The unreasonable observation arrangements in the satellite operation control center(SOCC)may result in the observation data cannot be downloaded as scheduled.Meanwhile,if the operation instructions released by the sat...The unreasonable observation arrangements in the satellite operation control center(SOCC)may result in the observation data cannot be downloaded as scheduled.Meanwhile,if the operation instructions released by the satellite telemetry tracking center(STTC)for the on-board payloads are not injected on the specific satellites in time,the corresponding satellites cannot perform the observation operations as planned.Therefore,there is an urgent need to design an integrated instruction release,and observation task planning(I-IRO-TP)scheme by efficiently collaborating the SOCC and STTC.Motivated by this fact,we design an interaction mechanism between the SOCC and the STTC,where we first formulate the I-IRO-TP problem as a constraint satisfaction problem aiming at maximizing the number of completed tasks.Furthermore,we propose an interactive imaging task planning algorithm based on the analysis of resource distribution in the STTC during the previous planning periods to preferentially select the observation arcs that not only satisfy the requirements in the observation resource allocation phase but also facilitate the arrangement of measurement and control instruction release.We conduct extensive simulations to demonstrate the effectiveness of the proposed algorithm in terms of the number of completed tasks.展开更多
How to deal with the collaboration between task decomposition and task scheduling is the key problem of the integrated manufacturing system for complex products. With the development of manufacturing technology, we ca...How to deal with the collaboration between task decomposition and task scheduling is the key problem of the integrated manufacturing system for complex products. With the development of manufacturing technology, we can probe a new way to solve this problem. Firstly, a new method for task granularity quantitative analysis is put forward, which can precisely evaluate the task granularity of complex product cooperation workflow in the integrated manufacturing system, on the above basis; this method is used to guide the coarse-grained task decomposition and recombine the subtasks with low cohesion coefficient. Then, a multi-objective optimieation model and an algorithm are set up for the scheduling optimization of task scheduling. Finally, the application feasibility of the model and algorithm is ultimately validated through an application case study.展开更多
The purpose of this article is to explore how important that task-based language teaching(TBLT)interacts with Infor mation and Communication Technology(ICT)into English language teaching(ELT)in China.Many researchers ...The purpose of this article is to explore how important that task-based language teaching(TBLT)interacts with Infor mation and Communication Technology(ICT)into English language teaching(ELT)in China.Many researchers have already studied that ICT and TBLT innovate the traditional teaching methods and improve our teaching or learning.However,they sepa rated TBLT from ICT instead of integrating these two ways into ELT.Few researches studied on how importance task-based in teracts with integration ICT into ELT in China.Under this circumstance,this article reviews the literature related to the present situation,which includes the brief introduction in English language teaching problems,the general concepts of ICT in ELT,taskbased teaching methodology in ELT,some studies on task-based interacting with integration ICT into ELT,discussion and con clusion.展开更多
为满足训练的信息化需求,设计了灵活通用的数据协议和虚实结合的信息引接系统。基于中间件的分层设计思路,实现了外部信息接收、对内信息转发、通信协议解析与转换、信息对接联调、数据文件记录、配置管理以及信息流量统计等功能;采用了...为满足训练的信息化需求,设计了灵活通用的数据协议和虚实结合的信息引接系统。基于中间件的分层设计思路,实现了外部信息接收、对内信息转发、通信协议解析与转换、信息对接联调、数据文件记录、配置管理以及信息流量统计等功能;采用了MVC软件架构模式,选用Visual Studio 2015作为开发工具,以Oracle数据库作为底层支撑,构建了实装信息及虚拟目标信息接收模块、建立数据映射关系模块、读取数据库方案模块、基础通信接收内部航迹模块、数据包发送模块。实际应用效果表明,该系统能够屏蔽外部装备系统、仿真系统和网络协议之间的差异,提供互联互通,适应虚实结合的训练任务,提高保障能力。该系统具有良好的适应性和可扩展性,可以满足信息化条件下系统的应用和发展需要。展开更多
针对气象因素对多元负荷变化的灵敏度差异及多元负荷间耦合强度的差异导致多任务学习(multi-tasklearning,MTL)预测模型精度受限的问题,该文提出一种MTL和单任务学习(single-tasklearning,STL)组合的多元负荷预测方法。首先使用基于长...针对气象因素对多元负荷变化的灵敏度差异及多元负荷间耦合强度的差异导致多任务学习(multi-tasklearning,MTL)预测模型精度受限的问题,该文提出一种MTL和单任务学习(single-tasklearning,STL)组合的多元负荷预测方法。首先使用基于长短期记忆(long and short-term memory,LSTM)网络的MTL模型提取多元负荷间的耦合信息进行初步预测;然后采用基于前置双重注意力长短期记忆(dual attention before LSTM,DABLSTM)网络的STL模型减少输入噪声进行二次预测;同时将初步的预测值输入STL模型,使得STL模型可以考虑未来的时序信息;最后,通过全连接层对两个模型的预测结果进行融合得到最终的预测结果。实验结果表明,所提组合模型相比单一的MTL和STL模型具有更高的预测精度。展开更多
基金supported by the Natural Science Foundation of China under Grants U19B2025,62121001,and 62001347in part by Key Research and Development Program of Shaanxi(ProgramNo.2022ZDLGY05-02)in part by Young Talent Support Program of Xi’an Association for Science and Technology(No.095920221337).
文摘The unreasonable observation arrangements in the satellite operation control center(SOCC)may result in the observation data cannot be downloaded as scheduled.Meanwhile,if the operation instructions released by the satellite telemetry tracking center(STTC)for the on-board payloads are not injected on the specific satellites in time,the corresponding satellites cannot perform the observation operations as planned.Therefore,there is an urgent need to design an integrated instruction release,and observation task planning(I-IRO-TP)scheme by efficiently collaborating the SOCC and STTC.Motivated by this fact,we design an interaction mechanism between the SOCC and the STTC,where we first formulate the I-IRO-TP problem as a constraint satisfaction problem aiming at maximizing the number of completed tasks.Furthermore,we propose an interactive imaging task planning algorithm based on the analysis of resource distribution in the STTC during the previous planning periods to preferentially select the observation arcs that not only satisfy the requirements in the observation resource allocation phase but also facilitate the arrangement of measurement and control instruction release.We conduct extensive simulations to demonstrate the effectiveness of the proposed algorithm in terms of the number of completed tasks.
基金supported by the National Natural Science Foundation of China(71401131)the MOE(Ministry of Education in China)Project of Humanities and Social Sciences(13XJC630011)the Ministry of Education Research Fund for the Doctoral Program of Higher Education(20120184120040)
文摘How to deal with the collaboration between task decomposition and task scheduling is the key problem of the integrated manufacturing system for complex products. With the development of manufacturing technology, we can probe a new way to solve this problem. Firstly, a new method for task granularity quantitative analysis is put forward, which can precisely evaluate the task granularity of complex product cooperation workflow in the integrated manufacturing system, on the above basis; this method is used to guide the coarse-grained task decomposition and recombine the subtasks with low cohesion coefficient. Then, a multi-objective optimieation model and an algorithm are set up for the scheduling optimization of task scheduling. Finally, the application feasibility of the model and algorithm is ultimately validated through an application case study.
文摘The purpose of this article is to explore how important that task-based language teaching(TBLT)interacts with Infor mation and Communication Technology(ICT)into English language teaching(ELT)in China.Many researchers have already studied that ICT and TBLT innovate the traditional teaching methods and improve our teaching or learning.However,they sepa rated TBLT from ICT instead of integrating these two ways into ELT.Few researches studied on how importance task-based in teracts with integration ICT into ELT in China.Under this circumstance,this article reviews the literature related to the present situation,which includes the brief introduction in English language teaching problems,the general concepts of ICT in ELT,taskbased teaching methodology in ELT,some studies on task-based interacting with integration ICT into ELT,discussion and con clusion.
文摘为满足训练的信息化需求,设计了灵活通用的数据协议和虚实结合的信息引接系统。基于中间件的分层设计思路,实现了外部信息接收、对内信息转发、通信协议解析与转换、信息对接联调、数据文件记录、配置管理以及信息流量统计等功能;采用了MVC软件架构模式,选用Visual Studio 2015作为开发工具,以Oracle数据库作为底层支撑,构建了实装信息及虚拟目标信息接收模块、建立数据映射关系模块、读取数据库方案模块、基础通信接收内部航迹模块、数据包发送模块。实际应用效果表明,该系统能够屏蔽外部装备系统、仿真系统和网络协议之间的差异,提供互联互通,适应虚实结合的训练任务,提高保障能力。该系统具有良好的适应性和可扩展性,可以满足信息化条件下系统的应用和发展需要。
文摘针对气象因素对多元负荷变化的灵敏度差异及多元负荷间耦合强度的差异导致多任务学习(multi-tasklearning,MTL)预测模型精度受限的问题,该文提出一种MTL和单任务学习(single-tasklearning,STL)组合的多元负荷预测方法。首先使用基于长短期记忆(long and short-term memory,LSTM)网络的MTL模型提取多元负荷间的耦合信息进行初步预测;然后采用基于前置双重注意力长短期记忆(dual attention before LSTM,DABLSTM)网络的STL模型减少输入噪声进行二次预测;同时将初步的预测值输入STL模型,使得STL模型可以考虑未来的时序信息;最后,通过全连接层对两个模型的预测结果进行融合得到最终的预测结果。实验结果表明,所提组合模型相比单一的MTL和STL模型具有更高的预测精度。