS), and o n e o u tp u t p a ra m e te r (ICR). In o rd e r to have m ore v alidation o n MLP o u tp u ts, KSOFM visualizationw as applied. The m ean square e rro r (MSE) an d regression coefficient (R ) o f MLP w e re found tobe 5.49 an d 0.97, respectively. M oreover, KSOFM n etw o rk has a m ap size o f 8 x 5 and final qu an tizatio nan d topographic erro rs w e re 0.383 an d 0.032, respectively. The results show th a t MLP neural n etw orkshave a strong capability to p red ict an d ev alu ate th e perfo rm an ce o f m ed iu m -d u ty ro ad h ead ers in coalm easu re rocks. Furtherm ore, it is concluded th a t KSOFM neural n etw o rk is an efficient w ay for u n d e rstand in g system beh av io r an d know ledge extraction. Finally, it is indicated th a t UCS has m ore influenceo n ICR b y applying th e b e st train ed MLP n etw o rk w eig h ts in G arson eq u atio n w h ich is also confirm ed byKSOFM.
文摘Intellectual capital (IC) is an important source of value for companies. The competitive firm invests in new productive ideas through scientific and technological researches of the human factor and services. The traditional factors of"old economy" based on physical assets have been replaced or at least reinforced, with the belief that the "new economy" takes its steps mainly through IC. The knowledge workers, at every organizational level, have the knowledge that allows the organization to be competitive and deal with the complexity of the environment by creating intellectual added value. In particular, the proposed analysis consists with an empirical way to show other financial indicators and market-to-book (MTB) value from the perspective of creating value for shareholders based on the dynamics of companies' performance, as value-added intellectual capital (VAICTM) is capable of expressing a direct relationship with the return on equity (ROE). The traditional financial information cannot ensure the high efficiency of a stock market and the need for IC reporting to explain intangible asset contribution in company performance.
文摘The purpose of this paper is to describe and demonstrate the validity of a methodology to distinguish, in the performances of high education institutions (HEIs), real from perceived performances. The extension of accountability to the evaluation of educational programs involves significant topics concerning the gap between perceived and real performances. It means that, since many actors such as teachers, students, and external stakeholders are involved in the process, the research on methodologies to distinguish subjective from objective parameters is still on the floor. Debate about performance evaluation in this collaboration is still in progress particularly as it concerns the proposal of several parameters and indexes to quantify the topic and reduce the subjectivism in the assessment and the gap between real and perceived performances. After describing and discussing an evaluation model based on three interdependent typologies of indexes, this will be tested in two Tempus projects having the purpose of activating Ph.D. and masters courses. The results encourage deepening researches in this direction and disseminating this methodology and extending and enriching the validation process.
文摘In this paper,we introduce the design and implementation of ParaVT,which is a visual performance analysis and parallel debugging tool.In ParaVT,we propose an automated instrumentation mechanism.Based on this mechanism,ParaVT automatically analyzes the performance bottleneck of parallel applications and provides a visual user interface to monitor and analyze the performance of parallel programs.In addition,it also supports certain extensions.
文摘Teacher evaluations intend to cultivate quality among teachers. However, since they are traditionally dependent on observers and their reports that are likely biased, the procedures probably effectuate discords among the calling-teaching professionals. An evaluation procedure that can ascertain fairness in the decisions about teacher retentions, terminations, promotions, and sanctions can capture the accordance of all teachers and teacher facilitators. This paper identifies the possibility of such an evaluation system that is built upon the existing value-added methods. Drawing upon the observations and recommendations by Chetty, Friedman, and Rockoff (2012) on value-added methods of evaluation, and considering the uniqueness of ELTs (English Language Teachers) as it was observed by Borg (2006) and Lee (2010), this paper describes the application of the value-added evaluation method, in gauging the quality of ELTs. The paper further explicates the vantages and conformities embodied in the procedure that could boost up the morale of ELTs as independent professionals of a creative art, and help them perform to their fullest potential
文摘The future of enterprises mainly depends on product research and development. For the modern enterprises, high performance project team is the most important means of R & D projects. According to the interviews and survey found of a plurality of enterprise project R & D team. the internal high performance team of modern business is good or bad, its key lies in whether the team managers for the team creation and management is in place, this is the most difficult place for the high performance team management system, especially the team leadership. Based on this, this paper discusses on the creation and management of high performance modern enterprise team, aiming to provide valuable reference for the enterprise team management.
文摘The Three Gorges Project (TGP) is the largest water conservancy and hydropower complex in the world, with a concrete consumption of 28 million m^3 in total. For such a significant world-attracting project, first rate quality concrete is needed. Various mechanical and deformation performances of hydraulic mass concrete are determined conventionally by the wet screening method to make small specimens and the test results of the small standard specimens are taken to represent the properties of the mass concrete. However, the quantity of the coarse aggregate after wet screening would be reduced by 30% or so and the gel materials would increase by 20% or so, thus causing significant differences between the properties of the small concrete specimen and that of the total gradation concrete. To well understand the performances of the total gradation concrete of TGP dam, test studies have been performed on the total gradation concrete, including compressive strength, split tensile strength, elastic modulus, ultimate tension, dry shrinkage, self volume deformation, creep, seepage prevention, and so on, and comparison made with the small standard specimens to find out the relationship between them, which have provided scientific ground for the design, operation and safety verification of the TGP dam.