Following rapid infrastructure development and industrialization, the problems of water pollution and water shortage have become more severe. Whether there is safe drinking water in cities has attracted wide attention...Following rapid infrastructure development and industrialization, the problems of water pollution and water shortage have become more severe. Whether there is safe drinking water in cities has attracted wide attention.The ecological risk management of drinking water project is an important means of ensuring the safety of a drinking water source. Based on ecological risk assessment and management theories, this paper establishes an ecological risk management model and assessment system with the aim of providing theoretical guidance and scientific basis for formulating a policy on the safety and protection of drinking water sources in a city. Kunming is one of the cities plagued by severe water shortage in China. Its ecological risk management of drinking water has attracted the attention of both the local government and the public.Using Kunming as the case study, this paper conducts a comparative analysis and assessment on three major reservoirs that face ecological risks. It highlights the existing problems and gives helpful suggestions.展开更多
In order to analyze the indispensability of the organization management chain of the South-to-North Water Diversion Project (SNWDP), two basic forms (series connection state and mixed state of both series connectio...In order to analyze the indispensability of the organization management chain of the South-to-North Water Diversion Project (SNWDP), two basic forms (series connection state and mixed state of both series connection and parallel connection) of the organization management chain can be abstracted. The indispensability of each form has been studied and is described in this paper. Through analysis of the reliability of the two basic forms, reliability models of the organization management chain in the series connection state and the mixed state of both series connection and parallel connection have been set up.展开更多
The modernization of water conservancy project management is a complicated engineering system involving a management system, a management method, management personnel, the exertion of social, economic, and ecological ...The modernization of water conservancy project management is a complicated engineering system involving a management system, a management method, management personnel, the exertion of social, economic, and ecological effects, and so on. However, indices for evaluating the modernization of water conservancy project management are usually unobtainable in practical applications. Conducting appropriate extension of the classical rough set theory and then applying it to an incomplete information system are the key to the application of the rough set theory Based on analysis of some extended rough set models in incomplete information systems, a rough set model based on the θ-improved limited tolerance relation is put forward. At the same time, upper approximation and lower approximation are defined under this improved relation. According to the evaluation index system and management practices, the threshold for θ is defined. An example study indicates the practicability and maneuverability of the model.展开更多
In this paper, we conduct research on the present situation and improvement strategy of the water conservancy project construction quality management based on quality efficiency equilibrium theory. Water conservancy e...In this paper, we conduct research on the present situation and improvement strategy of the water conservancy project construction quality management based on quality efficiency equilibrium theory. Water conservancy engineering construction enterprises should refer to oneself circumstance, and the characteristics of the water conservancy project, determine the quality objectives of specific quality assurance plan and the related measures, clear implementation content, methods and effects. Strictly control the factors influencing the water conservancy engineering quality of many aspects, in the process of the water conservancy project construction, to establish a meet the requirements of the technical process and quality standards, operation procedures. Establish the strict appraisal system, continuous improvement and improve the level of construction technique and technology. Establish strict quality assurance system and quality responsibility system, each division, subdivisional work will comprehensively implement in place management to ensure the engineering quality.展开更多
According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculatio...According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculation of penalty for delay of the bidding section construction period with the critical path method, we studied the effects of contractor-induced delay of the bidding section construction period in detail, including the effects on the construction period of the bidding section itself, the earliest start times of the next bidding section and other subsequent bidding sections, and the construction period of the program, and then constructed a penalty model for delay of the bidding section construction period from the perspective of programs. Using the penalty model, we conducted a practical analysis of penalty for delay of the construction period of the Baoying station program in the South-to-North Water Diversion Project. The model can help determine the amount of penalty for delay of the construction period in bidding sections scientifically and reasonably,展开更多
Three Gorges Project (TGP),the largest water resources and hydropower project in the world with huge scale and complex techniques,has great comprehensive benefits mainly in flood control,power generation and navigatio...Three Gorges Project (TGP),the largest water resources and hydropower project in the world with huge scale and complex techniques,has great comprehensive benefits mainly in flood control,power generation and navigation improvement.Through 17-year construction and practice,the project has been successfully completed.Some valuable experience from the successful construction of TGP has been gained for the management system and mechanism of hydropower project construction in China.Its construction management mode produces important influences on the management system of domestic capital construction.With combination of the construction management practice of TGP,the characteristics of management system and mechanism are summarized,and the suggestions on current hydropower development system and construction management mode are put forward.展开更多
China has started shifting from relying on supply management to demand management strategy in addressing its water shortage problems.Water option,a financial derivative for water commodity,has been utilized to manage ...China has started shifting from relying on supply management to demand management strategy in addressing its water shortage problems.Water option,a financial derivative for water commodity,has been utilized to manage water demands in the United States and Europe since the 1990 s but is still novel to China.In this study we analyzed the pros and cons of China’s existing system for water rights transfers and proposed an alternative,flexible trading instrument-water options for China.Incorporating the uncertainty to water option pricing,this study first conducted an empirical analysis of the water option in the water-receiving area of the Hanjiang-Weihe River Transfer Project of China,and then evaluated the benefits of the water option applications.Results show that water option trading can bring water cost saving and increase the potential industrially added value for industrial enterprises in the receiving area,and trading of short-and-medium term water options is more favorable than the long-term water options trading.The novel water option trading proposed in this study,once verified through pilot studies,will be helpful in addressing water shortage problems in China.展开更多
From the point of cost-benefit flow and with the Six Green Projects in China as the case and background, it is criticized that the current natural resource and environmental management and the policies in China have s...From the point of cost-benefit flow and with the Six Green Projects in China as the case and background, it is criticized that the current natural resource and environmental management and the policies in China have some problems unsolved since the model of cost-benefit flow is still centralized and mainly in an administrative way in spite of many efforts made theoretically and practically. It is suggested that a new model based on market-oriented economy from the point of cost-benefit flow with Six Green Projects Management and Policies System consist of complete natural reserve (NR). Management system included environmental nature reserves in addition to biodiversity nature reserve, paid using nature resources, an environmental conservation and construction industry and renewable resource production incentive system that turn the direct administration and operation to management and services. The detail figure of the new model of cost-benefit flow is provided and the main points related are discussed in this paper.展开更多
A VM (value management) approach was developed that better suits the culture and the context of the SPS (Saudi Public Sector). This approach provided a comprehensive assessment of VM at institutional, organization...A VM (value management) approach was developed that better suits the culture and the context of the SPS (Saudi Public Sector). This approach provided a comprehensive assessment of VM at institutional, organizational and project levels. This paper illustrates the procedures that were used to validate the developed VM approach. For the institutional and organizational levels, the VM approach was validated by conducting telephone interviews with three experts from three organizations that use VM and with two senior managers from the MOF (Ministry of Finance). Mainly, it was found that the MOF should be supported by experts to set up a centre of excellence that can set VM policy, guidelines and standards for the promotion of VM in the SPS, in order to ensure achieving value for money spent in SPS projects. The developed VM approach, as it would be applied at the project level, was presented to 11 experts, all of whom completed a validation questionnaire and presented their comments. Subsequently, the questionnaires were analyzed and the VM approach was amended to reflect the inputs provided by these experts. It was concluded that VM should be applied at least twice on SPS projects. Firstly, it is to review and structure strategic and project briefs to sort out soft issues, and secondly, it is to optimize project designs and sort out hard issues.展开更多
基金financially supported by the Frontiers Research Support Program(QY2015025)of the Faculty of Management&Economics,Kunming University of Science and Technology
文摘Following rapid infrastructure development and industrialization, the problems of water pollution and water shortage have become more severe. Whether there is safe drinking water in cities has attracted wide attention.The ecological risk management of drinking water project is an important means of ensuring the safety of a drinking water source. Based on ecological risk assessment and management theories, this paper establishes an ecological risk management model and assessment system with the aim of providing theoretical guidance and scientific basis for formulating a policy on the safety and protection of drinking water sources in a city. Kunming is one of the cities plagued by severe water shortage in China. Its ecological risk management of drinking water has attracted the attention of both the local government and the public.Using Kunming as the case study, this paper conducts a comparative analysis and assessment on three major reservoirs that face ecological risks. It highlights the existing problems and gives helpful suggestions.
基金supported by the National Science and Technology Plan(Major Project of the Eleventh Five-Year Plan,Grant No.2006BAB04A13)
文摘In order to analyze the indispensability of the organization management chain of the South-to-North Water Diversion Project (SNWDP), two basic forms (series connection state and mixed state of both series connection and parallel connection) of the organization management chain can be abstracted. The indispensability of each form has been studied and is described in this paper. Through analysis of the reliability of the two basic forms, reliability models of the organization management chain in the series connection state and the mixed state of both series connection and parallel connection have been set up.
基金supported by the Fundamental Research Funds for the Central Universities(Grant No.2013B102008)the Open Fund of the Yellow River Committee(Grant No.2011535012)
文摘The modernization of water conservancy project management is a complicated engineering system involving a management system, a management method, management personnel, the exertion of social, economic, and ecological effects, and so on. However, indices for evaluating the modernization of water conservancy project management are usually unobtainable in practical applications. Conducting appropriate extension of the classical rough set theory and then applying it to an incomplete information system are the key to the application of the rough set theory Based on analysis of some extended rough set models in incomplete information systems, a rough set model based on the θ-improved limited tolerance relation is put forward. At the same time, upper approximation and lower approximation are defined under this improved relation. According to the evaluation index system and management practices, the threshold for θ is defined. An example study indicates the practicability and maneuverability of the model.
文摘In this paper, we conduct research on the present situation and improvement strategy of the water conservancy project construction quality management based on quality efficiency equilibrium theory. Water conservancy engineering construction enterprises should refer to oneself circumstance, and the characteristics of the water conservancy project, determine the quality objectives of specific quality assurance plan and the related measures, clear implementation content, methods and effects. Strictly control the factors influencing the water conservancy engineering quality of many aspects, in the process of the water conservancy project construction, to establish a meet the requirements of the technical process and quality standards, operation procedures. Establish the strict appraisal system, continuous improvement and improve the level of construction technique and technology. Establish strict quality assurance system and quality responsibility system, each division, subdivisional work will comprehensively implement in place management to ensure the engineering quality.
基金supported by the National Science and Technology Plan of China (Major Project of the Eleventh Five-Year Plan, Grant No. 2006BAB04A13)the Philosophy and Social Science Fund of Education Department of Jiangsu Province (Grant No. 07SJD630006)+1 种基金the Third Key Discipline (Techno-Economics and Management) of the Project 211the Key Disciplines of Jiangsu Province (Engineering and Project Management)
文摘According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculation of penalty for delay of the bidding section construction period with the critical path method, we studied the effects of contractor-induced delay of the bidding section construction period in detail, including the effects on the construction period of the bidding section itself, the earliest start times of the next bidding section and other subsequent bidding sections, and the construction period of the program, and then constructed a penalty model for delay of the bidding section construction period from the perspective of programs. Using the penalty model, we conducted a practical analysis of penalty for delay of the construction period of the Baoying station program in the South-to-North Water Diversion Project. The model can help determine the amount of penalty for delay of the construction period in bidding sections scientifically and reasonably,
文摘Three Gorges Project (TGP),the largest water resources and hydropower project in the world with huge scale and complex techniques,has great comprehensive benefits mainly in flood control,power generation and navigation improvement.Through 17-year construction and practice,the project has been successfully completed.Some valuable experience from the successful construction of TGP has been gained for the management system and mechanism of hydropower project construction in China.Its construction management mode produces important influences on the management system of domestic capital construction.With combination of the construction management practice of TGP,the characteristics of management system and mechanism are summarized,and the suggestions on current hydropower development system and construction management mode are put forward.
基金Under the auspices of the Ministry of Education of Humanities and Social Science Project(No.17XJA790005)Grant of Shaanxi Social Science Association&Shaanxi Statistics Bureau(No.2019TJ053)。
文摘China has started shifting from relying on supply management to demand management strategy in addressing its water shortage problems.Water option,a financial derivative for water commodity,has been utilized to manage water demands in the United States and Europe since the 1990 s but is still novel to China.In this study we analyzed the pros and cons of China’s existing system for water rights transfers and proposed an alternative,flexible trading instrument-water options for China.Incorporating the uncertainty to water option pricing,this study first conducted an empirical analysis of the water option in the water-receiving area of the Hanjiang-Weihe River Transfer Project of China,and then evaluated the benefits of the water option applications.Results show that water option trading can bring water cost saving and increase the potential industrially added value for industrial enterprises in the receiving area,and trading of short-and-medium term water options is more favorable than the long-term water options trading.The novel water option trading proposed in this study,once verified through pilot studies,will be helpful in addressing water shortage problems in China.
文摘From the point of cost-benefit flow and with the Six Green Projects in China as the case and background, it is criticized that the current natural resource and environmental management and the policies in China have some problems unsolved since the model of cost-benefit flow is still centralized and mainly in an administrative way in spite of many efforts made theoretically and practically. It is suggested that a new model based on market-oriented economy from the point of cost-benefit flow with Six Green Projects Management and Policies System consist of complete natural reserve (NR). Management system included environmental nature reserves in addition to biodiversity nature reserve, paid using nature resources, an environmental conservation and construction industry and renewable resource production incentive system that turn the direct administration and operation to management and services. The detail figure of the new model of cost-benefit flow is provided and the main points related are discussed in this paper.
文摘A VM (value management) approach was developed that better suits the culture and the context of the SPS (Saudi Public Sector). This approach provided a comprehensive assessment of VM at institutional, organizational and project levels. This paper illustrates the procedures that were used to validate the developed VM approach. For the institutional and organizational levels, the VM approach was validated by conducting telephone interviews with three experts from three organizations that use VM and with two senior managers from the MOF (Ministry of Finance). Mainly, it was found that the MOF should be supported by experts to set up a centre of excellence that can set VM policy, guidelines and standards for the promotion of VM in the SPS, in order to ensure achieving value for money spent in SPS projects. The developed VM approach, as it would be applied at the project level, was presented to 11 experts, all of whom completed a validation questionnaire and presented their comments. Subsequently, the questionnaires were analyzed and the VM approach was amended to reflect the inputs provided by these experts. It was concluded that VM should be applied at least twice on SPS projects. Firstly, it is to review and structure strategic and project briefs to sort out soft issues, and secondly, it is to optimize project designs and sort out hard issues.