The platform with bucket foundations can penetrate and migrate by underpressure/positive pressure technique caused by pumping water out/in the bucket. However, the construction process of bucket foundations cannot be ...The platform with bucket foundations can penetrate and migrate by underpressure/positive pressure technique caused by pumping water out/in the bucket. However, the construction process of bucket foundations cannot be clearly observed and effectively controlled due to the special nature of sea environment. By using an advanced simulation development tool of Multigen Creator, the visual construction simulation program for the platform with bucket foundations was developed to set up the virtual reality system with interaction control and observation in every view angle based on the secondary development technology of Vega platform. The application results show that the method is feasible and effective by simulating the whole construction process for the platform with four bucket foundations.展开更多
基金Supported by National Natural Science Foundation of China(No.51109160)National High Technology Research and Development Program of China("863"Program,No.2012AA051705)+1 种基金International Science and Technology Cooperation Program of China(No.2012DFA70490)Tianjin Natural Science Foundation(No.13JCQNJC06900)
文摘The platform with bucket foundations can penetrate and migrate by underpressure/positive pressure technique caused by pumping water out/in the bucket. However, the construction process of bucket foundations cannot be clearly observed and effectively controlled due to the special nature of sea environment. By using an advanced simulation development tool of Multigen Creator, the visual construction simulation program for the platform with bucket foundations was developed to set up the virtual reality system with interaction control and observation in every view angle based on the secondary development technology of Vega platform. The application results show that the method is feasible and effective by simulating the whole construction process for the platform with four bucket foundations.