Product quality and operation cost control obtain increasing emphases in modern chemical system engineering. To improve the fault detection power of the partial least square (PLS) method for quality control, a new QRP...Product quality and operation cost control obtain increasing emphases in modern chemical system engineering. To improve the fault detection power of the partial least square (PLS) method for quality control, a new QRPV statistic is proposed in terms of the VP (variable importance in projection) indices of monitored process variables, which is significantly advanced over and different from the conventional Q statistic. QRPV is calculated only by the residuals of the remarkable process variables (RPVs). Therefore, it is the dominant relation between quality and RPV not all process variables (as in the case of the conventional PLS) that is monitored by this new VP-PLS (VPLS) method. The combination of QRPV and T2 statistics is applied to the quality and cost control of the Tennessee Eastman (TE) process, and weak faults can be detected as quickly as possible. Consequently, the product quality of TE process is guaranteed and operation costs are reduced.展开更多
Objective:To investigate the effectiveness of using quality control circle(QCC)techniques to reduce the cost of non-priced consumables in medical oncology.Methods:Analytic statistics were compiled on the performance a...Objective:To investigate the effectiveness of using quality control circle(QCC)techniques to reduce the cost of non-priced consumables in medical oncology.Methods:Analytic statistics were compiled on the performance appraisal form.Aiming at the key points of improvement with respect to the excess cost of non-valuable consumables,the reasons were analyzed,and corresponding measures were formulated to compare the cost before and after the improvement.Results:After the QCC activity,the cost of non-priced consumables decreased from RMB 6.57/bed day to RMB 3.96/bed day.Conclusion:QCC has effectively reduced the cost of non-priced consumables in the oncology department,and it is worthy of promotion.展开更多
A memory-type control chart utilizes previous information for chart construction.An example of a memory-type chart is an exponentially-weighted moving average(EWMA)control chart.The EWMA control chart is well-known an...A memory-type control chart utilizes previous information for chart construction.An example of a memory-type chart is an exponentially-weighted moving average(EWMA)control chart.The EWMA control chart is well-known and widely employed by practitioners for monitoring small and moderate process mean shifts.Meanwhile,the EWMA median chart is robust against outliers.In light of this,the economic model of the EWMA and EWMA median control charts are commonly considered.This study aims to investigate the effect of cost parameters on the out-of-control average run lengthðARL_(1)Þin implementing EWMA and EWMA median control charts.The economic model was used to compute the ARL_(1) parameter.The 14 input parameters were identified and the analysis was carried out based on the one-parameter-at-a-time basis.When the input parameters change based on a predetermined percentage,the ARL_(1) is affected.According to the results of the EWMA chart,nine input parameters had an effect andfive input parameters had no effect on the ARL_(1) parameter.Further,only seven of the 14 input parameters had an effect on the ARL_(1) of the EWMA median chart.However,the effect of each input parameter on the ARL_(1) was different.Moreover,the ARL_(1) for the EWMA median chart was smaller than the EWMA chart.This analysis is crucial to observe and determine the input parameters that have a significant impact on the ARL_(1) of the EMWA and EWMA median control charts.Hence,practitioners can obtain an overview of the influence of the input parameters on the ARL_(1) when implementing the EWMA and EWMA median control charts.展开更多
Construction project management as an important branch of management science has its own characteristics; it was known as an important aspect of project management in the 21 st century. Construction companies now face...Construction project management as an important branch of management science has its own characteristics; it was known as an important aspect of project management in the 21 st century. Construction companies now face a more complex competitive environment and more powerful competitors. In order to compete for the market and living space, Enterprises should be in a strategic height, cultivate long- term competitive advantage. Cost management is a new tool to enhance the competitiveness of enterprises, Popularization and application of Construction project management to the scientific development of the project management made the following three aspects urgent requirement. First. establish a scientific system for the construction project management. Construction Project Management knowledge system is the foundation and needs for Construction Project Management scientific and professional.展开更多
For economical reasons, wind turbine systems must be located in favourable sites generating a higher pro- ductivity. These are often located in areas with weak electric grid infrastructures. The constraints related to...For economical reasons, wind turbine systems must be located in favourable sites generating a higher pro- ductivity. These are often located in areas with weak electric grid infrastructures. The constraints related to this type of grids limit the penetration levels of wind energy. These constraints are mainly related to power quality in the grid as well as the economical aspects of the project. In this study, we take into account the slow voltage variations and the flicker phenomenon. The models used are based on the development of a set of relations derived from engineering knowledge related to both technical and economical points of view. The maximal penetration level of a fixed speed wind turbine system is determined for a given grid. The power control has been investigated to improve wind turbine system integration. Obtained results show the necessity to adapt technological choices to the requirements of weaker grids. Penetration levels and wind turbine cost may be greatly improved using variable speed systems.展开更多
Background: After more than a decade of the nursing profession contending that healthcare reform based almost exclusively on cost cutting was creating an array of serious ethical issues for nurses, healthcare organiza...Background: After more than a decade of the nursing profession contending that healthcare reform based almost exclusively on cost cutting was creating an array of serious ethical issues for nurses, healthcare organizations and other providers are now facing increasing demands primarily from payers to demonstrate improvement in both quality of care and patient experience along with continued cost reduction. Research Question: Have efforts by healthcare organizations to comply with these recently imposed requirements influenced the ethical environment faced by nurses and nurse leaders and if so, how? Materials and Methods: Data for assessing the current ethical environment was gathered with a close-ended survey mailed in October 2012 to a random sample of 3000 members of the American Organization of Nurse Executives. Results and Discussion: Statistical analysis of the data and comparison with the findings of a similar study conducted in 2000 indicated that along with five highly rated issues in the earlier study attributed largely to economic constraints imposed by healthcare organizations, the top-10 key ethical issues today included five issues primarily attributable to interprofessional conflict. Conclusion: Given the success of many ongoing efforts aimed at weakening these key sources of ethical conflict that have blocked many proposals to improve the quality of care, opportunities should arise for the nursing profession to more fully achieve its goals of improving the quality of care, safety and patient satisfaction and enhancing nurses’ work environments essential to that effort.展开更多
Water pollution control planning for the Taizi River watershed,a typical Chinese case study,is presented in this paper. Based on comprehensive analysis.water quality in the watershed was assessed and predicated;water ...Water pollution control planning for the Taizi River watershed,a typical Chinese case study,is presented in this paper. Based on comprehensive analysis.water quality in the watershed was assessed and predicated;water quality models for the river and reservoir were built;and function of water bodies and environmental assimilative capacity were determined ;and then the planning for industrial pollution sources and concentrated sewage treatment were made respectively.展开更多
在医疗支付面临老龄化社会与医保可持续性挑战的当下,疾病诊断相关分组(diagnosis related group,DRG)不仅是支付管理工具,且涉及预算管理、医疗质量安全等多个方面,构建了全面的医疗管理工具组套。然而,如何进一步发掘DRG支付模式的潜...在医疗支付面临老龄化社会与医保可持续性挑战的当下,疾病诊断相关分组(diagnosis related group,DRG)不仅是支付管理工具,且涉及预算管理、医疗质量安全等多个方面,构建了全面的医疗管理工具组套。然而,如何进一步发掘DRG支付模式的潜力、激发内生动力、充分发挥其正向激励作用,仍需不断探索和实践。本文从诊疗规范化、指南本土化、医源性损害最小化、经济学评价普及化等维度展开,阐述在DRG支付模式下如何优化诊疗流程、规范诊疗行为,以及应对平衡成本控制与临床技术创新的挑战与机遇。展开更多
文摘Product quality and operation cost control obtain increasing emphases in modern chemical system engineering. To improve the fault detection power of the partial least square (PLS) method for quality control, a new QRPV statistic is proposed in terms of the VP (variable importance in projection) indices of monitored process variables, which is significantly advanced over and different from the conventional Q statistic. QRPV is calculated only by the residuals of the remarkable process variables (RPVs). Therefore, it is the dominant relation between quality and RPV not all process variables (as in the case of the conventional PLS) that is monitored by this new VP-PLS (VPLS) method. The combination of QRPV and T2 statistics is applied to the quality and cost control of the Tennessee Eastman (TE) process, and weak faults can be detected as quickly as possible. Consequently, the product quality of TE process is guaranteed and operation costs are reduced.
文摘Objective:To investigate the effectiveness of using quality control circle(QCC)techniques to reduce the cost of non-priced consumables in medical oncology.Methods:Analytic statistics were compiled on the performance appraisal form.Aiming at the key points of improvement with respect to the excess cost of non-valuable consumables,the reasons were analyzed,and corresponding measures were formulated to compare the cost before and after the improvement.Results:After the QCC activity,the cost of non-priced consumables decreased from RMB 6.57/bed day to RMB 3.96/bed day.Conclusion:QCC has effectively reduced the cost of non-priced consumables in the oncology department,and it is worthy of promotion.
基金funded by the Universiti Kebangsaan Malaysia,Geran Galakan Penyelidikan,GGP-2020-040.
文摘A memory-type control chart utilizes previous information for chart construction.An example of a memory-type chart is an exponentially-weighted moving average(EWMA)control chart.The EWMA control chart is well-known and widely employed by practitioners for monitoring small and moderate process mean shifts.Meanwhile,the EWMA median chart is robust against outliers.In light of this,the economic model of the EWMA and EWMA median control charts are commonly considered.This study aims to investigate the effect of cost parameters on the out-of-control average run lengthðARL_(1)Þin implementing EWMA and EWMA median control charts.The economic model was used to compute the ARL_(1) parameter.The 14 input parameters were identified and the analysis was carried out based on the one-parameter-at-a-time basis.When the input parameters change based on a predetermined percentage,the ARL_(1) is affected.According to the results of the EWMA chart,nine input parameters had an effect andfive input parameters had no effect on the ARL_(1) parameter.Further,only seven of the 14 input parameters had an effect on the ARL_(1) of the EWMA median chart.However,the effect of each input parameter on the ARL_(1) was different.Moreover,the ARL_(1) for the EWMA median chart was smaller than the EWMA chart.This analysis is crucial to observe and determine the input parameters that have a significant impact on the ARL_(1) of the EMWA and EWMA median control charts.Hence,practitioners can obtain an overview of the influence of the input parameters on the ARL_(1) when implementing the EWMA and EWMA median control charts.
文摘Construction project management as an important branch of management science has its own characteristics; it was known as an important aspect of project management in the 21 st century. Construction companies now face a more complex competitive environment and more powerful competitors. In order to compete for the market and living space, Enterprises should be in a strategic height, cultivate long- term competitive advantage. Cost management is a new tool to enhance the competitiveness of enterprises, Popularization and application of Construction project management to the scientific development of the project management made the following three aspects urgent requirement. First. establish a scientific system for the construction project management. Construction Project Management knowledge system is the foundation and needs for Construction Project Management scientific and professional.
基金supported by National Natural Science Foundation of China(61304256)Zhejiang Provincial Natural Science Foundation of China(LQ13F030013)+4 种基金Project of the Education Department of Zhejiang Province(Y201327006)Young Researchers Foundation of Zhejiang Provincial Top Key Academic Discipline of Mechanical Engineering and Zhejiang Sci-Tech University Key Laboratory(ZSTUME01B15)New Century 151 Talent Project of Zhejiang Province521 Talent Project of Zhejiang Sci-Tech UniversityYoung and Middle-aged Talents Foundation of Zhejiang Provincial Top Key Academic Discipline of Mechanical Engineering
文摘For economical reasons, wind turbine systems must be located in favourable sites generating a higher pro- ductivity. These are often located in areas with weak electric grid infrastructures. The constraints related to this type of grids limit the penetration levels of wind energy. These constraints are mainly related to power quality in the grid as well as the economical aspects of the project. In this study, we take into account the slow voltage variations and the flicker phenomenon. The models used are based on the development of a set of relations derived from engineering knowledge related to both technical and economical points of view. The maximal penetration level of a fixed speed wind turbine system is determined for a given grid. The power control has been investigated to improve wind turbine system integration. Obtained results show the necessity to adapt technological choices to the requirements of weaker grids. Penetration levels and wind turbine cost may be greatly improved using variable speed systems.
文摘Background: After more than a decade of the nursing profession contending that healthcare reform based almost exclusively on cost cutting was creating an array of serious ethical issues for nurses, healthcare organizations and other providers are now facing increasing demands primarily from payers to demonstrate improvement in both quality of care and patient experience along with continued cost reduction. Research Question: Have efforts by healthcare organizations to comply with these recently imposed requirements influenced the ethical environment faced by nurses and nurse leaders and if so, how? Materials and Methods: Data for assessing the current ethical environment was gathered with a close-ended survey mailed in October 2012 to a random sample of 3000 members of the American Organization of Nurse Executives. Results and Discussion: Statistical analysis of the data and comparison with the findings of a similar study conducted in 2000 indicated that along with five highly rated issues in the earlier study attributed largely to economic constraints imposed by healthcare organizations, the top-10 key ethical issues today included five issues primarily attributable to interprofessional conflict. Conclusion: Given the success of many ongoing efforts aimed at weakening these key sources of ethical conflict that have blocked many proposals to improve the quality of care, opportunities should arise for the nursing profession to more fully achieve its goals of improving the quality of care, safety and patient satisfaction and enhancing nurses’ work environments essential to that effort.
文摘Water pollution control planning for the Taizi River watershed,a typical Chinese case study,is presented in this paper. Based on comprehensive analysis.water quality in the watershed was assessed and predicated;water quality models for the river and reservoir were built;and function of water bodies and environmental assimilative capacity were determined ;and then the planning for industrial pollution sources and concentrated sewage treatment were made respectively.
文摘在医疗支付面临老龄化社会与医保可持续性挑战的当下,疾病诊断相关分组(diagnosis related group,DRG)不仅是支付管理工具,且涉及预算管理、医疗质量安全等多个方面,构建了全面的医疗管理工具组套。然而,如何进一步发掘DRG支付模式的潜力、激发内生动力、充分发挥其正向激励作用,仍需不断探索和实践。本文从诊疗规范化、指南本土化、医源性损害最小化、经济学评价普及化等维度展开,阐述在DRG支付模式下如何优化诊疗流程、规范诊疗行为,以及应对平衡成本控制与临床技术创新的挑战与机遇。