The synchronous construction of the secondary lining during the boring of large-diameter shield faces challenges such as the design of the lining jumbo,the high requirements on the performance for the lining jumbo,the...The synchronous construction of the secondary lining during the boring of large-diameter shield faces challenges such as the design of the lining jumbo,the high requirements on the performance for the lining jumbo,the organization of the construction activities in the small and confined area,the horizontal transportation for shield boring and high safety management requirements.A super-long invert lining construction jumbo,as well as the matching California switch,is developed,which provides solution for the confliction between the invert lining construction and the horizontal transportation.The procedure and method for the synchronous operation of the shield boring and the secondary lining are developed by referring to the synchronous construction of the secondary lining during the boring of the TBMs in hard rocks.Due to the adoption of the synchronous operation of the shield boring and the secondary lining,the construction period is shortened and the construction cost is reduced.The paper can provide reference for the synchronous construction of the secondary lining in similar projects in the future.展开更多
In the Davey-MacKay(DM) construction,the inner decoder treats unknown transmitted bits as random independent substitution errors. It limits the synchronization capability of the inner decoder, and thus weakens the err...In the Davey-MacKay(DM) construction,the inner decoder treats unknown transmitted bits as random independent substitution errors. It limits the synchronization capability of the inner decoder, and thus weakens the error-correcting capability of the DM construction.In order to improve the performance of the DM construction, an iterative decoding scheme is proposed, which iteratively utilizes the more accurate estimates of transmitted codewords. In the proposed scheme, the estimated average bit error rates and the estimated low-density parity-check(LDPC) codewords from the outer decoder are fed back into the inner decoder to update the synchronization process. Simulation results show that the proposed iterative decoding scheme significantly outperforms the traditional DM construction.展开更多
Based on a comprehensive analysis of the structure and existing problems ofthe gear pump, provided a structure principle of a synchronous gear pump.The discussionsfocused on the working principle, construction feature...Based on a comprehensive analysis of the structure and existing problems ofthe gear pump, provided a structure principle of a synchronous gear pump.The discussionsfocused on the working principle, construction features and finite element analysis ofthe hydraulic gear.The research indicates that the new pump has such advantages aslower noise, better distributed flow and a high work pressure, and it can be widely used inhydraulic systems.展开更多
文摘The synchronous construction of the secondary lining during the boring of large-diameter shield faces challenges such as the design of the lining jumbo,the high requirements on the performance for the lining jumbo,the organization of the construction activities in the small and confined area,the horizontal transportation for shield boring and high safety management requirements.A super-long invert lining construction jumbo,as well as the matching California switch,is developed,which provides solution for the confliction between the invert lining construction and the horizontal transportation.The procedure and method for the synchronous operation of the shield boring and the secondary lining are developed by referring to the synchronous construction of the secondary lining during the boring of the TBMs in hard rocks.Due to the adoption of the synchronous operation of the shield boring and the secondary lining,the construction period is shortened and the construction cost is reduced.The paper can provide reference for the synchronous construction of the secondary lining in similar projects in the future.
基金supported in part by National Natural Science Foundation of China(61671324)the Director’s Funding from Qingdao National Laboratory for Marine Science and Technology
文摘In the Davey-MacKay(DM) construction,the inner decoder treats unknown transmitted bits as random independent substitution errors. It limits the synchronization capability of the inner decoder, and thus weakens the error-correcting capability of the DM construction.In order to improve the performance of the DM construction, an iterative decoding scheme is proposed, which iteratively utilizes the more accurate estimates of transmitted codewords. In the proposed scheme, the estimated average bit error rates and the estimated low-density parity-check(LDPC) codewords from the outer decoder are fed back into the inner decoder to update the synchronization process. Simulation results show that the proposed iterative decoding scheme significantly outperforms the traditional DM construction.
文摘Based on a comprehensive analysis of the structure and existing problems ofthe gear pump, provided a structure principle of a synchronous gear pump.The discussionsfocused on the working principle, construction features and finite element analysis ofthe hydraulic gear.The research indicates that the new pump has such advantages aslower noise, better distributed flow and a high work pressure, and it can be widely used inhydraulic systems.