By analyzing the influence of pollution factors in each process on the environmentally sensitive area in construction and operation of oil and gas infrastructure,main problems were obtained:delimitation and implementa...By analyzing the influence of pollution factors in each process on the environmentally sensitive area in construction and operation of oil and gas infrastructure,main problems were obtained:delimitation and implementation of three control lines in land space planning,relevant environmental protection laws and regulations not perfect and specific,delimitation of environmentally sensitive area lack of sufficient demonstration,"conditional permission to pass"not be raised to an explicit provision,urban energy corridor planning not fully implement the concept of environmental protection,and the idea of adjacent spatial planning not be implemented yet.Moreover,it put forward countermeasures and suggestions for the construction department of oil and gas infrastructure.展开更多
Although shale gas resources are abundant in China,commercial discoveries have not been made before the discovery of Fuling Shale Gas Field.SINOPEC has done lots of theoretical and technological studies on marine shal...Although shale gas resources are abundant in China,commercial discoveries have not been made before the discovery of Fuling Shale Gas Field.SINOPEC has done lots of theoretical and technological studies on marine shale gas development in China.Research shows shale gas has dynamic accumulations with early preservation and late reconstruction and proposes high-quality shale developed in deep-water shelf as the base and good preservation conditions as the key factor for shale gas accumulation.Key technologies and facilities were developed for geophysical survey of shale gas,design and optimization of shale gas development,drilling and completion of horizontal wells,and fracturing stimulation.As the first and largest shale gas field in China,the discovery and successful development of Fuling Shale Gas Filed has made China the first country to achieve large-scale development of shale gas after North America.By August 2017,Fuling Shale Gas Field had declared 6008.14×10^(8)m^(3) proven reserves,76.8×10^(8)m^(3) production capacity and 133.9×10^(8)m^(3) cumulative production.The construction of Fuling Shale Gas Field with high level,high speed and high quality has been a good example of shale gas development in China.Its successful experiences can be used to other fields and play an important role in optimizing energy structure and improving environment.展开更多
文摘By analyzing the influence of pollution factors in each process on the environmentally sensitive area in construction and operation of oil and gas infrastructure,main problems were obtained:delimitation and implementation of three control lines in land space planning,relevant environmental protection laws and regulations not perfect and specific,delimitation of environmentally sensitive area lack of sufficient demonstration,"conditional permission to pass"not be raised to an explicit provision,urban energy corridor planning not fully implement the concept of environmental protection,and the idea of adjacent spatial planning not be implemented yet.Moreover,it put forward countermeasures and suggestions for the construction department of oil and gas infrastructure.
基金The work was supported by the National Science and Technology Major Project of China(No.2016ZX05060).
文摘Although shale gas resources are abundant in China,commercial discoveries have not been made before the discovery of Fuling Shale Gas Field.SINOPEC has done lots of theoretical and technological studies on marine shale gas development in China.Research shows shale gas has dynamic accumulations with early preservation and late reconstruction and proposes high-quality shale developed in deep-water shelf as the base and good preservation conditions as the key factor for shale gas accumulation.Key technologies and facilities were developed for geophysical survey of shale gas,design and optimization of shale gas development,drilling and completion of horizontal wells,and fracturing stimulation.As the first and largest shale gas field in China,the discovery and successful development of Fuling Shale Gas Filed has made China the first country to achieve large-scale development of shale gas after North America.By August 2017,Fuling Shale Gas Field had declared 6008.14×10^(8)m^(3) proven reserves,76.8×10^(8)m^(3) production capacity and 133.9×10^(8)m^(3) cumulative production.The construction of Fuling Shale Gas Field with high level,high speed and high quality has been a good example of shale gas development in China.Its successful experiences can be used to other fields and play an important role in optimizing energy structure and improving environment.