期刊文献+
共找到641篇文章
< 1 2 33 >
每页显示 20 50 100
Study of Factors Causing Time and Cost Overrun in Pre-Construction Project (A Case Study of Malaysia)
1
作者 Muhammad Ilyas Jing Li Irfan Ullah 《World Journal of Engineering and Technology》 2020年第1期1-12,共12页
Cost and time overrun are the key troubles of any improvement ventures. These troubles are inflicting the terrible end result in the development of kingdom monetary improvement and thriving. To overcome these problems... Cost and time overrun are the key troubles of any improvement ventures. These troubles are inflicting the terrible end result in the development of kingdom monetary improvement and thriving. To overcome these problems, the?paper examines predominant impact on elements causing the mission postponement and cost. A poll review was led for the situation study embracing various information-gathering procedures. The discoveries from the contextual investigation uncovered that the most persuasive factors in Malaysia:?1) contractor’s inappropriate arranging, 2) poor site the board, 3) deficient contractual worker experience,?are the most powerful factors. This paper has likewise broken down the normal and least effective of the postpone variables causing task deferral and cost overrun in Malaysia. It likewise infers that there are various measures as per the idea of deferring components to decrease the effect on task postponement and cost overruns in the development industry.?There are significant factors in the control of time overrun that would be actual thought related to know and tackle in great impact to improvement rate which may additionally no capacity that be recovered. Thirty (30) massive development extensions in Malaysia were exceptional coping with time overrun at some stage in development. Out of 30 undertakings, 17 (56.67%) ventures had been introduced by using 1100 days’ time overrun, 5 (16.67%) extensions in the middle of a hundred and one to 200 days, 5 (16.67%) ventures?201 to 300 days while three (10%) ventures have been deferred for timeframe over 300 days. 展开更多
关键词 cost and time Overruns DELAY Factors Construction Industry projectS DELAY
下载PDF
多项目环境下time-cost置换问题建模与求解 被引量:2
2
作者 王勇胜 梁昌勇 鞠彦忠 《计算机工程与应用》 CSCD 北大核心 2010年第20期237-240,共4页
针对多项目环境下的time-cost置换问题,以活动资源为决策变量,建立了以各项目总延迟最小与总成本最小的双目标time-cost置换模型。在总结前人对于多目标优化求解方法的基础上,针对多项目的特点,提出了基于NSGA-II非劣排序的局部直接搜... 针对多项目环境下的time-cost置换问题,以活动资源为决策变量,建立了以各项目总延迟最小与总成本最小的双目标time-cost置换模型。在总结前人对于多目标优化求解方法的基础上,针对多项目的特点,提出了基于NSGA-II非劣排序的局部直接搜索改进遗传算法,并考虑资源为连续与离散两种情况进行求解。与NSGA-II相比,算法可以较快地收敛到最优解,并且具有较好的离散变量搜索能力,与ZDT系列测试函数的比较也体现了算法的优越性。 展开更多
关键词 多项目 双目标 time-cost置换
下载PDF
The Effect of Price Discount on Time-Cost Trade-off Problem Using Genetic Algorithm
3
作者 Hadi Mokhtari Abdollah Aghaie 《Engineering(科研)》 2009年第1期33-40,共8页
Time-cost trade off problem (TCTP), known in the literature as project crashing problem (PCP) and project speeding up problem (PSP) is a part of project management in planning phase. In this problem, determining the o... Time-cost trade off problem (TCTP), known in the literature as project crashing problem (PCP) and project speeding up problem (PSP) is a part of project management in planning phase. In this problem, determining the optimal levels of activity durations and activity costs which satisfy the project goal(s), leads to a balance between the project completion time and the project total cost. A large amount of literature has studied this problem under various behavior of cost function. But, in all of them, influence of discount has not been in-vestigated. Hence, in this paper, TCTP would be studied considering the influence of discount on the re-source price, using genetic algorithm (GA). The performance of proposed idea has been tested on a medium scale test problem and several computational experiments have been conducted to investigate the appropriate levels of proposed GA considering accuracy and computational time. 展开更多
关键词 project Management PERT Networks time cost TRADE OFF GENETIC Algorithm DISCOUNT
下载PDF
Cost Control research in Construction Project Management
4
作者 Danjing wang 《International Journal of Technology Management》 2013年第4期98-100,共3页
Construction project management as an important branch of management science has its own characteristics; it was known as an important aspect of project management in the 21 st century. Construction companies now face... Construction project management as an important branch of management science has its own characteristics; it was known as an important aspect of project management in the 21 st century. Construction companies now face a more complex competitive environment and more powerful competitors. In order to compete for the market and living space, Enterprises should be in a strategic height, cultivate long- term competitive advantage. Cost management is a new tool to enhance the competitiveness of enterprises, Popularization and application of Construction project management to the scientific development of the project management made the following three aspects urgent requirement. First. establish a scientific system for the construction project management. Construction Project Management knowledge system is the foundation and needs for Construction Project Management scientific and professional. 展开更多
关键词 cost Control Construction project Management quality Control.
下载PDF
Exploring visual quality of multidimensional time series projections
5
作者 Tanja Munz-Körner Daniel Weiskopf 《Visual Informatics》 EI 2024年第2期27-42,共16页
Dimensionality reduction is often used to project time series data from multidimensional to two-dimensional space to generate visual representations of the temporal evolution.In this context,we address the problem of ... Dimensionality reduction is often used to project time series data from multidimensional to two-dimensional space to generate visual representations of the temporal evolution.In this context,we address the problem of multidimensional time series visualization by presenting a new method to show and handle projection errors introduced by dimensionality reduction techniques on multidimensional temporal data.For visualization,subsequent time instances are rendered as dots that are connected by lines or curves to indicate the temporal dependencies.However,inevitable projection artifacts may lead to poor visualization quality and misinterpretation of the temporal information.Wrongly projected data points,inaccurate variations in the distances between projected time instances,and intersections of connecting lines could lead to wrong assumptions about the original data.We adapt local and global quality metrics to measure the visual quality along the projected time series,and we introduce a model to assess the projection error at intersecting lines.These serve as a basis for our new uncertainty visualization techniques that use different visual encodings and interactions to indicate,communicate,and work with the visualization uncertainty from projection errors and artifacts along the timeline of data points,their connections,and intersections.Our approach is agnostic to the projection method and works for linear and non-linear dimensionality reduction methods alike. 展开更多
关键词 time series Multidimensional data Dimensionality reduction projection errors Visual quality Visual analytics
原文传递
脊柱手术患者Time-out前期病房安全核查的实施 被引量:5
6
作者 赵兴娥 赵丽萍 +1 位作者 谭晓菊 王文丽 《护理学杂志》 CSCD 2016年第10期17-19,共3页
目的有效确认脊柱手术患者术前相关信息,保证手术如期进行。方法将脊柱外科择期手术患者180例,根据入院先后顺序分为对照组(82例)和干预组(98例),对照组按常规完成术前准备,术前1d对手术患者术前相关信息进行核查,干预组在对照组基础上... 目的有效确认脊柱手术患者术前相关信息,保证手术如期进行。方法将脊柱外科择期手术患者180例,根据入院先后顺序分为对照组(82例)和干预组(98例),对照组按常规完成术前准备,术前1d对手术患者术前相关信息进行核查,干预组在对照组基础上按自制的Time-out前期病房安全核查要素对手术所需准备项目进行核查,比较两组手术如期进行率及手术安排满意度。结果干预组手术如期进行率、手术安排满意度显著高于对照组(P<0.05,P<0.01)。结论对脊柱手术患者实施Time-out前期病房安全核查,可有效确认患者术前相关核查的要素,充分发挥手术安全监测、预警作用,保证术前准备到位,利于提高科室整体医疗质量。 展开更多
关键词 脊柱外科 time-out前期 手术安全核查 质量控制 患者安全
下载PDF
Optimal Resource Allocation and Quality of Service Prediction in Cloud 被引量:1
7
作者 Priya Baldoss Gnanasekaran Thangavel 《Computers, Materials & Continua》 SCIE EI 2021年第4期253-265,共13页
In the present scenario,cloud computing service provides on-request access to a collection of resources available in remote system that can be shared by numerous clients.Resources are in self-administration;consequent... In the present scenario,cloud computing service provides on-request access to a collection of resources available in remote system that can be shared by numerous clients.Resources are in self-administration;consequently,clients can adjust their usage according to their requirements.Resource usage is estimated and clients can pay according to their utilization.In literature,the existing method describes the usage of various hardware assets.Quality of Service(QoS)needs to be considered for ascertaining the schedule and the access of resources.Adhering with the security arrangement,any additional code is forbidden to ensure the usage of resources complying with QoS.Thus,all monitoring must be done from the hypervisor.To overcome the issues,Robust Resource Allocation and Utilization(RRAU)approach is developed for optimizing the management of its cloud resources.The work hosts a numerous virtual assets which could be expected under the circumstances and it enforces a controlled degree of QoS.The asset assignment calculation is heuristic,which is based on experimental evaluations,RRAU approach with J48 prediction model reduces Job Completion Time(JCT)by 4.75 s,Make Span(MS)6.25,and Monetary Cost(MC)4.25 for 15,25,35 and 45 resources are compared to the conventional methodologies in cloud environment. 展开更多
关键词 Cloud computing resource utilization robust resource allocation and utilization(RRAU)approach job completion time quality of services monetary cost make span
下载PDF
An Empirical Analysis on the Relationships Between Service Quality and Customer Satisfaction in the Malaysian Healthcare Services
8
作者 Ahmad Othman Liu Yao 《Economics World》 2014年第6期357-368,共12页
The purpose of this paper is to examine the relationships between service quality (SQ) and customer satisfaction (CS) in the Malaysian healthcare system. The study is significant due to the environmental pressures... The purpose of this paper is to examine the relationships between service quality (SQ) and customer satisfaction (CS) in the Malaysian healthcare system. The study is significant due to the environmental pressures such as the demographic changes, the aging of populations, the emergence of new treatments and technologies, and the increased insistence on grater quality of service. A service satisfaction survey was conducted among visitors (either patients or their relatives and friends) that visited hospitals (both public and private) in 10 regions in Malaysia. A total of 1,000 questionnaires were distributed purposively to these visitors, of which 925 questionnaires were returned for further analysis, yielding a response rate of 92.5 percent. The study found that among the eight dimensions of SQ tested, safety measures were not at all significantly related to CS as compared with the other seven dimensions. On a detailed note, the quality satisfaction of customers is very much influenced by infrastructure (0.121), clinical care (0.601), and trustworthiness of the hospitals (0.139). Also as noted, the time satisfaction of customers is influenced by personnel quality (0.102), administrative procedures (0.562), and trustworthiness of the hospitals (0.168). Whilst the cost satisfaction of customers is influenced by administrative procedure (0.101), corporate image (0.130), social responsibility (0.315), and trustworthiness of the hospitals (0.261). On overall, the findings of this study suggest that trustworthiness and administrative procedures are the two most important factors that influence satisfaction of customers that the Malaysian healthcare industry should take a good care of. 展开更多
关键词 service quality (SQ) customer satisfaction (CS) healthcare quality satisfaction time satisfaction cost satisfaction
下载PDF
The Influence of Construction Manager Experience in Project Accomplishment
9
作者 Mamoon Mousa Atout 《Management Studies》 2014年第8期515-532,共18页
Nowadays, construction projects became more complex, where the responsibility of construction manager is to control and plan the project resources in a professional way to handover the project in terms of time, cost, ... Nowadays, construction projects became more complex, where the responsibility of construction manager is to control and plan the project resources in a professional way to handover the project in terms of time, cost, and quality. The aim of this study is to analyze the affect of the long experience of the construction manager on project success; it aims to identify the capability skills that the construction manager should have to complete the project on time. The fmding of this study is to help in understanding the factors that influence the project success through the long experience of the construction manager. 展开更多
关键词 resource scheduling quality control cost control construction methodology detailed working program project materials
下载PDF
基于精细化管理的大型建筑企业工程项目管理研究 被引量:7
10
作者 李萍 《建筑经济》 2024年第4期47-51,共5页
精细化管理是有别于常规管理的一种现代化管理模式,其主要目标在于实现资源的优化配置和最大限度地降低运营成本。在大型建筑企业工程项目管理实践中系统性运用精细化管控措施,可促进工程项目优质高效实施,提高项目盈利能力和企业运行效... 精细化管理是有别于常规管理的一种现代化管理模式,其主要目标在于实现资源的优化配置和最大限度地降低运营成本。在大型建筑企业工程项目管理实践中系统性运用精细化管控措施,可促进工程项目优质高效实施,提高项目盈利能力和企业运行效率,推动企业实现高质量发展。 展开更多
关键词 精细化管理 工程项目管理 降本增效 高质量发展
下载PDF
考虑模糊工序工期的重复性项目时间费用权衡优化 被引量:2
11
作者 邹鑫 陈丹昊 张立辉 《工业工程》 2024年第4期150-160,170,共12页
为了减少不确定性对项目业绩目标的影响,提高进度计划的鲁棒性,研究模糊工序工期下的重复性项目离散时间费用权衡问题。通过模糊风险度量,建立考虑决策者风险偏好的模糊机会约束规划模型,目标是确定所有工序的最优执行模式(即模式列表)... 为了减少不确定性对项目业绩目标的影响,提高进度计划的鲁棒性,研究模糊工序工期下的重复性项目离散时间费用权衡问题。通过模糊风险度量,建立考虑决策者风险偏好的模糊机会约束规划模型,目标是确定所有工序的最优执行模式(即模式列表),从而在满足事先设定的工期延误和费用超支风险水平条件下最小化项目预算。提出模式列表已知条件下,计算模糊总工期和模糊总费用隶属度函数的正向递归过程,并据此设计搜索最优模式列表的基于电磁机制的改进遗传算法(GA-EM)。利用一个实际工程案例验证算法的有效性,并通过数值实验分析算法的计算性能。结果表明,GA-EM能够给出满足给定工期延误和费用超支风险水平的模糊进度计划,预算的平均和最大百分比误差分别不大于0.096%和0.239%。 展开更多
关键词 时间费用权衡 重复性项目 模糊机会约束规划 遗传算法
下载PDF
面向高质量开行的中欧班列开行方案动态优化方法研究
12
作者 罗君培 王莹 胡梦影 《铁道科学与工程学报》 EI CAS CSCD 北大核心 2024年第1期70-81,共12页
为满足中欧班列高质量发展的目标要求,将运力优先释放给高质量货物,基于分类货物对班列开行质量的贡献程度对中欧班列开行方案的优化方法进行研究。首先,将货物按照货物价值、来源班列运营平台、时效性不同进行分类,并设置货物运输效益... 为满足中欧班列高质量发展的目标要求,将运力优先释放给高质量货物,基于分类货物对班列开行质量的贡献程度对中欧班列开行方案的优化方法进行研究。首先,将货物按照货物价值、来源班列运营平台、时效性不同进行分类,并设置货物运输效益系数,计算出包含经济效益及社会效益在内的不同品类货物的综合货物运输效益,用于反映货物运输特性对班列开行质量的影响。其次,根据线路现状选择备选城市作为集结中心,设计出“混合轴辐式”中欧班列开行模式,并加入时间因素构建出时空网络。然后,以货流平衡、班列接续、编组限制、集结中转作业及口岸作业限制等能力为约束条件,建立了以班列开行综合运输效益最优为目标的开行方案优化模型。结合模型特点,进一步设计列生成算法对优化模型进行求解,并利用Gurobi软件对限制主问题和原整数规划问题进行了求解。算例表明,基于“混合轴辐式”网络的“直达+中转”模式,使得运输需求满足率提升了3.56%,优化后的中欧班列开行方案实现了在口岸能力有限的情况下对运营质量较好班列公司的货物以及高价值时间敏感货物进行优先运输,并使其均衡到达口岸以缓解口岸拥堵,顺应中欧班列高质量运输的发展需求。研究可以为中欧班列日常运输计划的制定提供支撑。 展开更多
关键词 中欧班列 时空网络 时间成本 高质量运输
下载PDF
基于正交局部保持映射和成本优化的多变量时间序列早期分类模型
13
作者 袁子璇 翁小清 戈宁振 《计算机应用》 CSCD 北大核心 2024年第6期1832-1841,共10页
时间序列早期分类(ETSC)有两个矛盾的目标:早期性和准确率。分类早期性的实现,总是以牺牲它的准确率为代价。现有基于优化的多变量时间序列(MTS)早期分类方法,虽然在成本函数中考虑了错误分类成本和延迟决策成本,却忽视了MTS数据集样本... 时间序列早期分类(ETSC)有两个矛盾的目标:早期性和准确率。分类早期性的实现,总是以牺牲它的准确率为代价。现有基于优化的多变量时间序列(MTS)早期分类方法,虽然在成本函数中考虑了错误分类成本和延迟决策成本,却忽视了MTS数据集样本之间的局部结构对分类性能的影响。针对这个问题,提出一种基于正交局部保持映射(OLPP)和成本优化的MTS早期分类模型(OLPPMOAE)。首先,使用OLPP将MTS样本前缀映射到低维空间,保持原数据集的局部结构;其次,在低维空间训练一组高斯过程(GP)分类器,生成训练集每个时刻的类概率;最后,使用粒子群优化(PSO)算法从这些类概率中学习停止规则中的最优参数。在6个MTS数据集上的实验结果表明,在早期性基本持平的情况下,OLPPMOAE的准确率显著高于基于成本的R1_C_(lr)(stopping Rule and Cost function with regularization term l_(1)and l_(2))模型,平均准确率能够提升11.33%~15.35%,调和均值(HM)能够提升4.71%~9.01%。因此,所提模型能够以较高的准确率尽早地分类MTS。 展开更多
关键词 多变量时间序列 早期分类 正交局部保持映射 成本优化 高斯过程分类器
下载PDF
人工成本对建筑工程项目的影响和控制策略优化 被引量:1
14
作者 赵佩华 《江苏建材》 2024年第2期132-134,共3页
人工成本增加影响建筑工程项目进度管理与质量管理,为提升人才素质与业务水平、协调并稳定劳务关系,降低施工质量问题发生概率,实现项目管理工作的升级,确保项目如期保质交付使用。基于对某施工企业参与A工程与B工程施工建设期间人工成... 人工成本增加影响建筑工程项目进度管理与质量管理,为提升人才素质与业务水平、协调并稳定劳务关系,降低施工质量问题发生概率,实现项目管理工作的升级,确保项目如期保质交付使用。基于对某施工企业参与A工程与B工程施工建设期间人工成本的产生情况的分析,提出人工成本的优化管控对策。 展开更多
关键词 建筑工程项目 人工成本 施工进度 施工质量
下载PDF
信息化管理平台下造价咨询项目实施进度跟踪与质量管控策略 被引量:1
15
作者 周安定 《价值工程》 2024年第2期29-31,共3页
为了提高造价咨询项目实施进度跟踪效率与质量管控水平,在信息化管理平台下,开展了造价咨询项目实施进度跟踪与质量管控策略研究。分析信息化管理平台的功能与特点,基于其功能与特点,构建集信息采集、存储、处理、分析、共享和管理于一... 为了提高造价咨询项目实施进度跟踪效率与质量管控水平,在信息化管理平台下,开展了造价咨询项目实施进度跟踪与质量管控策略研究。分析信息化管理平台的功能与特点,基于其功能与特点,构建集信息采集、存储、处理、分析、共享和管理于一体的信息化管理平台,在此基础上,提出了以制定造价咨询项目实施计划、建立进度跟踪体系、实施进度跟踪与调整、规范化造价咨询项目审计工作、建立质量管控机制为核心的项目实施进度跟踪与质量管控策略,为项目实施进度跟踪与质量管控提供基础保障。 展开更多
关键词 信息化管理平台 造价咨询项目 实施进度跟踪 质量管控
下载PDF
招标控制价对工程项目质量和成本的双重影响评估 被引量:1
16
作者 卜伟 《工程造价管理》 2024年第2期64-68,共5页
在当前经济与环境背景下,政府工程项目的成本效益与质量控制尤为重要。招标控制价作为一种重要的成本控制手段,对于确保工程项目在预算内完成并满足质量标准具有不可忽视的作用。然而,招标控制价的设定与实施过程中存在的不足,如过度设... 在当前经济与环境背景下,政府工程项目的成本效益与质量控制尤为重要。招标控制价作为一种重要的成本控制手段,对于确保工程项目在预算内完成并满足质量标准具有不可忽视的作用。然而,招标控制价的设定与实施过程中存在的不足,如过度设计、施工方案不合理等问题,常常导致资源浪费与投资效率低下。文章旨在探讨招标控制价对工程项目的成本与质量的影响,并通过案例分析,揭示优化设计、施工方案的重要性;同时,还探讨土石方平衡与石方利用的策略,以减少不必要的投资浪费,促进工程项目的经济与环境可持续性;最后提出了一系列实现成本与质量双重优化的策略,为政府工程项目管理提供新的视角和方法。 展开更多
关键词 招标控制价 工程项目质量 工程成本管理 土石方平衡 石方利用 节约投资
下载PDF
建筑工程变更管理对工程造价的影响分析
17
作者 李保参 《建筑与装饰》 2024年第16期83-85,共3页
本文旨在分析建筑工程变更管理对工程造价的影响,探讨其在成本控制、工期延误和质量保障等方面的重要性和潜在影响。本研究以建筑工程变更管理对工程造价影响的分析为主题,深入探讨其影响机制和管理策略,以期为建筑工程管理提供参考和... 本文旨在分析建筑工程变更管理对工程造价的影响,探讨其在成本控制、工期延误和质量保障等方面的重要性和潜在影响。本研究以建筑工程变更管理对工程造价影响的分析为主题,深入探讨其影响机制和管理策略,以期为建筑工程管理提供参考和借鉴。 展开更多
关键词 建筑工程变更管理 工程造价 成本控制 工期延误 质量保障
下载PDF
基于TDABC成本分析法的某试验室成本核算研究
18
作者 曹磊 王毅 《中国科技纵横》 2024年第13期116-120,125,共6页
本文通过对国内某检测公司试验部门的成本核算进行研究,探索时间驱动作业成本法(TDABC)在试验测试项目成本核算中的适应性。以G检测公司P试验部门的相关测试业务项目为研究对象,应用TDABC方法计算相关项目的成本,并将其与现行成本方法... 本文通过对国内某检测公司试验部门的成本核算进行研究,探索时间驱动作业成本法(TDABC)在试验测试项目成本核算中的适应性。以G检测公司P试验部门的相关测试业务项目为研究对象,应用TDABC方法计算相关项目的成本,并将其与现行成本方法进行对比分析。研究结果显示,与现行成本方法相比,TDABC方法核算的结果更接近实际成本。该方法还能为测试项目的价格制定、试验室人员和设备的工作负荷优化调整、市场对外报价的折扣方案提供有效的数据支撑。 展开更多
关键词 成本核算 测试项目成本 时间驱动作业成本法
下载PDF
建筑工程造价节约与质量保证的平衡研究
19
作者 梁接建 《工程设计与施工》 2024年第5期10-12,共3页
建筑工程造价节约及质量保证是建筑工程领域的一大核心问题。本研究以此为出发点,针对实际工程案例对造价节约及质量保证进行了深入研究。在严格保证工程质量的前提下,通过合理的管理手段,工程造价的节约是可行的。针对目前建筑工程造... 建筑工程造价节约及质量保证是建筑工程领域的一大核心问题。本研究以此为出发点,针对实际工程案例对造价节约及质量保证进行了深入研究。在严格保证工程质量的前提下,通过合理的管理手段,工程造价的节约是可行的。针对目前建筑工程造价提升与质量下降的问题,本研究根据实证分析结果,提出了基于工程项目管理的理论模型,包括工程成本控制、工程质量控制及其交互影响关系。研究还发现,通过严格执行工程设计规范、采用先进施工工艺和技术、合理优化施工班组、强化工程监理等方式,可以在保证工程质量的同时,有效地节约工程造价。本研究针对建筑工程造价与质量之间的平衡关系进行了深入探讨,研究结果为建筑工程管理实践提供了理论依据。 展开更多
关键词 建筑工程造价 质量保证 工程项目管理 工程设计规范 工程监理
下载PDF
EPC建筑工程项目设计优化探究——以龙岩数字经济产业园项目为例
20
作者 黄建英 《福建建筑》 2024年第6期130-133,共4页
随着建筑业的快速发展,EPC工程项目管理模式在建筑工程中的应用日趋成熟。设计优化作为EPC项目工程设计阶段的重要环节,对于提升工程质量、控制成本、保障工期,具有显著的作用。结合龙岩数字经济产业园产城融合项目实例,探讨分析设计优... 随着建筑业的快速发展,EPC工程项目管理模式在建筑工程中的应用日趋成熟。设计优化作为EPC项目工程设计阶段的重要环节,对于提升工程质量、控制成本、保障工期,具有显著的作用。结合龙岩数字经济产业园产城融合项目实例,探讨分析设计优化在EPC项目中的实际应用,总结了优化的方法、策略及其对项目各阶段的影响,以此探究设计优化对EPC项目的效能作用。 展开更多
关键词 EPC项目 设计优化 成本控制 质量提升
下载PDF
上一页 1 2 33 下一页 到第
使用帮助 返回顶部