期刊文献+
共找到333篇文章
< 1 2 17 >
每页显示 20 50 100
Construction Technology of Pile Foundation for Subway Tunnel Crossing Bridge
1
作者 Ruiquan Liu 《Journal of World Architecture》 2024年第2期37-42,共6页
Urban infrastructure has become more complex with the rapid development of urban transportation networks.In urban environments with limited space,construction of facilities like subways and bridges may mutually influe... Urban infrastructure has become more complex with the rapid development of urban transportation networks.In urban environments with limited space,construction of facilities like subways and bridges may mutually influence each other,especially when subway construction requires passing under bridges.In such cases,pile foundation replacement technology is often necessary.However,this technology is highly specialized,with a lengthy and risky construction period,and high costs.Personnel must be proficient in key technical aspects to ensure construction quality.This article discusses the technical principle,construction process,and core technology of pile foundation replacement,along with the application of this technology in subway tunnel crossing bridge projects,supported by engineering examples for reference. 展开更多
关键词 Subway tunnel Bridge pile foundation replacement construction
下载PDF
Experimental Study of Dynamic Characteristics on Composite Foundation with CFG Long Pile and Rammed Cement-Soil Short Pile 被引量:3
2
作者 Jihui Ding Yanliang Cao +2 位作者 Weiyu Wang Tuo Zhao Junhui Feng 《Open Journal of Civil Engineering》 2014年第1期1-12,共12页
Based on the idea of optimization design of pile type, the two kinds of the typical pile type are selected, which containing flexibility pile (e.g. rammed cement-soil pile is for short RCSP), and rigid pile (e.g. ceme... Based on the idea of optimization design of pile type, the two kinds of the typical pile type are selected, which containing flexibility pile (e.g. rammed cement-soil pile is for short RCSP), and rigid pile (e.g. cement-flyash-gravel pile is for short CFGP). The three kinds of the composite foundation are designed, which are CFGP, CFG long pile and CFG short pile (for short CFGLP-CFGSP), CFG long-short pile and rammed cement-soil short pile (for short CFGLP-RCSSP). Natural earthquake is simulated by using the engineering blasting;the dynamic characteristics and dynamic response of the composite foundation are studied through field test. CFGLP-RCSSP is closed to linear relation. The bearing capacity of the four composite foundation of the CFGP, CFGLP-CFGSP, and CFGLP-RCSSP in the site are 225 kPa, 179 kPa, and 197 kPa, separately increases 150%, 98.8% and 119% compared to the natural foundation. The vibration main frequency is mainly depended on properties of foundation soil and piles between vibration source and measuring point, pilling load value. Horizontal vibration main frequency greater than the vertical vibration main frequency and the vertical vibration main frequency close to the first-order natural frequency of composite foundation. With the pilling load increasing, the CFGLP-RCSSP pile composite foundation combined frequency decreased. Under the same blast energy, the acceleration peak on the CFG pile composite foundation is less than CFGLP-CFGSP the corresponding values, as the load increases, the peak acceleration gently. CFG pile composite foundation is favorable on seismic. The distribution of peak acceleration is consistent within 4 m from pile top in the CFGLP_RCSSP composite foundation. The maximum of the horizontal acceleration peak along the pile body occurs at a distance of pile top 4 m or the pile top, and that of vertical acceleration peak occurred at a pile top. 展开更多
关键词 BLASTING VIBRATION CFG pile Rammed cement-soil pile Combined pile Composite FOUNDATION Dynamic Characteristics
下载PDF
深中通道沉管隧道深层水泥搅拌桩复合地基沉降计算分析
3
作者 陈卓杰 周佳锦 +2 位作者 陈伟乐 刘健 龚晓南 《浙江大学学报(工学版)》 EI CAS CSCD 北大核心 2024年第7期1397-1406,共10页
基于深中通道沉管隧道深层水泥搅拌(DCM)桩复合地基现场试验结果,考虑厚垫层和高置换率DCM桩对复合地基荷载传递机理及沉降特性的影响,将碎石垫层、DCM桩复合地基和桩端下卧层作为协同作用的系统,考虑系统各部分在接触面上的应力与变形... 基于深中通道沉管隧道深层水泥搅拌(DCM)桩复合地基现场试验结果,考虑厚垫层和高置换率DCM桩对复合地基荷载传递机理及沉降特性的影响,将碎石垫层、DCM桩复合地基和桩端下卧层作为协同作用的系统,考虑系统各部分在接触面上的应力与变形协调,通过分析典型单元体,推导海底DCM桩复合地基桩土应力比和沉降的理论计算公式.将理论计算得到的DCM桩复合地基荷载-位移曲线和桩土应力比变化曲线与现场静载试验实测曲线进行对比,相对误差均不超过±10%,验证了所提理论计算公式的合理性.分析置换率和垫层柔度系数对海底DCM桩复合地基的荷载传递机理及沉降特性的影响规律,结果表明:复合地基沉降随垫层柔度系数的增大而增大,随置换率的增大而减小;复合地基桩土应力比随置换率的增大而增大,随垫层柔度系数的增大而减小;置换率对复合地基沉降和桩土应力比的影响较垫层柔度系数更大. 展开更多
关键词 沉管隧道 海底深层水泥搅拌桩复合地基 碎石垫层 置换率 沉降计算
下载PDF
滇池湖积相泥炭质土中三轴深搅桩加固作用探讨
4
作者 太永丽 马贺雅 +1 位作者 刘克文 沈家仁 《矿产勘查》 2024年第3期471-476,共6页
采用三轴深搅桩进行地基加固及防渗处理是常用的工程技术措施,但在有机质含量高的泥炭质土中应用效果如何,何种施工工艺能够满足工程需要,如何进行加固效果检验等问题,还需要进行研究分析。本研究经对有机质土及泥炭质土的湖相沉积软土... 采用三轴深搅桩进行地基加固及防渗处理是常用的工程技术措施,但在有机质含量高的泥炭质土中应用效果如何,何种施工工艺能够满足工程需要,如何进行加固效果检验等问题,还需要进行研究分析。本研究经对有机质土及泥炭质土的湖相沉积软土地层进行三轴深搅止水帷幕施工后,采用多种方法进行施工效果检测,结果表明:(1)场地内原厚度达7 m的泥炭质土已基本被其下部的粉土、黏性土置换后与水泥浆均匀拌和,止水效果良好;(2)浅部的水泥搅拌桩芯土抗压强度指标比深部略低。通过对滇池湖湘沉积软土中三轴深搅桩的施工工艺及质量检测的分析,可为以后类似工程提供经验和借鉴。 展开更多
关键词 三轴深搅桩 止水帷幕 泥炭质土 土体置换
下载PDF
深厚软土地基深水板桩码头变形控制优化设计
5
作者 周清泉 尤坛洪 江义 《水运工程》 2024年第3期32-37,共6页
针对软土区采用深层水泥搅拌桩(DCM)加固的板桩码头结构,板桩变形控制是设计难点之一。以深厚软土地基的某深水板桩码头为研究对象,通过PLAXIS软件进行有限元模拟,分析在不同DCM置换率下码头前墙受力与变形的特性,比较DCM及拉杆的不同... 针对软土区采用深层水泥搅拌桩(DCM)加固的板桩码头结构,板桩变形控制是设计难点之一。以深厚软土地基的某深水板桩码头为研究对象,通过PLAXIS软件进行有限元模拟,分析在不同DCM置换率下码头前墙受力与变形的特性,比较DCM及拉杆的不同布置模式下的前墙位移,研究码头后方堆载预压对锚碇墙和土体变形的影响,最终对地基处理工序、DCM置换率及布置范围、拉杆布置进行优化设计。设计方案保证经济合理的同时,较好地限制了板桩的变形,缩短了施工工期,可为类似工程提供借鉴。 展开更多
关键词 组合板桩码头 深层水泥搅拌桩 置换率 前墙变形
下载PDF
强夯置换对软土基坑边坡开挖稳定性的影响研究
6
作者 刘强 高立群 +2 位作者 赵民 李效臣 彭庄昊 《人民长江》 北大核心 2024年第3期226-233,共8页
强夯置换作为一种地基处理方法,主要用于提高地基承载力,减小沉降,而将其作为基坑支护的相关研究却鲜有报道。通过一系列室内模型试验探讨了不同强夯置换率、基坑边坡坡率条件下,强夯置换后软土基坑在开挖过程中的变形位移规律。通过构... 强夯置换作为一种地基处理方法,主要用于提高地基承载力,减小沉降,而将其作为基坑支护的相关研究却鲜有报道。通过一系列室内模型试验探讨了不同强夯置换率、基坑边坡坡率条件下,强夯置换后软土基坑在开挖过程中的变形位移规律。通过构建墩土合并计算、墩土分开计算、墩土耦合3种有限元数值模型,对室内模型试验结果进行了对比验证。结果表明:水平位移向四周呈辐射式递减,室内模型试验与数值模拟的水平位移变化趋势一致且吻合度较高;坡体稳定系数随置换率的增加而不断上升;在墩与土之间加入界面单元提高了墩土之间的相互作用,可以有效提高数值模拟的准确性。 展开更多
关键词 强夯置换 墩土耦合 模型试验 基坑开挖 数值模拟 滨海软土
下载PDF
加油站软土地基处理方案的比选及应用
7
作者 秦秀豫 《化工管理》 2024年第1期151-153,157,共4页
软土地质承载力低,在此类地质建设加油站,容易导致建筑物地基产生不均匀沉降和变形,路面沉降开裂,稳定性不满足规范要求,严重影响加油站建设及运营安全。文章结合具体项目案例,对比分析桩基础和强夯置换法两种软土地质处理方案,并以强... 软土地质承载力低,在此类地质建设加油站,容易导致建筑物地基产生不均匀沉降和变形,路面沉降开裂,稳定性不满足规范要求,严重影响加油站建设及运营安全。文章结合具体项目案例,对比分析桩基础和强夯置换法两种软土地质处理方案,并以强夯置换法作为软土地质的处理方法,采用竖向抗压静载试验、平板载荷试验等试验手段对处理后的地基进行检测,结果表明强夯置换法可以提高加油站软土的承载性能,处理后的地质能够满足设计要求。 展开更多
关键词 加油站 软土地质 桩基础 强夯置换法
下载PDF
污泥层置换砂桩套打水泥搅拌桩软基处理技术
8
作者 林强有 雷斌 +2 位作者 马驰 范少峰 童心 《广东土木与建筑》 2024年第4期51-54,69,共5页
水泥搅拌桩是软基处理的一种常用方式,针对水泥搅拌桩在污泥弱软层出现水泥固化效果差等问题,通过在污泥内预先施工小直径砂桩,用中粗砂置换污泥层中腐殖质,同时以“小桩套打大桩”的形式,将水泥搅拌桩套打在同桩位处的砂桩上,采用“四... 水泥搅拌桩是软基处理的一种常用方式,针对水泥搅拌桩在污泥弱软层出现水泥固化效果差等问题,通过在污泥内预先施工小直径砂桩,用中粗砂置换污泥层中腐殖质,同时以“小桩套打大桩”的形式,将水泥搅拌桩套打在同桩位处的砂桩上,采用“四搅四喷”工艺,置换后砂土与水泥浆液充分均匀搅拌结合成桩,有效增强桩身强度,确保搅拌桩满足设计要求。在提高工效、确保桩体质量及降低综合施工成本等方面都突显出了独特的优越性,为解决腐殖质有机物污泥层中传统水泥搅拌桩施工效果差、成桩质量难以保证等问题提供了一种创新、实用的工艺技术。 展开更多
关键词 污泥层腐殖质 污泥层置换砂桩 小桩套打大桩 水泥搅拌桩 软基处理 施工技术
下载PDF
多种深厚软基处理技术在漳州某道路工程项目中的应用研究
9
作者 陈景 《福建建筑》 2024年第6期92-96,125,共6页
为了更好地对深厚软弱地基项目进行处理,对福建漳州某深厚软弱地基工程项目的施工应用进行分析介绍。首先分析目前主流的四种软弱地基的处理技术,并结合工程项目的基本概况和施工重难点,对四种方案的优缺点进行研究和分析,最终确定项目... 为了更好地对深厚软弱地基项目进行处理,对福建漳州某深厚软弱地基工程项目的施工应用进行分析介绍。首先分析目前主流的四种软弱地基的处理技术,并结合工程项目的基本概况和施工重难点,对四种方案的优缺点进行研究和分析,最终确定项目的具体处理方案。在此基础上,对施工工艺流程和施工工艺方法进行分析,梳理了深厚软弱地基处理过程中的质量控制要点。通过研究表明,多种技术结合的深厚软弱地基处理方案,处理方法合理,施工效果明显。 展开更多
关键词 深厚软弱地基 管桩加固法 施工技术 换填土处理法
下载PDF
核电厂取水头部结构在软土置换地基上的变形研究
10
作者 吴辰 李沐时 《港口航道与近海工程》 2024年第2期40-44,共5页
本文以国内某核电厂取水头部结构为研究对象,基于PLAXIS 3D建立三维有限元模型,研究在不同含泥量的软土置换地基条件下,取水头部增设桩基基础对结构位移的影响。通过计算结果分析可知,随着软土置换地基含泥量的增加,结构位移有增大趋势... 本文以国内某核电厂取水头部结构为研究对象,基于PLAXIS 3D建立三维有限元模型,研究在不同含泥量的软土置换地基条件下,取水头部增设桩基基础对结构位移的影响。通过计算结果分析可知,随着软土置换地基含泥量的增加,结构位移有增大趋势,在取水头部下方设置桩基基础后,结构位移尤其竖向位移有显著的减小,且软土置换地基含泥量的变化对结构位移影响很小,有效提高了结构的稳定性以及核电厂取水的安全性,该结论可为类似条件下的核电厂取水头部结构设计提供借鉴。 展开更多
关键词 取水头部 软土置换 含泥量 桩基 三维有限元 结构位移
下载PDF
The Dynamic Characteristic Experimental Method on the Composite Foundation with Rigid-Flexible Compound Piles 被引量:2
11
作者 Jihui Ding Weiyu Wang +2 位作者 Tuo Zhao Junhui Feng Panxing Zhang 《Open Journal of Civil Engineering》 2013年第2期94-98,共5页
Based on the idea of optimization design of pile type, the composite foundations, which include cememt-flyash-gaavel (for short CFG) long piles and cement-soil (for short CS) short piles, and CS piles with CFG core as... Based on the idea of optimization design of pile type, the composite foundations, which include cememt-flyash-gaavel (for short CFG) long piles and cement-soil (for short CS) short piles, and CS piles with CFG core as well, are formed. The method of the site dynamic characteristic tests of the composite foundations is discussed. The test results show that fireworks bomb may replace demolitions as the vibration resource. Vibration time is about 0.1 sec. Horizontal vibration major frequency is at 22.476 - 56.436 Hz, and vertical vibration major frequency is at 15.538 - 55.884 Hz. The pile arrangements of the composite foundation in the same site have more effect on the acceleration peak value. From the point of vibration, the anti-seismic effect of the CS piles with CFG core is better than others. 展开更多
关键词 cement-soil pileS Cememt-Flyash-Gaavel pileS Composite FOUNDATION Dynamic Characteristic In-Site Test
下载PDF
基于路堤稳定性的斜坡软土碎石桩复合地基面积置换率确定研究 被引量:2
12
作者 沙马伍呷 蒋鑫 +2 位作者 向嫣然 李政贤 邱延峻 《交通科技》 2023年第2期7-11,共5页
现行国家行业标准从路堤稳定性角度出发,要求斜坡软土地基路堤的稳定安全系数下限值根据地基横向坡度大小进行修正,即尝试通过提高路堤稳定性间接地对斜坡软土地基侧向变形予以控制。采用碎石桩复合地基可提高斜坡软土地基路堤稳定性,... 现行国家行业标准从路堤稳定性角度出发,要求斜坡软土地基路堤的稳定安全系数下限值根据地基横向坡度大小进行修正,即尝试通过提高路堤稳定性间接地对斜坡软土地基侧向变形予以控制。采用碎石桩复合地基可提高斜坡软土地基路堤稳定性,但其面积置换率可调整范围较宽,易致碎石桩复合地基处理设计时面积置换率确定方面随意性偏强。文中基于有限元剪切强度折减法,构建斜坡软土地基路堤碎石桩处治数值模型,分析在不同地基横向坡度条件下路堤稳定性随碎石桩复合地基面积置换率变化的规律,提出从路堤稳定性角度出发的斜坡软土碎石桩复合地基面积置换率确定方法,讨论了经碎石桩置换后土体重度、黏聚力和内摩擦角三者变化的综合作用。 展开更多
关键词 斜坡软土地基路堤 剪切强度折减法 稳定安全系数 面积置换率 碎石桩
下载PDF
多方案联合处理土岩组合地基效果研究
13
作者 吴仁广 王东 欧明喜 《工业安全与环保》 2023年第11期38-42,共5页
建筑物土岩组合地基的不均匀沉降一直都是设计和施工的难题,结合工程实例,借助ABAQUS有限元软件,对使用CFG桩、旋挖桩和换填垫层法联合处理方案进行处理的土岩组合地基进行数值模拟。通过对比不同的地基处理方式对土岩组合地基差异沉降... 建筑物土岩组合地基的不均匀沉降一直都是设计和施工的难题,结合工程实例,借助ABAQUS有限元软件,对使用CFG桩、旋挖桩和换填垫层法联合处理方案进行处理的土岩组合地基进行数值模拟。通过对比不同的地基处理方式对土岩组合地基差异沉降的影响,并分析地基的差异沉降和整体沉降,判断使用何种处理方式能较好地处理土岩组合地基的不均匀沉降问题。研究结果表明:使用CFG桩和换填垫层法联合处理的土岩组地基可以较好地解决地基的不均匀沉降问题,模拟结果可以为相关工程土岩组合地基的设计及处理提供一定的参考。 展开更多
关键词 土岩组合地基 不均匀沉降 CFG桩 旋挖桩 换填垫层法
下载PDF
某软弱地层钢板桩基坑支护工程换撑应用 被引量:2
14
作者 赵爽 彭立顺 刘恋 《华南地震》 2023年第3期171-174,共4页
东莞市某软弱地层,无中板地下结构基坑支护工程,被动区采用加固土,增强了软弱土体整体性,提高土体抗剪强度。采用理论计算对换撑技术控制水平位移方面进行分析,结果表明,换撑技术受力合理,可以有效控制基坑开挖引起的支护结构水平位移,... 东莞市某软弱地层,无中板地下结构基坑支护工程,被动区采用加固土,增强了软弱土体整体性,提高土体抗剪强度。采用理论计算对换撑技术控制水平位移方面进行分析,结果表明,换撑技术受力合理,可以有效控制基坑开挖引起的支护结构水平位移,提高基坑安全稳定性,类似地下结构无法形成刚性铰时,可参考本文换撑技术。 展开更多
关键词 深基坑支护 换撑 坑内加固土 钢板桩
下载PDF
钢管桩-注浆加固盾构换刀区稳定性分析
15
作者 戴治恒 张孟喜 +2 位作者 魏辉 顾婕 张晓清 《上海交通大学学报》 EI CAS CSCD 北大核心 2023年第6期690-699,共10页
以佛-莞城际线路长隆隧道工程为背景,采用室内试验和数值模拟,研究常压开仓时换刀区失稳和渐进破坏过程.结合工程实际建立数值模型,采用快速拉格朗日差分法分析钢管桩-注浆方案常压换刀区地层的安全系数,对比分析钢管桩-注浆加固方案对... 以佛-莞城际线路长隆隧道工程为背景,采用室内试验和数值模拟,研究常压开仓时换刀区失稳和渐进破坏过程.结合工程实际建立数值模型,采用快速拉格朗日差分法分析钢管桩-注浆方案常压换刀区地层的安全系数,对比分析钢管桩-注浆加固方案对换刀区地层应力释放和位移的控制效果.结果表明,常压开仓时盾构开挖面首先失稳,并引起土体流失以及土压力释放现象;随着刀盘后移,逐渐诱导换刀区地层出现大范围竖向位移,最终贯通至地表.采用钢管桩-注浆方案,换刀区安全系数得到显著提高,地层应力释放和位移均得到有效控制.与注浆加固方案相比,钢管桩-注浆方案具有工期短、污染少的优点且钢管桩可回收,不影响土体后续使用,为工程提供新的地层加固思路. 展开更多
关键词 常压换刀 钢管桩-注浆加固 开挖面稳定性 全风化地层 上软下硬地层
下载PDF
市政明挖路基下穿既有高速铁路桥梁的影响 被引量:3
16
作者 张文杰 《铁道建筑》 北大核心 2023年第6期132-135,共4页
南宁市市政道路交叉口以路基形式下穿既有高速铁路桥梁。为控制铁路桥梁墩台和路基地段的变形量,采用排桩、土钉墙、锚杆框架梁、重力式挡土墙进行加固防护。通过数值模拟分析了大范围开挖后回填和分区随挖随填两种路基换填方案对高速... 南宁市市政道路交叉口以路基形式下穿既有高速铁路桥梁。为控制铁路桥梁墩台和路基地段的变形量,采用排桩、土钉墙、锚杆框架梁、重力式挡土墙进行加固防护。通过数值模拟分析了大范围开挖后回填和分区随挖随填两种路基换填方案对高速铁路桥梁墩台和路基位移的影响。结果表明:两种方案桥梁墩台在开挖卸荷后均出现了上拱,路面加载后均产生沉降;两种方案桥梁桩基轴力均小于规范容许值;大范围开挖后回填方案0#台累计位移和路基地段最大累计位移均大于分区随挖随填方案,而2#墩和3#台累计位移均小于分区随挖随填方案。这说明市政道路以路基形式下穿既有高速铁路方案具有可实施性,但施工时须注意不同区段采用适宜施工方案。 展开更多
关键词 市政路基 施工方案 数值模拟 高速铁路 位移 换填填料 排桩 泡沫轻质土
下载PDF
2500 kJ液压打桩锤砧铁及替打结构冲击性能研究
17
作者 孔德阳 王琳 +2 位作者 董俊宏 李秀江 杨波 《山西建筑》 2023年第7期70-73,77,共5页
基于瞬时冲击数值模拟分析,对2500 kJ液压打桩锤用砧铁及砧铁-替打组合结构进行深入数值仿真分析,针对所给出的8种砧铁和替打结构几何构型方案,从加工材料质量、能量传递效率、应力分布等方面进行了对比分析,综合考虑各项因素确定了砧... 基于瞬时冲击数值模拟分析,对2500 kJ液压打桩锤用砧铁及砧铁-替打组合结构进行深入数值仿真分析,针对所给出的8种砧铁和替打结构几何构型方案,从加工材料质量、能量传递效率、应力分布等方面进行了对比分析,综合考虑各项因素确定了砧铁及砧铁-替打组合结构的最优几何构型和材料要求。文中所建议的砧铁及砧铁-替打组合结构可满足最大冲击能2500 kJ作业时结构安全系数不小于2.5的要求;同时,冲击能量传递效率大于80%。 展开更多
关键词 大型打桩锤 风能 打桩 替打 砧铁
下载PDF
桩芯水泥土对PRC支护管桩变形控制的影响
18
作者 吴志佳 杨烁 +5 位作者 张坤 刘翼 沈荣锋 程强强 吕安琪 姚越 《江苏建筑职业技术学院学报》 2023年第4期1-7,共7页
等刚度代换是PRC支护管桩计算的常用方法,目前已有代换方法未考虑桩芯水泥土作用。为此,对考虑桩芯水泥土作用支护管桩的等刚度代换计算方法进行研究具有实际意义。以徐州某基坑工程为例,将支护管桩刚度与桩芯水泥土刚度进行叠加,进而... 等刚度代换是PRC支护管桩计算的常用方法,目前已有代换方法未考虑桩芯水泥土作用。为此,对考虑桩芯水泥土作用支护管桩的等刚度代换计算方法进行研究具有实际意义。以徐州某基坑工程为例,将支护管桩刚度与桩芯水泥土刚度进行叠加,进而将支护管桩等刚度代换为实心灌注桩。为凸显差异性,首先对无支撑情形进行计算,并与已有等刚度代换方法对比分析,然后应用该方法对案例中PCMW工法桩加水平支撑支护进行计算,并结合监测结果进行验证。分析结果表明:桩芯水泥土对支护桩抗弯刚度有一定作用,但影响较小,等刚度代换后计算结果与监测数据基本吻合。通过对考虑桩芯水泥土的PRC管桩等刚度代换计算方法进行研究,给出理论计算结果,以期为类似的基坑工程问题提供参考。 展开更多
关键词 基坑工程 PRC管桩 等刚度代换 水泥土
下载PDF
基于软基加固技术的市政道路施工方法研究 被引量:1
19
作者 周成文 《江西建材》 2023年第9期284-286,共3页
文中提出基于软基加固技术的市政道路施工方法,通过修建排水设施、采用软基加固技术、道路软基换填以及混凝土桩施工,完成市政道路路面振捣及压实施工。应用结果表明,施工完成后,道路地表沉降量与道路两侧深层土水平位移量均低于最大限... 文中提出基于软基加固技术的市政道路施工方法,通过修建排水设施、采用软基加固技术、道路软基换填以及混凝土桩施工,完成市政道路路面振捣及压实施工。应用结果表明,施工完成后,道路地表沉降量与道路两侧深层土水平位移量均低于最大限值,符合市政道路施工质量验收要求。该设计方法具有良好的施工效果,在市政道路施工方面具有良好的应用前景。 展开更多
关键词 软基加固技术 市政道路 软基换填 混凝土桩 振捣 压实
下载PDF
Comparison between bearing characteristics of pervious concrete pile composite foundations with different replacement ratios
20
作者 Han Xia Guangyin Du +1 位作者 Jun Cai Changshen Sun 《Geohazard Mechanics》 2023年第3期255-261,共7页
The replacement ratio is an essential factor in evaluating the bearing capacity characteristics of compositefoundations. This study focuses on the bearing capacity of a pervious concrete pile with different replacemen... The replacement ratio is an essential factor in evaluating the bearing capacity characteristics of compositefoundations. This study focuses on the bearing capacity of a pervious concrete pile with different replacementratios. The axial force, skin friction, and settlement were evaluated using a model test to assess the performance ofthe pervious concrete pile composite foundation. When the replacement ratio was reduced from 9.26% to 2.32%,the characteristic bearing capacity value was only 14%. Therefore, it may be unreasonable to use the settlementratio method to evaluate this composite foundation's bearing capacity in a model test. Appropriate loading cansignificantly improve the bearing capacity of a pervious concrete pile composite foundation with a lowreplacement ratio. The pile–soil stress ratio exhibited different decreasing ranges in the later loading stage. As theload increased, the axial force of the pervious concrete piles was small and nonobvious, and the average sidefriction resistance of the piles in the foundation with a lower replacement ratio slowly increased. 展开更多
关键词 Pervious concrete piles Model test replacement ratios Bearing capacity
原文传递
上一页 1 2 17 下一页 到第
使用帮助 返回顶部