In the construction of municipal road drainage projects,pipe jacking construction is a relatively common construction method.This construction technology can avoid a large amount of excavation work,improve drainage co...In the construction of municipal road drainage projects,pipe jacking construction is a relatively common construction method.This construction technology can avoid a large amount of excavation work,improve drainage construction efficiency,avoid large-scale damage to the road surface,and exert small traffic impact.Therefore,it is currently widely used in drainage construction,but judging from the current actual application situation,there are still many problems that require further improvement.This article mainly analyzes the advantages of and current technical problems in pipe jacking construction technology in detail,explores corresponding solutions,and lays a foundation for the optimization of municipal road drainage engineering construction.展开更多
By using site observation data and establishing 3D model using ANSYS software, this paper has discussed the strain change of stratum stress during process of jacking-in and the impact of machine head on ground surface...By using site observation data and establishing 3D model using ANSYS software, this paper has discussed the strain change of stratum stress during process of jacking-in and the impact of machine head on ground surface under different frontal resistances. Analysis of the two cases shows that soil pressure reaches its maximum point when the soil is right above machine head, and soil stress will gradually decline when machine head passes over it. It also shows that impact brought by pipe-jacking construction on stress change of the surrounding soil is limited. The thesis suggest that road surface should be consolidated and soil condition be improved before construction to prevent loss and disaster caused by road surface deformation, jacking force can be increased so that jacking efficiency can be enhanced when ground stratum is well filled with soil, but the frontal resistance facing machine head should be equal to surrounding soil pressure in order to avoid rise of ground surface.展开更多
In Japan when urban infrastructures need to be constructed, the difficulty of utilizing the ground or shallow strata will lead to a more frequent use of the deep strata. The common construction methods are open-cut, p...In Japan when urban infrastructures need to be constructed, the difficulty of utilizing the ground or shallow strata will lead to a more frequent use of the deep strata. The common construction methods are open-cut, pipe jacking, and shield methods. In recent years, a new pipe jacking method has been established that can be adapted to 20 m below the ground or more. Using this method, the drivage machine and the jacking pipe continue to move an underground until the completion of the driving. Therefore an over-cutting area (so-called tail-void) must be formed to lower the friction between the ground and the pipe. The tail-void is filled with lubrications. However, because the stress release from the ground continues to advance when the tail-void is formed, hence there are some challenges required to cope with the stability of the surrounding ground. In order to utilize the pipe jacking method in the deeper strata layers, the theory, analysis and installation of tail-void have to be systemized, and such systematic data must be stored. Therefore, the conditions of tail-void in the deep pipe jacking method are discussed using numerical analyses.展开更多
A steel underground pipeline with a diameter of 2.4 m and a total length of 3,617 m(plate thickness of 26 mm)has been constructed in a city in central Hubei,and the engineering,procurement,and construction(EPC)project...A steel underground pipeline with a diameter of 2.4 m and a total length of 3,617 m(plate thickness of 26 mm)has been constructed in a city in central Hubei,and the engineering,procurement,and construction(EPC)project has been lifted from the upstream channel to supplement water to the downstream lake inside the city.Through preliminary geological survey data,site topographic and geomorphic survey,urban construction,as well as the requirements of the construction party,the preliminary arrangement of working wells and receiving wells as well as the selection and customization of pipe jacking machines have been proposed.Frequency conversion motor and remote monitoring technology are adopted for geotechnical change and long-distance pipe jacking.Through detailed survey,the rock and soil change section as well as gradual change conditions have been determined,the accuracy of construction mechanics calculation and construction operation control have improved,the basis and analysis basis are provided,and some experiences in construction operation are summarized.展开更多
文摘In the construction of municipal road drainage projects,pipe jacking construction is a relatively common construction method.This construction technology can avoid a large amount of excavation work,improve drainage construction efficiency,avoid large-scale damage to the road surface,and exert small traffic impact.Therefore,it is currently widely used in drainage construction,but judging from the current actual application situation,there are still many problems that require further improvement.This article mainly analyzes the advantages of and current technical problems in pipe jacking construction technology in detail,explores corresponding solutions,and lays a foundation for the optimization of municipal road drainage engineering construction.
基金the Science and Technology Foundation of Sichuan Department of Land and Resources(SCDLR0609)
文摘By using site observation data and establishing 3D model using ANSYS software, this paper has discussed the strain change of stratum stress during process of jacking-in and the impact of machine head on ground surface under different frontal resistances. Analysis of the two cases shows that soil pressure reaches its maximum point when the soil is right above machine head, and soil stress will gradually decline when machine head passes over it. It also shows that impact brought by pipe-jacking construction on stress change of the surrounding soil is limited. The thesis suggest that road surface should be consolidated and soil condition be improved before construction to prevent loss and disaster caused by road surface deformation, jacking force can be increased so that jacking efficiency can be enhanced when ground stratum is well filled with soil, but the frontal resistance facing machine head should be equal to surrounding soil pressure in order to avoid rise of ground surface.
文摘In Japan when urban infrastructures need to be constructed, the difficulty of utilizing the ground or shallow strata will lead to a more frequent use of the deep strata. The common construction methods are open-cut, pipe jacking, and shield methods. In recent years, a new pipe jacking method has been established that can be adapted to 20 m below the ground or more. Using this method, the drivage machine and the jacking pipe continue to move an underground until the completion of the driving. Therefore an over-cutting area (so-called tail-void) must be formed to lower the friction between the ground and the pipe. The tail-void is filled with lubrications. However, because the stress release from the ground continues to advance when the tail-void is formed, hence there are some challenges required to cope with the stability of the surrounding ground. In order to utilize the pipe jacking method in the deeper strata layers, the theory, analysis and installation of tail-void have to be systemized, and such systematic data must be stored. Therefore, the conditions of tail-void in the deep pipe jacking method are discussed using numerical analyses.
文摘A steel underground pipeline with a diameter of 2.4 m and a total length of 3,617 m(plate thickness of 26 mm)has been constructed in a city in central Hubei,and the engineering,procurement,and construction(EPC)project has been lifted from the upstream channel to supplement water to the downstream lake inside the city.Through preliminary geological survey data,site topographic and geomorphic survey,urban construction,as well as the requirements of the construction party,the preliminary arrangement of working wells and receiving wells as well as the selection and customization of pipe jacking machines have been proposed.Frequency conversion motor and remote monitoring technology are adopted for geotechnical change and long-distance pipe jacking.Through detailed survey,the rock and soil change section as well as gradual change conditions have been determined,the accuracy of construction mechanics calculation and construction operation control have improved,the basis and analysis basis are provided,and some experiences in construction operation are summarized.