With the gradual acceleration of the urbanization process,the construction industry has been developing rapidly.As the key link to ensure the quality and safety of the project,construction management and construction ...With the gradual acceleration of the urbanization process,the construction industry has been developing rapidly.As the key link to ensure the quality and safety of the project,construction management and construction quality control are of great significance to enhance the competitiveness of construction enterprises and realize sustainable development.In this paper,the effective strategy of construction management and the effective strategy of construction quality control will be discussed in depth,aiming at providing useful management and quality control strategies for construction enterprises.展开更多
In view of the current development of power engineering management,traditional management methods can no longer be applied to the management of current power engineering work.Therefore,it is necessary to innovate and ...In view of the current development of power engineering management,traditional management methods can no longer be applied to the management of current power engineering work.Therefore,it is necessary to innovate and optimize existing project management modes,transform traditional management concepts and models,focus on addressing the problems in project management and improve management.This paper mainly analyzes the project management mode and power engineering management.展开更多
Three-dimensional visualization technology converts engineering design drawings and data into graphics or images, realizes virtual reality perception of simulated users in future construction scene, enhances the inter...Three-dimensional visualization technology converts engineering design drawings and data into graphics or images, realizes virtual reality perception of simulated users in future construction scene, enhances the interaction between project management and technical personnel and engineering construction achievement, and provides intuitive, flexible and strong realistic experience for project management. It can effectively improve the level of project communication, and assist the needs of project construction planning management, training, exhibition, etc. As a tool to help improve project management skills, it has good application effect and prospects.展开更多
Many organizations are struggling to provide high bandwidth and reliable internet connectivity at their branch offices and business locations and getting the most out of their operational expense.The need for internet...Many organizations are struggling to provide high bandwidth and reliable internet connectivity at their branch offices and business locations and getting the most out of their operational expense.The need for internet connectivity at any branch offices and business locations is not a luxury anymore but is a necessity.Let us try to understand how to plan and document the SDWAN(Software Defined-Wide Area Network)implementation in an organization.We will try to understand why it is essential to implement the new technology instead of investing in the existing MPLS(Multi-Protocol label switching)by taking an example of a retail organization.Methods:This project/research was performed using the abilities of Software Defined Network Technology and options available in MPLS(Multi-Protocol Label Switching).The Technical Project management principles were adopted as per PMI(Project Management Institute)waterfall methodology.Results/Conclusion:SDWAN technology provides an effective replacement of MPLS network connection for providing WAN connectivity for our office locations.It is essential to follow a documented process for appropriate vendor selection based on the available features and other listed attributes in the article.To be successful in the implementation it is essential to perform a POC(Proof of Concept)in a controlled environment and validate results.SDWAN provides better network performance and improves reliability as the links operate in active-active function.展开更多
The Duifene teaching platform is a product of various teaching methods,which greatly improves the traditional teaching method.This article introduces the function and characteristics of a blended teaching platform as ...The Duifene teaching platform is a product of various teaching methods,which greatly improves the traditional teaching method.This article introduces the function and characteristics of a blended teaching platform as well as its application for histology and embryology modules.In addition,the advantages and disadvantages of blended teaching method is also discussed.The application of this teaching platform for Construction Project Management modules encourages students to be more enthusiastic and interested toward learning.This allows a more convenient and rapid teacher-student and student-student interaction thereby improving the teaching and learning experiences.展开更多
One of the most important tasks of security is the quality of the project substation substation construction project management, construction project management, including project bidding and engineering, electrical e...One of the most important tasks of security is the quality of the project substation substation construction project management, construction project management, including project bidding and engineering, electrical engineering and civil construction, engineering, quality control, safety management and supervision costs control, on-site supervision over the links, these links chain, indivisible, so long as a part of the management problems, will lead the entire construction project management effectiveness be affected, so it must be every link control and management work done, in order to guarantee the quality of the entire substation, in order to make security of supply substations, electrical safety and vital interests of users are protected. In this paper, the author details the three aspects substation construction management of the project, namely the concept of substation engineering, project management and construction safety, through these three aspects, the author analyzes the construction project management substation existing problems, To solve these problems and issues proposed some measures and construction process that need attention. It launched separately from the design, schedule, quality and other aspects of security and research, and in the course of the study stressed the importance of coordination between elements of construction and construction sectors as well as cooperation between the construction, explains the importance of the project cost control.展开更多
In this paper,we discuss the influence of economic,environmental and legal policies of the state on the management of investment projects in the area of industrial construction in Poland.Our empirical study relies on ...In this paper,we discuss the influence of economic,environmental and legal policies of the state on the management of investment projects in the area of industrial construction in Poland.Our empirical study relies on conducting a questionnaire survey.A total of 158 Polish companies dealing with industrial construction took part in the survey.Then,the collected questionnaires were subjected to a thorough analysis and interpretation,with the use of a method called the exploratory factor analysis(EFA).Our research reveals the key factors influencing successful investment project management in the Polish industrial construction sector.These factors have been identified as the“availability of technology in a stable political system”,“stability of the economic and tax systems”,“stable social system policy,stability and transparency of the legal system”and a“well-targeted environmental policy”.A key conclusion that can be drawn from our study is that an efficient management of investment projects in the industrial construction industry is significantly influenced by properly shaped and stable economic,environmental,and legal policies of the state.展开更多
With the continuous development of the construction industry, the scale and volume of the construction project is expanding. And the project management of the construction project still has the big risk problem which ...With the continuous development of the construction industry, the scale and volume of the construction project is expanding. And the project management of the construction project still has the big risk problem which influenced by many factors. These risks will not only bring unnecessary interference to the construction of the project, but also may jeopardize the safety of people's life and property. It is the focus of this article to do a good job in risk aversion in the management of construction projects.展开更多
Construction project management as an important branch of management science has its own characteristics; it was known as an important aspect of project management in the 21 st century. Construction companies now face...Construction project management as an important branch of management science has its own characteristics; it was known as an important aspect of project management in the 21 st century. Construction companies now face a more complex competitive environment and more powerful competitors. In order to compete for the market and living space, Enterprises should be in a strategic height, cultivate long- term competitive advantage. Cost management is a new tool to enhance the competitiveness of enterprises, Popularization and application of Construction project management to the scientific development of the project management made the following three aspects urgent requirement. First. establish a scientific system for the construction project management. Construction Project Management knowledge system is the foundation and needs for Construction Project Management scientific and professional.展开更多
The construction industry is acutely aware of the need to improve its management process. Currently,construction management is facing four major schools of thoughts. This paper reports the recent study results,the aim...The construction industry is acutely aware of the need to improve its management process. Currently,construction management is facing four major schools of thoughts. This paper reports the recent study results,the aim of which was to compare these approaches. The focus will be on the questions:What is the theory root for this school of thoughts? What is the position of planning? What are the techniques used or recommended by each of these schools of thoughts in managing construction projects? Recommendations are then given through a deep discussion of the capability of each approach in managing today's highly complex construction project.展开更多
Construction project management is an important aspect of civil engineering construction. How to use scientific and efficient methods to effectively man</span><span style="font-family:Verdana;">a...Construction project management is an important aspect of civil engineering construction. How to use scientific and efficient methods to effectively man</span><span style="font-family:Verdana;">age construction projects is the focus of construction project development un</span><span style="font-family:Verdana;">der the current situation. This article discusses the application of fuzzy mathematics in construction project management. The study found that in the process of construction project management, it was found that a single fuzzy </span><span style="font-family:Verdana;">mathematical method was difficult to adapt to the current complex and cha</span><span style="font-family:Verdana;">ngeable construction projects. Combining fuzzy mathematics with other man</span><span style="font-family:Verdana;">agement methods and computer applications can better simplify complex</span><span style="font-family:Verdana;"> things, reduce human subjectivity, increase calculation speed, and achieve a combination of qualitative and quantitative research;selection of optimization schemes and risk assessment, etc. All have a good effect, and can better </span><span style="font-family:Verdana;">deal with possible or uncertain things and emergencies in the process of pr</span><span style="font-family:Verdana;">oject management. At the same time, combining fuzzy mathematics with heuristic algorithms or meta-heuristic algorithms can make research more objective, improve management efficiency and calculation speed.展开更多
In order to realize the standardization and normalization of environmental protection project management.This paper uses the literature method to study the current status of the existing project management mode,and po...In order to realize the standardization and normalization of environmental protection project management.This paper uses the literature method to study the current status of the existing project management mode,and points out the problems:lack of a sound project management system,insufficient information application of project management,and unclear decentralization in project management;on this basis,this paper proposes optimization strategies from the aspects of perfecting the engineering project management system,clarifying the allocation of project management authority,and strengthening the construction of engineering project management information.And put forward the future development trend of project engineering management,on the basis of two mainstream management modes of BOT(Build-Operate-Transfer)and EPC(Engineering Procurement Construction),build a standardized project management platform to achieve intelligent management.Realize intelligent management of engineering project management to achieve standardization and standardization,greatly improving the efficiency of project management.展开更多
The construction quality and efficiency of construction engineering are directly related to people's daily life.Therefore,construction enterprises must keep pace with the times and actively introduce advanced tech...The construction quality and efficiency of construction engineering are directly related to people's daily life.Therefore,construction enterprises must keep pace with the times and actively introduce advanced technical means into architectural design,project construction,and management,so as to ensure the quality and safety of construction to the maximum extent.The application of BIM not only improves the efficiency of construction and construction quality,but also realizes the control of construction cost.This study explores and analyzes the advantages of BIM as well as proposes application strategies of BIM in architectural design,project construction,and management,hoping to contribute to the smooth construction of construction engineering.展开更多
With the entrance into WTO, the Chinese supervision enterprises face the serious challenge never existed before. Comparing with other type enterprises Chinese supervision enterprises nature of China are the same as pr...With the entrance into WTO, the Chinese supervision enterprises face the serious challenge never existed before. Comparing with other type enterprises Chinese supervision enterprises nature of China are the same as project management companies in connotation and service scope in nature. They have much superiority in development of the project management work. Through comparing and analyzing the special feature between Chinese supervision enterprise and international project management enterprise, this paper points out the gap between them, and table the proposal of they transforming to the project management enterprises.展开更多
Development of the global economy makes modem enterprises confront challenges of efficient managements for large projects and complex processes. Projects are typically managed in rather special manners. On the contrar...Development of the global economy makes modem enterprises confront challenges of efficient managements for large projects and complex processes. Projects are typically managed in rather special manners. On the contrary, there exist many methodologies for product process management to achieve consistency and continuance. However, processes often lack flexibility offered by projects. This paper dis~ the relationship of conceptual characteristics between process and project, gives low-level details to tackle the difference between them, and proposes an enterprise process modeling method for project management. An integrated environment is designed to support the method from which both project management and process management can receive benefits and conform to the limitations.展开更多
The paper researched and analyzed the characteristics, deficiencies and reasons of a management system of a software enterprise project to design a software project management system based on CMMI 1.2, thus helping th...The paper researched and analyzed the characteristics, deficiencies and reasons of a management system of a software enterprise project to design a software project management system based on CMMI 1.2, thus helping the enterprise to improve development and management efficiency of software project and reduce the risks and costs on project devel- opment. It studied CMMI model version 1.3 which is recently released by SEI, analyzed its characteristics and told the difference between version 1.2 and version 1.3. In addition, an improvement proposal and a solution of the software project management system were given from multiple perspectives.展开更多
Aircraft on ground or down-time for its maintenance is a clear loss in revenue for an airline operation. With never ending competition and growing operating costs of aircraft, airlines continuously need to explore opp...Aircraft on ground or down-time for its maintenance is a clear loss in revenue for an airline operation. With never ending competition and growing operating costs of aircraft, airlines continuously need to explore opportunities to reduce the aircraft down-time in order to remain sustainable. Due to round the clock operation feature of scheduled airlines, aircraft maintenance operations are generally carried out using traditional management methodologies instead of considering it as a project. Though aircraft heavy maintenance checks consist of several major tasks that can last from few weeks to a year, the maintenance organisations do not adopt modern project management methodologies. Therefore, this paper models a heavy maintenance check of an Airbus aircraft as a typical project and adopts contemporary project management methodology to explore the possibility of reducing the downtime. To this end, a case study has been done at an aircraft maintenance company to analyse the potential of this project management method in aircraft maintenance industry.展开更多
Various industries today rely on the support of electromechanical equipment,expanding its scope of application and leading to an increase in electromechanical installation projects.However,due to the high level of exp...Various industries today rely on the support of electromechanical equipment,expanding its scope of application and leading to an increase in electromechanical installation projects.However,due to the high level of expertise required and the potential risks involved,it is crucial to emphasize safety management during construction.This paper delves into the significance of construction safety management for electromechanical installation projects,identifies common problems encountered during construction,and proposes solutions.This analysis aims to provide relevant personnel with essential guidance and references for managing electromechanical installation projects safely.展开更多
The assessment of the Project Management Maturity (PMM) level shows the company how good it is at managing projects. This measurement can be performed in different domains of expertise. In the article, the issue of ...The assessment of the Project Management Maturity (PMM) level shows the company how good it is at managing projects. This measurement can be performed in different domains of expertise. In the article, the issue of PMM in the human resources (HR) area is examined. The discussion is based on a world-wide empirical research project conducted in more than 400 companies. The study was mostly focused on the machinery industry as there is a dearth of research on project management topics in this branch of the economy. Therefore, by investigating the PMM level in the HR area, a picture of the state of project management in the machinery industry will be created. For the purposes of comparison, a study was conducted on the construction (CONS) and information technology (IT) industries which, in contradistinction, are very well recognized in the scientific literature related to project management issues. This approach will help to better contextualize and understand the results from the machinery industry. The PMM level measurement was done using the author's model which assesses maturity on a scale of one to five, where one is the lowest and five, the highest level of maturity. The results of the study revealed that there were differences among the industries in PMM levels and between Polish and foreign companies.展开更多
With the rapid development of information technology,Building Information Modeling(BIM)technology has gradually occupied an important position in the construction industry.With the introduction of BIM technology,the c...With the rapid development of information technology,Building Information Modeling(BIM)technology has gradually occupied an important position in the construction industry.With the introduction of BIM technology,the cost control of construction projects can be greatly improved[1].The use of this technology can not only reduce the project approval time but also improve the quality of the project.In addition,it can also help the construction personnel to solve the project changes,maintenance costs,insurance rates,and other related issues,so that the operation of the project is more efficient and economical.This paper will discuss the role of BIM technology in depth,and explore the advantages and disadvantages of each link through the research of the project,to provide a reference for the promotion of this new project.By constantly adjusting the application strategy,the goal is to meet the current market demand.展开更多
文摘With the gradual acceleration of the urbanization process,the construction industry has been developing rapidly.As the key link to ensure the quality and safety of the project,construction management and construction quality control are of great significance to enhance the competitiveness of construction enterprises and realize sustainable development.In this paper,the effective strategy of construction management and the effective strategy of construction quality control will be discussed in depth,aiming at providing useful management and quality control strategies for construction enterprises.
文摘In view of the current development of power engineering management,traditional management methods can no longer be applied to the management of current power engineering work.Therefore,it is necessary to innovate and optimize existing project management modes,transform traditional management concepts and models,focus on addressing the problems in project management and improve management.This paper mainly analyzes the project management mode and power engineering management.
文摘Three-dimensional visualization technology converts engineering design drawings and data into graphics or images, realizes virtual reality perception of simulated users in future construction scene, enhances the interaction between project management and technical personnel and engineering construction achievement, and provides intuitive, flexible and strong realistic experience for project management. It can effectively improve the level of project communication, and assist the needs of project construction planning management, training, exhibition, etc. As a tool to help improve project management skills, it has good application effect and prospects.
文摘Many organizations are struggling to provide high bandwidth and reliable internet connectivity at their branch offices and business locations and getting the most out of their operational expense.The need for internet connectivity at any branch offices and business locations is not a luxury anymore but is a necessity.Let us try to understand how to plan and document the SDWAN(Software Defined-Wide Area Network)implementation in an organization.We will try to understand why it is essential to implement the new technology instead of investing in the existing MPLS(Multi-Protocol label switching)by taking an example of a retail organization.Methods:This project/research was performed using the abilities of Software Defined Network Technology and options available in MPLS(Multi-Protocol Label Switching).The Technical Project management principles were adopted as per PMI(Project Management Institute)waterfall methodology.Results/Conclusion:SDWAN technology provides an effective replacement of MPLS network connection for providing WAN connectivity for our office locations.It is essential to follow a documented process for appropriate vendor selection based on the available features and other listed attributes in the article.To be successful in the implementation it is essential to perform a POC(Proof of Concept)in a controlled environment and validate results.SDWAN provides better network performance and improves reliability as the links operate in active-active function.
基金Chongqing Higher Education Teaching Reform Research Project Application Research of Blending Teaching based on Duifene Teaching Platform 203195.Chongqing Higher Vocational and Technical Education Research Association.Mobile phones in the classroom:a practical study on building a 1:1 digital teaching model GY201084.
文摘The Duifene teaching platform is a product of various teaching methods,which greatly improves the traditional teaching method.This article introduces the function and characteristics of a blended teaching platform as well as its application for histology and embryology modules.In addition,the advantages and disadvantages of blended teaching method is also discussed.The application of this teaching platform for Construction Project Management modules encourages students to be more enthusiastic and interested toward learning.This allows a more convenient and rapid teacher-student and student-student interaction thereby improving the teaching and learning experiences.
文摘One of the most important tasks of security is the quality of the project substation substation construction project management, construction project management, including project bidding and engineering, electrical engineering and civil construction, engineering, quality control, safety management and supervision costs control, on-site supervision over the links, these links chain, indivisible, so long as a part of the management problems, will lead the entire construction project management effectiveness be affected, so it must be every link control and management work done, in order to guarantee the quality of the entire substation, in order to make security of supply substations, electrical safety and vital interests of users are protected. In this paper, the author details the three aspects substation construction management of the project, namely the concept of substation engineering, project management and construction safety, through these three aspects, the author analyzes the construction project management substation existing problems, To solve these problems and issues proposed some measures and construction process that need attention. It launched separately from the design, schedule, quality and other aspects of security and research, and in the course of the study stressed the importance of coordination between elements of construction and construction sectors as well as cooperation between the construction, explains the importance of the project cost control.
文摘In this paper,we discuss the influence of economic,environmental and legal policies of the state on the management of investment projects in the area of industrial construction in Poland.Our empirical study relies on conducting a questionnaire survey.A total of 158 Polish companies dealing with industrial construction took part in the survey.Then,the collected questionnaires were subjected to a thorough analysis and interpretation,with the use of a method called the exploratory factor analysis(EFA).Our research reveals the key factors influencing successful investment project management in the Polish industrial construction sector.These factors have been identified as the“availability of technology in a stable political system”,“stability of the economic and tax systems”,“stable social system policy,stability and transparency of the legal system”and a“well-targeted environmental policy”.A key conclusion that can be drawn from our study is that an efficient management of investment projects in the industrial construction industry is significantly influenced by properly shaped and stable economic,environmental,and legal policies of the state.
文摘With the continuous development of the construction industry, the scale and volume of the construction project is expanding. And the project management of the construction project still has the big risk problem which influenced by many factors. These risks will not only bring unnecessary interference to the construction of the project, but also may jeopardize the safety of people's life and property. It is the focus of this article to do a good job in risk aversion in the management of construction projects.
文摘Construction project management as an important branch of management science has its own characteristics; it was known as an important aspect of project management in the 21 st century. Construction companies now face a more complex competitive environment and more powerful competitors. In order to compete for the market and living space, Enterprises should be in a strategic height, cultivate long- term competitive advantage. Cost management is a new tool to enhance the competitiveness of enterprises, Popularization and application of Construction project management to the scientific development of the project management made the following three aspects urgent requirement. First. establish a scientific system for the construction project management. Construction Project Management knowledge system is the foundation and needs for Construction Project Management scientific and professional.
文摘The construction industry is acutely aware of the need to improve its management process. Currently,construction management is facing four major schools of thoughts. This paper reports the recent study results,the aim of which was to compare these approaches. The focus will be on the questions:What is the theory root for this school of thoughts? What is the position of planning? What are the techniques used or recommended by each of these schools of thoughts in managing construction projects? Recommendations are then given through a deep discussion of the capability of each approach in managing today's highly complex construction project.
文摘Construction project management is an important aspect of civil engineering construction. How to use scientific and efficient methods to effectively man</span><span style="font-family:Verdana;">age construction projects is the focus of construction project development un</span><span style="font-family:Verdana;">der the current situation. This article discusses the application of fuzzy mathematics in construction project management. The study found that in the process of construction project management, it was found that a single fuzzy </span><span style="font-family:Verdana;">mathematical method was difficult to adapt to the current complex and cha</span><span style="font-family:Verdana;">ngeable construction projects. Combining fuzzy mathematics with other man</span><span style="font-family:Verdana;">agement methods and computer applications can better simplify complex</span><span style="font-family:Verdana;"> things, reduce human subjectivity, increase calculation speed, and achieve a combination of qualitative and quantitative research;selection of optimization schemes and risk assessment, etc. All have a good effect, and can better </span><span style="font-family:Verdana;">deal with possible or uncertain things and emergencies in the process of pr</span><span style="font-family:Verdana;">oject management. At the same time, combining fuzzy mathematics with heuristic algorithms or meta-heuristic algorithms can make research more objective, improve management efficiency and calculation speed.
文摘In order to realize the standardization and normalization of environmental protection project management.This paper uses the literature method to study the current status of the existing project management mode,and points out the problems:lack of a sound project management system,insufficient information application of project management,and unclear decentralization in project management;on this basis,this paper proposes optimization strategies from the aspects of perfecting the engineering project management system,clarifying the allocation of project management authority,and strengthening the construction of engineering project management information.And put forward the future development trend of project engineering management,on the basis of two mainstream management modes of BOT(Build-Operate-Transfer)and EPC(Engineering Procurement Construction),build a standardized project management platform to achieve intelligent management.Realize intelligent management of engineering project management to achieve standardization and standardization,greatly improving the efficiency of project management.
文摘The construction quality and efficiency of construction engineering are directly related to people's daily life.Therefore,construction enterprises must keep pace with the times and actively introduce advanced technical means into architectural design,project construction,and management,so as to ensure the quality and safety of construction to the maximum extent.The application of BIM not only improves the efficiency of construction and construction quality,but also realizes the control of construction cost.This study explores and analyzes the advantages of BIM as well as proposes application strategies of BIM in architectural design,project construction,and management,hoping to contribute to the smooth construction of construction engineering.
文摘With the entrance into WTO, the Chinese supervision enterprises face the serious challenge never existed before. Comparing with other type enterprises Chinese supervision enterprises nature of China are the same as project management companies in connotation and service scope in nature. They have much superiority in development of the project management work. Through comparing and analyzing the special feature between Chinese supervision enterprise and international project management enterprise, this paper points out the gap between them, and table the proposal of they transforming to the project management enterprises.
基金Project supported by Aviation Basic Science Fundation( GrantNo .00F51058)
文摘Development of the global economy makes modem enterprises confront challenges of efficient managements for large projects and complex processes. Projects are typically managed in rather special manners. On the contrary, there exist many methodologies for product process management to achieve consistency and continuance. However, processes often lack flexibility offered by projects. This paper dis~ the relationship of conceptual characteristics between process and project, gives low-level details to tackle the difference between them, and proposes an enterprise process modeling method for project management. An integrated environment is designed to support the method from which both project management and process management can receive benefits and conform to the limitations.
文摘The paper researched and analyzed the characteristics, deficiencies and reasons of a management system of a software enterprise project to design a software project management system based on CMMI 1.2, thus helping the enterprise to improve development and management efficiency of software project and reduce the risks and costs on project devel- opment. It studied CMMI model version 1.3 which is recently released by SEI, analyzed its characteristics and told the difference between version 1.2 and version 1.3. In addition, an improvement proposal and a solution of the software project management system were given from multiple perspectives.
文摘Aircraft on ground or down-time for its maintenance is a clear loss in revenue for an airline operation. With never ending competition and growing operating costs of aircraft, airlines continuously need to explore opportunities to reduce the aircraft down-time in order to remain sustainable. Due to round the clock operation feature of scheduled airlines, aircraft maintenance operations are generally carried out using traditional management methodologies instead of considering it as a project. Though aircraft heavy maintenance checks consist of several major tasks that can last from few weeks to a year, the maintenance organisations do not adopt modern project management methodologies. Therefore, this paper models a heavy maintenance check of an Airbus aircraft as a typical project and adopts contemporary project management methodology to explore the possibility of reducing the downtime. To this end, a case study has been done at an aircraft maintenance company to analyse the potential of this project management method in aircraft maintenance industry.
文摘Various industries today rely on the support of electromechanical equipment,expanding its scope of application and leading to an increase in electromechanical installation projects.However,due to the high level of expertise required and the potential risks involved,it is crucial to emphasize safety management during construction.This paper delves into the significance of construction safety management for electromechanical installation projects,identifies common problems encountered during construction,and proposes solutions.This analysis aims to provide relevant personnel with essential guidance and references for managing electromechanical installation projects safely.
文摘The assessment of the Project Management Maturity (PMM) level shows the company how good it is at managing projects. This measurement can be performed in different domains of expertise. In the article, the issue of PMM in the human resources (HR) area is examined. The discussion is based on a world-wide empirical research project conducted in more than 400 companies. The study was mostly focused on the machinery industry as there is a dearth of research on project management topics in this branch of the economy. Therefore, by investigating the PMM level in the HR area, a picture of the state of project management in the machinery industry will be created. For the purposes of comparison, a study was conducted on the construction (CONS) and information technology (IT) industries which, in contradistinction, are very well recognized in the scientific literature related to project management issues. This approach will help to better contextualize and understand the results from the machinery industry. The PMM level measurement was done using the author's model which assesses maturity on a scale of one to five, where one is the lowest and five, the highest level of maturity. The results of the study revealed that there were differences among the industries in PMM levels and between Polish and foreign companies.
文摘With the rapid development of information technology,Building Information Modeling(BIM)technology has gradually occupied an important position in the construction industry.With the introduction of BIM technology,the cost control of construction projects can be greatly improved[1].The use of this technology can not only reduce the project approval time but also improve the quality of the project.In addition,it can also help the construction personnel to solve the project changes,maintenance costs,insurance rates,and other related issues,so that the operation of the project is more efficient and economical.This paper will discuss the role of BIM technology in depth,and explore the advantages and disadvantages of each link through the research of the project,to provide a reference for the promotion of this new project.By constantly adjusting the application strategy,the goal is to meet the current market demand.