Environmental problems like haze have brought great pressure to current environmental protection management. On the one hand, plan EIA should be promoted further in all industries; on the other hand, the current achie...Environmental problems like haze have brought great pressure to current environmental protection management. On the one hand, plan EIA should be promoted further in all industries; on the other hand, the current achievements and methods of plan EIA should be summarized and innovated. And the EIA supervision and project access can be improved further through the coordination between plan EIA and project EIA. In this study, from the three levels of plan EIA policy framework, five problems of plan EIA in power sector were analyzed according to the current situation of plan EIA in power sector. Based on the present achievements, five macroscopic suggestions were proposed from the view of innovation accord- ing to the new environmental protection situation and requirements at present.展开更多
基金Supported by the Scientific Research Project of Environmental Protection Public Welfare Industry (201509021)
文摘Environmental problems like haze have brought great pressure to current environmental protection management. On the one hand, plan EIA should be promoted further in all industries; on the other hand, the current achievements and methods of plan EIA should be summarized and innovated. And the EIA supervision and project access can be improved further through the coordination between plan EIA and project EIA. In this study, from the three levels of plan EIA policy framework, five problems of plan EIA in power sector were analyzed according to the current situation of plan EIA in power sector. Based on the present achievements, five macroscopic suggestions were proposed from the view of innovation accord- ing to the new environmental protection situation and requirements at present.