Egypt construction projects are associated with different levels of risks. The lack of familiarity of project management standards is one of the common risks in the construction industry in Egypt. The main aim of this...Egypt construction projects are associated with different levels of risks. The lack of familiarity of project management standards is one of the common risks in the construction industry in Egypt. The main aim of this paper is to identify the most significant risk factors affecting highway construction project in Egypt to decrease the likelihood and impact of those risks. The research method starts with extensive literature review to provide a prime risk factors list which was also augmented to expertise to reach final risk factor list which contains all risks that may be faced during highway construction. Subsequently, a set of 12 risk groups consisting of 73 risks was selected and a questionnaire survey was conducted to determine the likelihood and consequences of the identified risks. Later, a software application was developed using MATLAB to facilitate risk evaluation of highways projects. Results indicated that the risk factors arise from owner side is one of the most common risk factors in the construction industry in Egypt as the owner in the majority of construction project in Egypt is the governmental sector, however, the overall project risk of highway construction projects in Egypt is considered as at a medium level.展开更多
The assessment of the Project Management Maturity (PMM) level shows the company how good it is at managing projects. This measurement can be performed in different domains of expertise. In the article, the issue of ...The assessment of the Project Management Maturity (PMM) level shows the company how good it is at managing projects. This measurement can be performed in different domains of expertise. In the article, the issue of PMM in the human resources (HR) area is examined. The discussion is based on a world-wide empirical research project conducted in more than 400 companies. The study was mostly focused on the machinery industry as there is a dearth of research on project management topics in this branch of the economy. Therefore, by investigating the PMM level in the HR area, a picture of the state of project management in the machinery industry will be created. For the purposes of comparison, a study was conducted on the construction (CONS) and information technology (IT) industries which, in contradistinction, are very well recognized in the scientific literature related to project management issues. This approach will help to better contextualize and understand the results from the machinery industry. The PMM level measurement was done using the author's model which assesses maturity on a scale of one to five, where one is the lowest and five, the highest level of maturity. The results of the study revealed that there were differences among the industries in PMM levels and between Polish and foreign companies.展开更多
文摘Egypt construction projects are associated with different levels of risks. The lack of familiarity of project management standards is one of the common risks in the construction industry in Egypt. The main aim of this paper is to identify the most significant risk factors affecting highway construction project in Egypt to decrease the likelihood and impact of those risks. The research method starts with extensive literature review to provide a prime risk factors list which was also augmented to expertise to reach final risk factor list which contains all risks that may be faced during highway construction. Subsequently, a set of 12 risk groups consisting of 73 risks was selected and a questionnaire survey was conducted to determine the likelihood and consequences of the identified risks. Later, a software application was developed using MATLAB to facilitate risk evaluation of highways projects. Results indicated that the risk factors arise from owner side is one of the most common risk factors in the construction industry in Egypt as the owner in the majority of construction project in Egypt is the governmental sector, however, the overall project risk of highway construction projects in Egypt is considered as at a medium level.
文摘The assessment of the Project Management Maturity (PMM) level shows the company how good it is at managing projects. This measurement can be performed in different domains of expertise. In the article, the issue of PMM in the human resources (HR) area is examined. The discussion is based on a world-wide empirical research project conducted in more than 400 companies. The study was mostly focused on the machinery industry as there is a dearth of research on project management topics in this branch of the economy. Therefore, by investigating the PMM level in the HR area, a picture of the state of project management in the machinery industry will be created. For the purposes of comparison, a study was conducted on the construction (CONS) and information technology (IT) industries which, in contradistinction, are very well recognized in the scientific literature related to project management issues. This approach will help to better contextualize and understand the results from the machinery industry. The PMM level measurement was done using the author's model which assesses maturity on a scale of one to five, where one is the lowest and five, the highest level of maturity. The results of the study revealed that there were differences among the industries in PMM levels and between Polish and foreign companies.