The natural cracking of crude oils in deep reservoirs has gained great interest due to continuously increasing depth of petroleum exploration and exploitation.Complex oil compositions and surroundings as well as compl...The natural cracking of crude oils in deep reservoirs has gained great interest due to continuously increasing depth of petroleum exploration and exploitation.Complex oil compositions and surroundings as well as complicated geological evolutions make oil cracking in nature much more complex than industrial pyrolysis.So far,numerous studies,focused on this topic,have made considerable progress although there still exist some drawbacks.However,a comprehensive review on crude oil cracking is yet to be conducted.This article systematically reviews the controlling factors of oil cracking from six aspects,namely,oil compositions,temperature and time,pressure,water,minerals and solid organic matter.We compare previous experimental and modelling results and present new field cases.In the following,we evaluate the prevailing estimation methods for the extent of oil cracking,and elucidate other factors that may interfere with the application of these estimation methods.This review will be helpful for further investigations of crude oil cracking and provides a guide for estimation of the cracking extent of crude oils.展开更多
Since the reform and opening up,Chinese economy has developed rapidly.Industrial and civil construction projects have made significant progress.That said,it is of great significance to further strengthen the construct...Since the reform and opening up,Chinese economy has developed rapidly.Industrial and civil construction projects have made significant progress.That said,it is of great significance to further strengthen the construction management of industrial and civil construction projects for the longterm development of construction industry in China.In terms of reality,one of the common problems in the current industrial and civil construction is wall cracks,which will have an important impact on the appearance of the building and the overall construction quality.Therefore,it is necessary to analyze the reasons and put forward corresponding measures on it.That is how we can continuously improve the construction quality in civil and industrial construction projects,thereby achieving the enhancement of building safety and stability.展开更多
This article describes the integrated modeling approach for planning the size and the operation of constructed wetlands for maximizing retention of nonpoint source pollutant loads and reservoir water-quality improveme...This article describes the integrated modeling approach for planning the size and the operation of constructed wetlands for maximizing retention of nonpoint source pollutant loads and reservoir water-quality improvement at a catchment scale. The experimental field-scale wetland systems (four sets, 0.88 ha each) have been in operation since 2002, where water depth was maintained at 30-50 cm and hydraulic loading rate was at 6.3-18.8 cm/day. The wetland system was found to be adequate for treating polluted stream water with stable removal efficiency even during the winter. The integrated modeling system (modified-BASINS) was applied to the Seokmoon estuarine reservoir watershed and calibrated with monitoring data from constructed wetland, stream, and reservoir. The calibrated integrated modeling system estimated that constructing wetlands on 0.5% (about 114 ha) of the watershed area at the mouth of reservoir could reduce 11.61% and 13.49% of total external nitrogen and phosphorus loads, respectively. It also might improve the nitrogen and phosphorus concentration of the reservoir by 9.69% and 16.48%, respectively. The study suggested that about 0.1%-1.0% of the watershed area should be allocated for constructed wetland to meet specified water-quality standards for the estuarine reservoir at the polder area where land use planning is relatively less complicated.展开更多
1 Project positioning Baihetan Hydropower Station is classified as the second of the four hydropower cascades in the lower reaches of the Jinsha River:Wudongde,Baihetan,Xiluodu and Xiangjiaba.As an important backbone ...1 Project positioning Baihetan Hydropower Station is classified as the second of the four hydropower cascades in the lower reaches of the Jinsha River:Wudongde,Baihetan,Xiluodu and Xiangjiaba.As an important backbone project for China to implement the strategy of West-to-East Power Transmission and optimize the energy structure,it constitutes an important part of the Yangtze River flood control system.Located at the junction of Ningnan County,Sichuan Province and Qiaojia County,Yunnan Province,the hydropower station is the largest hydropower project under construction in the world,with a unit capacity of million-kilowatts ranking the highest in the world and a total installed capacity of 16 million kW,second only to the Three Gorges Project,ranking the second in the world.展开更多
基金This study is supported by the National Natural Science Foundation of China(Grants 41730424,41961144023 and 42002162)。
文摘The natural cracking of crude oils in deep reservoirs has gained great interest due to continuously increasing depth of petroleum exploration and exploitation.Complex oil compositions and surroundings as well as complicated geological evolutions make oil cracking in nature much more complex than industrial pyrolysis.So far,numerous studies,focused on this topic,have made considerable progress although there still exist some drawbacks.However,a comprehensive review on crude oil cracking is yet to be conducted.This article systematically reviews the controlling factors of oil cracking from six aspects,namely,oil compositions,temperature and time,pressure,water,minerals and solid organic matter.We compare previous experimental and modelling results and present new field cases.In the following,we evaluate the prevailing estimation methods for the extent of oil cracking,and elucidate other factors that may interfere with the application of these estimation methods.This review will be helpful for further investigations of crude oil cracking and provides a guide for estimation of the cracking extent of crude oils.
文摘Since the reform and opening up,Chinese economy has developed rapidly.Industrial and civil construction projects have made significant progress.That said,it is of great significance to further strengthen the construction management of industrial and civil construction projects for the longterm development of construction industry in China.In terms of reality,one of the common problems in the current industrial and civil construction is wall cracks,which will have an important impact on the appearance of the building and the overall construction quality.Therefore,it is necessary to analyze the reasons and put forward corresponding measures on it.That is how we can continuously improve the construction quality in civil and industrial construction projects,thereby achieving the enhancement of building safety and stability.
文摘This article describes the integrated modeling approach for planning the size and the operation of constructed wetlands for maximizing retention of nonpoint source pollutant loads and reservoir water-quality improvement at a catchment scale. The experimental field-scale wetland systems (four sets, 0.88 ha each) have been in operation since 2002, where water depth was maintained at 30-50 cm and hydraulic loading rate was at 6.3-18.8 cm/day. The wetland system was found to be adequate for treating polluted stream water with stable removal efficiency even during the winter. The integrated modeling system (modified-BASINS) was applied to the Seokmoon estuarine reservoir watershed and calibrated with monitoring data from constructed wetland, stream, and reservoir. The calibrated integrated modeling system estimated that constructing wetlands on 0.5% (about 114 ha) of the watershed area at the mouth of reservoir could reduce 11.61% and 13.49% of total external nitrogen and phosphorus loads, respectively. It also might improve the nitrogen and phosphorus concentration of the reservoir by 9.69% and 16.48%, respectively. The study suggested that about 0.1%-1.0% of the watershed area should be allocated for constructed wetland to meet specified water-quality standards for the estuarine reservoir at the polder area where land use planning is relatively less complicated.
文摘1 Project positioning Baihetan Hydropower Station is classified as the second of the four hydropower cascades in the lower reaches of the Jinsha River:Wudongde,Baihetan,Xiluodu and Xiangjiaba.As an important backbone project for China to implement the strategy of West-to-East Power Transmission and optimize the energy structure,it constitutes an important part of the Yangtze River flood control system.Located at the junction of Ningnan County,Sichuan Province and Qiaojia County,Yunnan Province,the hydropower station is the largest hydropower project under construction in the world,with a unit capacity of million-kilowatts ranking the highest in the world and a total installed capacity of 16 million kW,second only to the Three Gorges Project,ranking the second in the world.