期刊文献+
共找到64篇文章
< 1 2 4 >
每页显示 20 50 100
A Pre-Selection-Based Ant Colony System for Integrated Resources Scheduling Problem at Marine Container Terminal
1
作者 Rong Wang Xinxin Xu +2 位作者 Zijia Wang Fei Ji Nankun Mu 《Computers, Materials & Continua》 SCIE EI 2024年第8期2363-2385,共23页
Marine container terminal(MCT)plays a key role in the marine intelligent transportation system and international logistics system.However,the efficiency of resource scheduling significantly influences the operation pe... Marine container terminal(MCT)plays a key role in the marine intelligent transportation system and international logistics system.However,the efficiency of resource scheduling significantly influences the operation performance of MCT.To solve the practical resource scheduling problem(RSP)in MCT efficiently,this paper has contributions to both the problem model and the algorithm design.Firstly,in the problem model,different from most of the existing studies that only consider scheduling part of the resources in MCT,we propose a unified mathematical model for formulating an integrated RSP.The new integrated RSP model allocates and schedules multiple MCT resources simultaneously by taking the total cost minimization as the objective.Secondly,in the algorithm design,a pre-selection-based ant colony system(PACS)approach is proposed based on graphic structure solution representation and a pre-selection strategy.On the one hand,as the RSP can be formulated as the shortest path problem on the directed complete graph,the graphic structure is proposed to represent the solution encoding to consider multiple constraints and multiple factors of the RSP,which effectively avoids the generation of infeasible solutions.On the other hand,the pre-selection strategy aims to reduce the computational burden of PACS and to fast obtain a higher-quality solution.To evaluate the performance of the proposed novel PACS in solving the new integrated RSP model,a set of test cases with different sizes is conducted.Experimental results and comparisons show the effectiveness and efficiency of the PACS algorithm,which can significantly outperform other state-of-the-art algorithms. 展开更多
关键词 resource scheduling problem(RSP) ant colony system(ACS) marine container terminal(MCT) pre-selection strategy
下载PDF
A Novel Predictive Model for Edge Computing Resource Scheduling Based on Deep Neural Network
2
作者 Ming Gao Weiwei Cai +3 位作者 Yizhang Jiang Wenjun Hu Jian Yao Pengjiang Qian 《Computer Modeling in Engineering & Sciences》 SCIE EI 2024年第4期259-277,共19页
Currently,applications accessing remote computing resources through cloud data centers is the main mode of operation,but this mode of operation greatly increases communication latency and reduces overall quality of se... Currently,applications accessing remote computing resources through cloud data centers is the main mode of operation,but this mode of operation greatly increases communication latency and reduces overall quality of service(QoS)and quality of experience(QoE).Edge computing technology extends cloud service functionality to the edge of the mobile network,closer to the task execution end,and can effectivelymitigate the communication latency problem.However,the massive and heterogeneous nature of servers in edge computing systems brings new challenges to task scheduling and resource management,and the booming development of artificial neural networks provides us withmore powerfulmethods to alleviate this limitation.Therefore,in this paper,we proposed a time series forecasting model incorporating Conv1D,LSTM and GRU for edge computing device resource scheduling,trained and tested the forecasting model using a small self-built dataset,and achieved competitive experimental results. 展开更多
关键词 Edge computing resource scheduling predictive models
下载PDF
Research on Optimization of Dual-Resource Batch Scheduling in Flexible Job Shop
3
作者 Qinhui Liu Zhijie Gao +2 位作者 Jiang Li Shuo Li Laizheng Zhu 《Computers, Materials & Continua》 SCIE EI 2023年第8期2503-2530,共28页
With the rapid development of intelligent manufacturing and the changes in market demand,the current manufacturing industry presents the characteristics of multi-varieties,small batches,customization,and a short produ... With the rapid development of intelligent manufacturing and the changes in market demand,the current manufacturing industry presents the characteristics of multi-varieties,small batches,customization,and a short production cycle,with the whole production process having certain flexibility.In this paper,a mathematical model is established with the minimum production cycle as the optimization objective for the dual-resource batch scheduling of the flexible job shop,and an improved nested optimization algorithm is designed to solve the problem.The outer layer batch optimization problem is solved by the improved simulated annealing algorithm.The inner double resource scheduling problem is solved by the improved adaptive genetic algorithm,the double coding scheme,and the decoding scheme of Automated Guided Vehicle(AGV)scheduling based on the scheduling rules.The time consumption of collision-free paths is solved with the path planning algorithm which uses the Dijkstra algorithm based on a time window.Finally,the effectiveness of the algorithm is verified by actual cases,and the influence of AGV with different configurations on workshop production efficiency is analyzed. 展开更多
关键词 Dual resource scheduling batch optimization genetic algorithm simulated annealing time window
下载PDF
Chaotic Sandpiper Optimization Based Virtual Machine Scheduling for Cyber-Physical Systems
4
作者 P.Ramadevi T.Jayasankar +1 位作者 V.Dinesh M.Dhamodaran 《Computer Systems Science & Engineering》 SCIE EI 2023年第2期1373-1385,共13页
Recently,with the growth of cyber physical systems(CPS),several applications have begun to deploy in the CPS for connecting the cyber space with the physical scale effectively.Besides,the cloud computing(CC)enabled CP... Recently,with the growth of cyber physical systems(CPS),several applications have begun to deploy in the CPS for connecting the cyber space with the physical scale effectively.Besides,the cloud computing(CC)enabled CPS offers huge processing and storage resources for CPS thatfinds helpful for a range of application areas.At the same time,with the massive development of applica-tions that exist in the CPS environment,the energy utilization of the cloud enabled CPS has gained significant interest.For improving the energy effective-ness of the CC platform,virtualization technologies have been employed for resource management and the applications are executed via virtual machines(VMs).Since effective scheduling of resources acts as an important role in the design of cloud enabled CPS,this paper focuses on the design of chaotic sandpi-per optimization based VM scheduling(CSPO-VMS)technique for energy effi-cient CPS.The CSPO-VMS technique is utilized for searching for the optimum VM migration solution and it helps to choose an effective scheduling strategy.The CSPO algorithm integrates the concepts of traditional SPO algorithm with the chaos theory,which substitutes the main parameter and combines it with the chaos.In order to improve the process of determining the global optimum solutions and convergence rate of the SPO algorithm,the chaotic concept is included in the SPO algorithm.The CSPO-VMS technique also derives afitness function to choose optimal scheduling strategy in the CPS environment.In order to demonstrate the enhanced performance of the CSPO-VMS technique,a wide range of simulations were carried out and the results are examined under varying aspects.The simulation results ensured the improved performance of the CSPO-VMS technique over the recent methods interms of different measures. 展开更多
关键词 resource scheduling cyber physical systems cloud computing VM migration energy efficiency
下载PDF
Battle Royale Optimization-Based Resource Scheduling Scheme for Cloud Computing Environment
5
作者 Lenin Babu Russeliah R.Adaline Suji D.Bright Anand 《Computer Systems Science & Engineering》 SCIE EI 2023年第9期3925-3938,共14页
Cloud computing(CC)is developing as a powerful and flexible computational structure for providing ubiquitous service to users.It receives interrelated software and hardware resources in an integrated manner distinct f... Cloud computing(CC)is developing as a powerful and flexible computational structure for providing ubiquitous service to users.It receives interrelated software and hardware resources in an integrated manner distinct from the classical computational environment.The variation of software and hardware resources were combined and composed as a resource pool.The software no more resided in the single hardware environment,it can be executed on the schedule of resource pools to optimize resource consumption.Optimizing energy consumption in CC environments is the question that allows utilizing several energy conservation approaches for effective resource allocation.This study introduces a Battle Royale Optimization-based Resource Scheduling Scheme for Cloud Computing Environment(BRORSS-CCE)technique.The presented BRORSS-CCE technique majorly schedules the available resources for maximum utilization and effectual makespan.In the BRORSS-CCE technique,the BRO is a population-based algorithm where all the individuals are denoted by a soldier/player who likes to go towards the optimal place and ultimate survival.The BRORSS-CCE technique can be employed to balance the load,distribute resources based on demand and assure services to all requests.The experimental validation of the BRORSS-CCE technique is tested under distinct aspects.The experimental outcomes indicated the enhancements of the BRORSS-CCE technique over other models. 展开更多
关键词 Cloud computing resource scheduling battle royale optimization MAKESPAN resource utilization
下载PDF
Improved Delay Priority Resource Scheduling with Low Packet Loss Rate for MBMS in LTE Systems 被引量:1
6
作者 Xin Sun Yuan Yang Zhengyu Song 《Journal of Beijing Institute of Technology》 EI CAS 2020年第3期339-344,共6页
An improved delay priority resource scheduling algorithm with low packet loss rate for multimedia broadcast multicast service(MBMS)in long term evolution(LTE)systems is proposed in this paper.Real-time services in LTE... An improved delay priority resource scheduling algorithm with low packet loss rate for multimedia broadcast multicast service(MBMS)in long term evolution(LTE)systems is proposed in this paper.Real-time services in LTE systems require lower delay and packet loss rate.However,it is difficult to meet the QoS requirements of real-time services using the current MBMS resource scheduling algorithm.The proposed algorithm in this paper jointly considers user delay information and real-time channel conditions.By introducing the user delay information,the lower delay and fairness of users are guaranteed.Meanwhile,by considering the channel conditions of users,the packet loss rate can be effectively reduced,improving the system throughput.Simulation results show that under the premise of ensuring the delay requirements of real-time services,the proposed algorithm achieves a lower packet loss rate compared to other existing algorithms.Furthermore,it can achieve a good balance between system throughput and user fairness. 展开更多
关键词 multimedia broadcast multicast service(MBMS) quality of service resource scheduling real time services
下载PDF
A New Algorithm for Resource Constraint Project Scheduling Problem Based on Multi-Agent Systems 被引量:1
7
作者 何曙光 齐二石 李钢 《Transactions of Tianjin University》 EI CAS 2003年第4期348-352,共5页
The resource constrained project scheduling problem (RCPSP) and a decision-making model based on multi-agent systems (MAS) and general equilibrium marketing are proposed. An algorithm leading to the resource allocatio... The resource constrained project scheduling problem (RCPSP) and a decision-making model based on multi-agent systems (MAS) and general equilibrium marketing are proposed. An algorithm leading to the resource allocation decision involved in RCPSP has also been developed. And this algorithm can be used in the multi-project scheduling field as well.Finally, an illustration is given. 展开更多
关键词 resource constrained project scheduling problem multi-agent systems general equilibrium market ALGORITHM
下载PDF
Dynamic Offloading and Scheduling Strategy for Telematics Tasks Based on Latency Minimization
8
作者 Yu Zhou Yun Zhang +4 位作者 Guowei Li Hang Yang Wei Zhang Ting Lyu Yueqiang Xu 《Computers, Materials & Continua》 SCIE EI 2024年第8期1809-1829,共21页
In current research on task offloading and resource scheduling in vehicular networks,vehicles are commonly assumed to maintain constant speed or relatively stationary states,and the impact of speed variations on task ... In current research on task offloading and resource scheduling in vehicular networks,vehicles are commonly assumed to maintain constant speed or relatively stationary states,and the impact of speed variations on task offloading is often overlooked.It is frequently assumed that vehicles can be accurately modeled during actual motion processes.However,in vehicular dynamic environments,both the tasks generated by the vehicles and the vehicles’surroundings are constantly changing,making it difficult to achieve real-time modeling for actual dynamic vehicular network scenarios.Taking into account the actual dynamic vehicular scenarios,this paper considers the real-time non-uniform movement of vehicles and proposes a vehicular task dynamic offloading and scheduling algorithm for single-task multi-vehicle vehicular network scenarios,attempting to solve the dynamic decision-making problem in task offloading process.The optimization objective is to minimize the average task completion time,which is formulated as a multi-constrained non-linear programming problem.Due to the mobility of vehicles,a constraint model is applied in the decision-making process to dynamically determine whether the communication range is sufficient for task offloading and transmission.Finally,the proposed vehicular task dynamic offloading and scheduling algorithm based on muti-agent deep deterministic policy gradient(MADDPG)is applied to solve the optimal solution of the optimization problem.Simulation results show that the algorithm proposed in this paper is able to achieve lower latency task computation offloading.Meanwhile,the average task completion time of the proposed algorithm in this paper can be improved by 7.6%compared to the performance of the MADDPG scheme and 51.1%compared to the performance of deep deterministic policy gradient(DDPG). 展开更多
关键词 Component vehicular DYNAMIC task offloading resource scheduling
下载PDF
Research on Flexible Job Shop Scheduling Based on Improved Two-Layer Optimization Algorithm
9
作者 Qinhui Liu Laizheng Zhu +2 位作者 Zhijie Gao Jilong Wang Jiang Li 《Computers, Materials & Continua》 SCIE EI 2024年第1期811-843,共33页
To improve the productivity,the resource utilization and reduce the production cost of flexible job shops,this paper designs an improved two-layer optimization algorithm for the dual-resource scheduling optimization p... To improve the productivity,the resource utilization and reduce the production cost of flexible job shops,this paper designs an improved two-layer optimization algorithm for the dual-resource scheduling optimization problem of flexible job shop considering workpiece batching.Firstly,a mathematical model is established to minimize the maximum completion time.Secondly,an improved two-layer optimization algorithm is designed:the outer layer algorithm uses an improved PSO(Particle Swarm Optimization)to solve the workpiece batching problem,and the inner layer algorithm uses an improved GA(Genetic Algorithm)to solve the dual-resource scheduling problem.Then,a rescheduling method is designed to solve the task disturbance problem,represented by machine failures,occurring in the workshop production process.Finally,the superiority and effectiveness of the improved two-layer optimization algorithm are verified by two typical cases.The case results show that the improved two-layer optimization algorithm increases the average productivity by 7.44% compared to the ordinary two-layer optimization algorithm.By setting the different numbers of AGVs(Automated Guided Vehicles)and analyzing the impact on the production cycle of the whole order,this paper uses two indicators,the maximum completion time decreasing rate and the average AGV load time,to obtain the optimal number of AGVs,which saves the cost of production while ensuring the production efficiency.This research combines the solved problem with the real production process,which improves the productivity and reduces the production cost of the flexible job shop,and provides new ideas for the subsequent research. 展开更多
关键词 Dual resource scheduling workpiece batching REscheduling particle swarm optimization genetic algorithm
下载PDF
Spectrum-Efficient and Fair Resource Scheduling for MBMS in LTE Systems
10
作者 Xin Sun Honghui Ye Zhengyu Song 《Journal of Beijing Institute of Technology》 EI CAS 2019年第4期777-782,共6页
An improved spectrum-efficient and fair resource scheduling algorithm for multimedia broadcast multicast service(MBMS)in long term evolution(LTE)systems is proposed in this paper.By jointly considering the channel con... An improved spectrum-efficient and fair resource scheduling algorithm for multimedia broadcast multicast service(MBMS)in long term evolution(LTE)systems is proposed in this paper.By jointly considering the channel conditions of all the users,the average packet loss rate,and the fairness of users in the MBMS group,the transmission data rate of the MBMS group is first selected according to the link adaptation and the average packet loss rate of users.Then,the resource blocks are allocated to MBMS groups according to the scheduling priority.Such a resource scheduling algorithm further balances the system throughput and user fairness.Theoretical analysis and simulation results show that the proposed algorithm can achieve a good tradeoff between system throughput and user fairness in comparison with traditional scheduling algorithms. 展开更多
关键词 multimedia broadcast multicast service(MBMS) resource scheduling system throughput user fairness packet loss rate
下载PDF
Delay-performance optimization resource scheduling in many-to-one multi-server cellular edge computing systems
11
作者 Du Peng Ba Teer Zhang Yuan 《Journal of Southeast University(English Edition)》 EI CAS 2019年第3期325-331,共7页
To further reduce the delay in cellular edge computing systems, a new type of resource scheduling algorithm is proposed. Without assuming the knowledge of the statistics of user task arrival traffic, the analytical fo... To further reduce the delay in cellular edge computing systems, a new type of resource scheduling algorithm is proposed. Without assuming the knowledge of the statistics of user task arrival traffic, the analytical formulae of the communication and computing queueing delays in many-to-one multi-server cellular edge computing systems are derived by using the arriving curve and leaving curve. Based on the analytical formulae, an optimization problem of delay minimization is directly formulated, and then a novel scheduling algorithm is designed. The delay performance of the proposed algorithm is evaluated via simulation experiments. Under the considered simulation parameters, the proposed algorithm can achieve 12% less total delay, as compared to the traditional algorithms. System parameters including the weight, the amount of computing resources provided by servers, and the average user task arrival rate have impact on the percentage of delay reduction. Therefore, compared with the queue length optimization based traditional scheduling algorithms, the proposed delay optimization-based scheduling algorithm can further reduce delay. 展开更多
关键词 cellular system DELAY edge computing resource scheduling
下载PDF
Metaheuristic Based Resource Scheduling Technique for Distributed Robotic Control Systems
12
作者 P.Anandraj S.Ramabalan 《Computer Systems Science & Engineering》 SCIE EI 2022年第8期795-811,共17页
The design of controllers for robots is a complex system that is to be dealt with several tasks in real time for enabling the robots to function independently.The distributed robotic control system can be used in real... The design of controllers for robots is a complex system that is to be dealt with several tasks in real time for enabling the robots to function independently.The distributed robotic control system can be used in real time for resolving various challenges such as localization,motion controlling,mapping,route planning,etc.The distributed robotic control system can manage different kinds of heterogenous devices.Designing a distributed robotic control system is a challenging process as it needs to operate effectually under different hardware configurations and varying computational requirements.For instance,scheduling of resources(such as communication channel,computation unit,robot chassis,or sensor input)to the various system components turns out to be an essential requirement for completing the tasks on time.Therefore,resource scheduling is necessary for ensuring effective execution.In this regard,this paper introduces a novel chaotic shell game optimization algorithm(CSGOA)for resource scheduling,known as the CSGOA-RS technique for the distributed robotic control system environment.The CSGOA technique is based on the integration of the chaotic maps concept to the SGO algorithm for enhancing the overall performance.The CSGOA-RS technique is designed for allocating the resources in such a way that the transfer time is minimized and the resource utilization is increased.The CSGOA-RS technique is applicable even for the unpredicted environment where the resources are to be allotted dynamically based on the early estimations.For validating the enhanced performance of the CSGOA-RS technique,a series of simulations have been carried out and the obtained results have been examined with respect to a selected set of measures.The resultant outcomes highlighted the promising performance of the CSGOA-RS technique over the other resource scheduling techniques. 展开更多
关键词 Distributed robotic control system resource scheduling load balancing resource utilization metaheuristics shell game optimization
下载PDF
Resource-saving scheduling scheme for centralized target tracking in multiple radar system under automatic blanket jamming
13
作者 Zhengjie LI Yujie WEI +2 位作者 Junwei XIE Haowei ZHANG Yu TIAN 《Chinese Journal of Aeronautics》 SCIE EI CAS CSCD 2024年第5期349-362,共14页
This paper investigates the problem of Joint Radar Node Selection and Power Allocation(JRNSPA)in the Multiple Radar System(MRS)in the blanket jamming environment.Each radar node independently tracks moving target and ... This paper investigates the problem of Joint Radar Node Selection and Power Allocation(JRNSPA)in the Multiple Radar System(MRS)in the blanket jamming environment.Each radar node independently tracks moving target and subsequently transmits the raw observation data to the fusion center,which formulates a centralized tracking network structure.In order to establish a practical blanket jamming environment,we suppose that each target carries the self-defense jammer which automatically implements blanket jamming to the radar nodes that exceed the preset interception probability.Subsequently,the Predicted Conditional Cramer-Rao Lower Bound(PC-CRLB)is derived and utilized as the tracking accuracy criterion.Aimed at ensuring both the tracking performance and the Low Probability of Intercept(LPI)performance,the resource-saving scheduling model is formulated to minimize the transmit power consumption while meeting the requirements of tracking accuracy.Finally,the Modified Zoutendijk Method Of Feasible Directions(MZMFD)-based two-stage solution technique is adopted to solve the formulated non-convex optimization model.Simulation results show the effectiveness of the proposed JRNSPA scheme. 展开更多
关键词 Multiple Radar system(MRS) Centralized target tracking resource scheduling Blanket jamming Low Probability of Intercept(LPI)
原文传递
Two-Timescale Online Learning of Joint User Association and Resource Scheduling in Dynamic Mobile Edge Computing 被引量:4
14
作者 Jian Zhang Qimei Cui +2 位作者 Xuefei Zhang Xueqing Huang Xiaofeng Tao 《China Communications》 SCIE CSCD 2021年第8期316-331,共16页
For the mobile edge computing network consisting of multiple base stations and resourceconstrained user devices,network cost in terms of energy and delay will incur during task offloading from the user to the edge ser... For the mobile edge computing network consisting of multiple base stations and resourceconstrained user devices,network cost in terms of energy and delay will incur during task offloading from the user to the edge server.With the limitations imposed on transmission capacity,computing resource,and connection capacity,the per-slot online learning algorithm is first proposed to minimize the time-averaged network cost.In particular,by leveraging the theories of stochastic gradient descent and minimum cost maximum flow,the user association is jointly optimized with resource scheduling in each time slot.The theoretical analysis proves that the proposed approach can achieve asymptotic optimality without any prior knowledge of the network environment.Moreover,to alleviate the high network overhead incurred during user handover and task migration,a two-timescale optimization approach is proposed to avoid frequent changes in user association.With user association executed on a large timescale and the resource scheduling decided on the single time slot,the asymptotic optimality is preserved.Simulation results verify the effectiveness of the proposed online learning algorithms. 展开更多
关键词 user association resource scheduling stochastic gradient descent two-timescale optimization mobile edge computing
下载PDF
Trusted Data Acquisition Mechanism for Cloud Resource Scheduling Based on Distributed Agents 被引量:4
15
作者 李小勇 杨月华 《China Communications》 SCIE CSCD 2011年第6期108-116,共9页
Goud computing is a new paradigm in which dynamic and virtualized computing resources are provided as services over the Internet. However, because cloud resource is open and dynamically configured, resource allocation... Goud computing is a new paradigm in which dynamic and virtualized computing resources are provided as services over the Internet. However, because cloud resource is open and dynamically configured, resource allocation and scheduling are extremely important challenges in cloud infrastructure. Based on distributed agents, this paper presents trusted data acquisition mechanism for efficient scheduling cloud resources to satisfy various user requests. Our mechanism defines, collects and analyzes multiple key trust targets of cloud service resources based on historical information of servers in a cloud data center. As a result, using our trust computing mechanism, cloud providers can utilize their resources efficiently and also provide highly trusted resources and services to many users. 展开更多
关键词 cloud computing trusted computing distributed agent resource scheduling
下载PDF
Modeling for UAV resource scheduling under mission synchronization 被引量:2
16
作者 Jia Zeng Xiaoke Yang +1 位作者 Lingyu Yang Gongzhang Shen 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2010年第5期821-826,共6页
Unmanned aerial vehicle(UAV) resource scheduling means to allocate and aggregate the available UAV resources depending on the mission requirements and the battlefield situation assessment.In previous studies,the mod... Unmanned aerial vehicle(UAV) resource scheduling means to allocate and aggregate the available UAV resources depending on the mission requirements and the battlefield situation assessment.In previous studies,the models cannot reflect the mission synchronization;the targets are treated respectively,which results in the large scale of the problem and high computational complexity.To overcome these disadvantages,a model for UAV resource scheduling under mission synchronization is proposed,which is based on single-objective non-linear integer programming.And several cooperative teams are aggregated for the target clusters from the available resources.The evaluation indices of weapon allocation are referenced in establishing the objective function and the constraints for the issue.The scales of the target clusters are considered as the constraints for the scales of the cooperative teams to make them match in scale.The functions of the intersection between the "mission time-window" and the UAV "arrival time-window" are introduced into the objective function and the constraints in order to describe the mission synchronization effectively.The results demonstrate that the proposed expanded model can meet the requirement of mission synchronization,guide the aggregation of cooperative teams for the target clusters and control the scale of the problem effectively. 展开更多
关键词 unmanned aerial vehicle(UAV) mission planning resource scheduling mission synchronization time-window integer programming target cluster.
下载PDF
Dual-resource integrated scheduling method of AGV and machine in intelligent manufacturing job shop 被引量:3
17
作者 YUAN Ming-hai LI Ya-dong +1 位作者 PEI Feng-que GU Wen-bin 《Journal of Central South University》 SCIE EI CAS CSCD 2021年第8期2423-2435,共13页
In view of the fact that traditional job shop scheduling only considers a single factor, which affects the effect of resource allocation, the dual-resource integrated scheduling problem between AGV and machine in inte... In view of the fact that traditional job shop scheduling only considers a single factor, which affects the effect of resource allocation, the dual-resource integrated scheduling problem between AGV and machine in intelligent manufacturing job shop environment was studied. The dual-resource integrated scheduling model of AGV and machine was established by comprehensively considering constraints of machines, workpieces and AGVs. The bidirectional single path fixed guidance system based on topological map was determined, and the AGV transportation task model was defined. The improved A* path optimization algorithm was used to determine the optimal path, and the path conflict elimination mechanism was described. The improved NSGA-Ⅱ algorithm was used to determine the machining workpiece sequence, and the competition mechanism was introduced to allocate AGV transportation tasks. The proposed model and method were verified by a workshop production example, the results showed that the dual resource integrated scheduling strategy of AGV and machine is effective. 展开更多
关键词 dual resource integrated scheduling improved A* algorithm improved NSGA-Ⅱ algorithm competition mechanism
下载PDF
Application-adaptive resource scheduling in a computational grid 被引量:1
18
作者 LUAN Cui-ju SONG Guang-hua ZHENG Yao 《Journal of Zhejiang University-Science A(Applied Physics & Engineering)》 SCIE EI CAS CSCD 2006年第10期1634-1641,共8页
Selecting appropriate resources for running a job efficiently is one of the common objectives in a computational grid. Resource scheduling should consider the specific characteristics of the application, and decide th... Selecting appropriate resources for running a job efficiently is one of the common objectives in a computational grid. Resource scheduling should consider the specific characteristics of the application, and decide the metrics to be used accordingly. This paper presents a distributed resource scheduling framework mainly consisting of a job scheduler and a local scheduler. In order to meet the requirements of different applications, we adopt HGSA, a Heuristic-based Greedy Scheduling Algorithm, to schedule jobs in the grid, where the heuristic knowledge is the metric weights of the computing resources and the metric workload impact factors. The metric weight is used to control the effect of the metric on the application. For different applications, only metric weights and the metric workload impact factors need to be changed, while the scheduling algorithm remains the same. Experimental results are presented to demonstrate the adaptability of the HGSA. 展开更多
关键词 GRID resource scheduling Heuristic knowledge Greedy scheduling algorithm
下载PDF
No-cooperative games for multiple emergency locations in resource scheduling 被引量:1
19
作者 Yang, Jijun Xu, Weisheng +1 位作者 Wu, Qidi Wang, Guangjing 《Journal of Southeast University(English Edition)》 EI CAS 2008年第S1期88-93,共6页
When an emergency happens, the scheduling of relief resources to multiple emergency locations is a realistic and intricate problem, especially when the available resources are limited. A non-cooperative games model an... When an emergency happens, the scheduling of relief resources to multiple emergency locations is a realistic and intricate problem, especially when the available resources are limited. A non-cooperative games model and an algorithm for scheduling of relief resources are presented. In the model, the players correspond to the multiple emergency locations, strategies correspond to all resources scheduling and the payoff of each emergency location corresponds to the reciprocal of its scheduling cost. Thus, the optimal results are determined by the Nash equilibrium point of this game. Then the iterative algorithm is introduced to seek the Nash equilibrium point. Simulation and analysis are given to demonstrate the feasibility and availability of the model. 展开更多
关键词 emergency management non-cooperative games Nash equilibrium point resources scheduling
下载PDF
A multi-resource scheduling scheme of Kubernetes for IIoT 被引量:1
20
作者 ZHU Lin LI Junjiang +1 位作者 LIU Zijie ZHANG Dengyin 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2022年第3期683-692,共10页
With the rapid development of data applications in the scene of Industrial Internet of Things(IIoT),how to schedule resources in IIoT environment has become an urgent problem to be solved.Due to benefit of its strong ... With the rapid development of data applications in the scene of Industrial Internet of Things(IIoT),how to schedule resources in IIoT environment has become an urgent problem to be solved.Due to benefit of its strong scalability and compatibility,Kubernetes has been applied to resource scheduling in IIoT scenarios.However,the limited types of resources,the default scheduling scoring strategy,and the lack of delay control module limit its resource scheduling performance.To address these problems,this paper proposes a multi-resource scheduling(MRS)scheme of Kubernetes for IIoT.The MRS scheme dynamically balances resource utilization by taking both requirements of tasks and the current system state into consideration.Furthermore,the experiments demonstrate the effectiveness of the MRS scheme in terms of delay control and resource utilization. 展开更多
关键词 Industrial Internet of Things(IIoT) Kubernetes resource scheduling time delay
下载PDF
上一页 1 2 4 下一页 到第
使用帮助 返回顶部