Time effect of wet drilling pile is investigated through the static load experiment on pile No. 22 of Guanhe Bridge. Post-grouting under pile tip is adopted in the project. To study the bearing performance of the pile...Time effect of wet drilling pile is investigated through the static load experiment on pile No. 22 of Guanhe Bridge. Post-grouting under pile tip is adopted in the project. To study the bearing performance of the pile, the self-balanced method is used and two load cells are assembled in the pile body. The experiments are carried out before and after post-grouting. The upper part of the pile is not influenced by post-grouting under the pile tip. Experimental results of the upper part of the pile show that the bearing capacity and the rigidity of wet drilling pile increase with time passing on. Analysis results show the time effect of wet drilling pile is influenced by many factors, such as alteration of stress field around pile, characteristics of soil around pile, variety of mud cake, and property of residue under pile tip.展开更多
In the past two decades, numerous large-diameter rock-socketed piles were constructed in China to support foundations of skyscrapers, great bridges or to retain soil in potential geological hazard areas. However, dril...In the past two decades, numerous large-diameter rock-socketed piles were constructed in China to support foundations of skyscrapers, great bridges or to retain soil in potential geological hazard areas. However, drilling large-diameter rock-socketed pile holes with conventional drilling method such as rotary drilling or cable tool drilling is time-consuming and the cost is usually very high. In order to drill large-diameter rocksocketed pile holes faster at relatively low cost, the FGC15A large-diameter DTH air hammer drilling system was developed in 1987 and was given the second-clasa award by Ministry of Geology and Mineral Resources in 1991. Since it was innovated the drilling system has been used in more than twenty important and tough pro- jects on land, and wonderful results were acquired. At the same time the large-diameter DTH air hammer drilling system was improved continuously. The FGC15D is the latest version of the technique.展开更多
The pile working load depends on the imperfections which may be taken place in pile-soil system, during pile construction, among many other factors. This subject attracted the researcher's attention world wide in the...The pile working load depends on the imperfections which may be taken place in pile-soil system, during pile construction, among many other factors. This subject attracted the researcher's attention world wide in the last decades. Types of imperfections either geotechnical or structural are documented in literature and well explained. Nevertheless, the influence of these imperfections in pile load calculations is still ambiguous. The work presented herein is devoted to study soil disturbance during construction of piles using continuous flight auger, CFA. The study of soil disturbance due to drilling needs some evidence. The source of this evidence is field observations collected from four different construction sites, which are documented in this paper. The study concluded that the disturbed zone of soil by CFA has a conical shape and extending laterally to a distance equivalent to ten times of the pile diameter around the auger at the cutting bits and has an inclined surface of4:1 (vertical : horizontal). Furthermore excess pore water pressure was induced in soil in the vicinity of pile drilling. Due to this excess pore water pressure, 3.5% to 6.5% of piles constructed by CFA showed percolation of water from the top of the piles through fresh concrete. Also, subsidence of fresh concrete in pile hole was recorded in few of the constructed piles. Pile loading tests showed that the percolation of water and/or subsidence of fresh concrete have not appreciable influence on the load-displacement characteristics of the piles. Moreover, percolation of water at pile heads.展开更多
The mode of load and deformation of directional drilling string and the expression of trigonometric series of deflection equation are established by means of elastic deformation energy and of the vertical and horizont...The mode of load and deformation of directional drilling string and the expression of trigonometric series of deflection equation are established by means of elastic deformation energy and of the vertical and horizontal bending. A calculation formula for natural frequency of horizontal resonance and rotational speed is derived based on the calculation method by Ritz, with which analysis is made for the cause and affecting factors of the excessive abrasion of heavy-weight drill pipe in high-angle holes so as to provide reference and basis for rational selection of drilling parameters and drilling tools in the future high-angle directional drilling.展开更多
The objective of this investigation was to study the behavior of deep pile caps and the ultimate load-carrying capacity. Four 1/10 scaled models of nine-pile caps were cast and tested on vertical loads to failure. The...The objective of this investigation was to study the behavior of deep pile caps and the ultimate load-carrying capacity. Four 1/10 scaled models of nine-pile caps were cast and tested on vertical loads to failure. The destruction shapes of pile caps,the correlation between load and displacement,and the internal stresses were analyzed systematically. The results demonstrated that the failures of all the four models are resulted from punching shear; the internal flow of the forces in nine-pile caps can be approximated by "strut-and-tie" model. Furthermore,the failure loads of these specimens were predicted by some of the present design methods and the calculated results were compared with the experimental loads. The comparative results also indicated that the "strut-and-tie" model is a more reasonable design method for deep pile caps design.展开更多
Compared with the in-place pile, the pore-forming pouring pile is more simple and convenient, with a wider range of construction. In the actual construction process, it is able to pass through complex bottom layer and...Compared with the in-place pile, the pore-forming pouring pile is more simple and convenient, with a wider range of construction. In the actual construction process, it is able to pass through complex bottom layer and water layer underground without very high requirements in equipment. The actual bearing capacity of single pile is very strong, so that it can be better to adapt to the actual needs of different scales or the different geological conditions in building. And it has been promoted and used greatly in building construction work [1]. This paper introduces the concept of the pore-forming pouring pile technology, analyzes the pore-forming construction technology and the pile construction technology, then talks about prevention problems of the pore-forming pouring pile construction in House Building Project, at last draws a conclusion that the pore-forming pouring pile technology is the most basic construction technology and is the most effective and convenient way of construction.展开更多
文摘Time effect of wet drilling pile is investigated through the static load experiment on pile No. 22 of Guanhe Bridge. Post-grouting under pile tip is adopted in the project. To study the bearing performance of the pile, the self-balanced method is used and two load cells are assembled in the pile body. The experiments are carried out before and after post-grouting. The upper part of the pile is not influenced by post-grouting under the pile tip. Experimental results of the upper part of the pile show that the bearing capacity and the rigidity of wet drilling pile increase with time passing on. Analysis results show the time effect of wet drilling pile is influenced by many factors, such as alteration of stress field around pile, characteristics of soil around pile, variety of mud cake, and property of residue under pile tip.
文摘In the past two decades, numerous large-diameter rock-socketed piles were constructed in China to support foundations of skyscrapers, great bridges or to retain soil in potential geological hazard areas. However, drilling large-diameter rock-socketed pile holes with conventional drilling method such as rotary drilling or cable tool drilling is time-consuming and the cost is usually very high. In order to drill large-diameter rocksocketed pile holes faster at relatively low cost, the FGC15A large-diameter DTH air hammer drilling system was developed in 1987 and was given the second-clasa award by Ministry of Geology and Mineral Resources in 1991. Since it was innovated the drilling system has been used in more than twenty important and tough pro- jects on land, and wonderful results were acquired. At the same time the large-diameter DTH air hammer drilling system was improved continuously. The FGC15D is the latest version of the technique.
文摘The pile working load depends on the imperfections which may be taken place in pile-soil system, during pile construction, among many other factors. This subject attracted the researcher's attention world wide in the last decades. Types of imperfections either geotechnical or structural are documented in literature and well explained. Nevertheless, the influence of these imperfections in pile load calculations is still ambiguous. The work presented herein is devoted to study soil disturbance during construction of piles using continuous flight auger, CFA. The study of soil disturbance due to drilling needs some evidence. The source of this evidence is field observations collected from four different construction sites, which are documented in this paper. The study concluded that the disturbed zone of soil by CFA has a conical shape and extending laterally to a distance equivalent to ten times of the pile diameter around the auger at the cutting bits and has an inclined surface of4:1 (vertical : horizontal). Furthermore excess pore water pressure was induced in soil in the vicinity of pile drilling. Due to this excess pore water pressure, 3.5% to 6.5% of piles constructed by CFA showed percolation of water from the top of the piles through fresh concrete. Also, subsidence of fresh concrete in pile hole was recorded in few of the constructed piles. Pile loading tests showed that the percolation of water and/or subsidence of fresh concrete have not appreciable influence on the load-displacement characteristics of the piles. Moreover, percolation of water at pile heads.
文摘The mode of load and deformation of directional drilling string and the expression of trigonometric series of deflection equation are established by means of elastic deformation energy and of the vertical and horizontal bending. A calculation formula for natural frequency of horizontal resonance and rotational speed is derived based on the calculation method by Ritz, with which analysis is made for the cause and affecting factors of the excessive abrasion of heavy-weight drill pipe in high-angle holes so as to provide reference and basis for rational selection of drilling parameters and drilling tools in the future high-angle directional drilling.
基金National Key Project of Scientific and Technical Supporting Programs funded by Ministry of Science &Technology of China (No. 2006BAG04B00)
文摘The objective of this investigation was to study the behavior of deep pile caps and the ultimate load-carrying capacity. Four 1/10 scaled models of nine-pile caps were cast and tested on vertical loads to failure. The destruction shapes of pile caps,the correlation between load and displacement,and the internal stresses were analyzed systematically. The results demonstrated that the failures of all the four models are resulted from punching shear; the internal flow of the forces in nine-pile caps can be approximated by "strut-and-tie" model. Furthermore,the failure loads of these specimens were predicted by some of the present design methods and the calculated results were compared with the experimental loads. The comparative results also indicated that the "strut-and-tie" model is a more reasonable design method for deep pile caps design.
文摘Compared with the in-place pile, the pore-forming pouring pile is more simple and convenient, with a wider range of construction. In the actual construction process, it is able to pass through complex bottom layer and water layer underground without very high requirements in equipment. The actual bearing capacity of single pile is very strong, so that it can be better to adapt to the actual needs of different scales or the different geological conditions in building. And it has been promoted and used greatly in building construction work [1]. This paper introduces the concept of the pore-forming pouring pile technology, analyzes the pore-forming construction technology and the pile construction technology, then talks about prevention problems of the pore-forming pouring pile construction in House Building Project, at last draws a conclusion that the pore-forming pouring pile technology is the most basic construction technology and is the most effective and convenient way of construction.