On 12th August 2015,a massive rapid long run-out rock landslide occurred in the Shanyang Vanadium Mine in Shaanxi Province,China,which claimed the lives of 65 miners.No heavy rainfalls,earthquakes,and mining blasts we...On 12th August 2015,a massive rapid long run-out rock landslide occurred in the Shanyang Vanadium Mine in Shaanxi Province,China,which claimed the lives of 65 miners.No heavy rainfalls,earthquakes,and mining blasts were recorded before the incident.Therefore,the failure mechanism and the cause of the long run-out movement are always in arguments.In this paper,we conducted a detailed field investigation,laboratory tests,block theory analysis,and numerical simulation to investigate the failure and long run-out mechanisms of the landslide.The field investigation results show that the source material of the rock landslide is a huge dolomite wedge block bedding on siliceous shale layers.Uniaxial compression tests indicate that the uniaxial compression strength of the intact dolomite is 130-140MPa and the dolomite shows a brittle failure mode.Due to the progressive downward erosion of the gully,the dolomite rock bridge at the slope toe became thinner.As the compression stress in the dolomite bridge increased to surpass its strength,the brittle failure of the bridge occurred.Then huge potential energy was released following the disintegration of the landslide,which led to the high acceleration of this rock landslide.The 3D discrete element simulation results suggest that the low intergranular friction contributes to the long run-out movement of this rock landslide.展开更多
A calamitous landslide happened at 22:00 on September 1,2014 in the Yunyang area of Chongqing City,southwest China,enforcing the evacuation of 508 people and damaging 23 buildings.The landslide volume comprised 1.44 m...A calamitous landslide happened at 22:00 on September 1,2014 in the Yunyang area of Chongqing City,southwest China,enforcing the evacuation of 508 people and damaging 23 buildings.The landslide volume comprised 1.44 million m^(3) of material in the source area and 0.4 million m^(3) of shoveled material.The debris flow runout extended 400 m vertically and 1600 m horizontally.The Xianchi reservoir landslide event has been investigated as follows:(1)samples collected from the main body of landslide were carried out using GCTS ring shear apparatus;(2)the parameters of shear and pore water pressure have been measured;and(3)the post-failure characteristics of landslide have been analyzed using the numerical simulation method.The excess pore-water pressure and erosion in the motion path are considered to be the key reasons for the long-runout motion and the scale-up of landslides,such as that at Xianchi,were caused by the heavy rainfall.The aim of this paper is to acquired numerical parameters and the basic resistance model,which is beneficial to improve simulation accuracy for hazard assessment for similar to potentially dangerous hillslopes in China and elsewhere.展开更多
基金funded by the National Key R&D Program of China(2021YFE0111900)the China Postdoctoral Science Foundation(2023M730353)+1 种基金Major Program of National Natural Science Foundation of China(Grant No.42041006)Natural Science Basic Research Program of Shaanxi(Program No.2022JM-167).
文摘On 12th August 2015,a massive rapid long run-out rock landslide occurred in the Shanyang Vanadium Mine in Shaanxi Province,China,which claimed the lives of 65 miners.No heavy rainfalls,earthquakes,and mining blasts were recorded before the incident.Therefore,the failure mechanism and the cause of the long run-out movement are always in arguments.In this paper,we conducted a detailed field investigation,laboratory tests,block theory analysis,and numerical simulation to investigate the failure and long run-out mechanisms of the landslide.The field investigation results show that the source material of the rock landslide is a huge dolomite wedge block bedding on siliceous shale layers.Uniaxial compression tests indicate that the uniaxial compression strength of the intact dolomite is 130-140MPa and the dolomite shows a brittle failure mode.Due to the progressive downward erosion of the gully,the dolomite rock bridge at the slope toe became thinner.As the compression stress in the dolomite bridge increased to surpass its strength,the brittle failure of the bridge occurred.Then huge potential energy was released following the disintegration of the landslide,which led to the high acceleration of this rock landslide.The 3D discrete element simulation results suggest that the low intergranular friction contributes to the long run-out movement of this rock landslide.
基金supported by the China Geological Survey Project(Grant No.DD20211314)the Fundamental Research Funds for Chinese Academy of Geological Science(No.JKY202122).
文摘A calamitous landslide happened at 22:00 on September 1,2014 in the Yunyang area of Chongqing City,southwest China,enforcing the evacuation of 508 people and damaging 23 buildings.The landslide volume comprised 1.44 million m^(3) of material in the source area and 0.4 million m^(3) of shoveled material.The debris flow runout extended 400 m vertically and 1600 m horizontally.The Xianchi reservoir landslide event has been investigated as follows:(1)samples collected from the main body of landslide were carried out using GCTS ring shear apparatus;(2)the parameters of shear and pore water pressure have been measured;and(3)the post-failure characteristics of landslide have been analyzed using the numerical simulation method.The excess pore-water pressure and erosion in the motion path are considered to be the key reasons for the long-runout motion and the scale-up of landslides,such as that at Xianchi,were caused by the heavy rainfall.The aim of this paper is to acquired numerical parameters and the basic resistance model,which is beneficial to improve simulation accuracy for hazard assessment for similar to potentially dangerous hillslopes in China and elsewhere.