On the basis of cut and projection description of quasicrystals, a method for calculating section projection diagrams of quasicrystals is developed and applied to decagonal quasicrystals. Firstly, a section projecti...On the basis of cut and projection description of quasicrystals, a method for calculating section projection diagrams of quasicrystals is developed and applied to decagonal quasicrystals. Firstly, a section projection diagram parallel to the quasiperiodic plane of perfect decagonal quasicrystal is calculated. By using the existing elastic displacement field formulae, section projection diagrams parallel to the quasiperiodic plane of a decagonal quasicrystal containing a straight dislocation along periodic direction have been calculated when only phason strain and both phason and phonon strains are introduced respectively.展开更多
According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculatio...According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculation of penalty for delay of the bidding section construction period with the critical path method, we studied the effects of contractor-induced delay of the bidding section construction period in detail, including the effects on the construction period of the bidding section itself, the earliest start times of the next bidding section and other subsequent bidding sections, and the construction period of the program, and then constructed a penalty model for delay of the bidding section construction period from the perspective of programs. Using the penalty model, we conducted a practical analysis of penalty for delay of the construction period of the Baoying station program in the South-to-North Water Diversion Project. The model can help determine the amount of penalty for delay of the construction period in bidding sections scientifically and reasonably,展开更多
文摘On the basis of cut and projection description of quasicrystals, a method for calculating section projection diagrams of quasicrystals is developed and applied to decagonal quasicrystals. Firstly, a section projection diagram parallel to the quasiperiodic plane of perfect decagonal quasicrystal is calculated. By using the existing elastic displacement field formulae, section projection diagrams parallel to the quasiperiodic plane of a decagonal quasicrystal containing a straight dislocation along periodic direction have been calculated when only phason strain and both phason and phonon strains are introduced respectively.
基金supported by the National Science and Technology Plan of China (Major Project of the Eleventh Five-Year Plan, Grant No. 2006BAB04A13)the Philosophy and Social Science Fund of Education Department of Jiangsu Province (Grant No. 07SJD630006)+1 种基金the Third Key Discipline (Techno-Economics and Management) of the Project 211the Key Disciplines of Jiangsu Province (Engineering and Project Management)
文摘According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculation of penalty for delay of the bidding section construction period with the critical path method, we studied the effects of contractor-induced delay of the bidding section construction period in detail, including the effects on the construction period of the bidding section itself, the earliest start times of the next bidding section and other subsequent bidding sections, and the construction period of the program, and then constructed a penalty model for delay of the bidding section construction period from the perspective of programs. Using the penalty model, we conducted a practical analysis of penalty for delay of the construction period of the Baoying station program in the South-to-North Water Diversion Project. The model can help determine the amount of penalty for delay of the construction period in bidding sections scientifically and reasonably,