In order to minimize the project duration of resourceconstrained project scheduling problem( RCPSP), a gene expression programming-based scheduling rule( GEP-SR) method is proposed to automatically discover and select...In order to minimize the project duration of resourceconstrained project scheduling problem( RCPSP), a gene expression programming-based scheduling rule( GEP-SR) method is proposed to automatically discover and select the effective scheduling rules( SRs) which are constructed using the project status and attributes of the activities. SRs are represented by the chromosomes of GEP, and an improved parallel schedule generation scheme( IPSGS) is used to transform the SRs into explicit schedules. The framework of GEP-SR for RCPSP is designed,and the effectiveness of the GEP-SR approach is demonstrated by comparing with other methods on the same instances.展开更多
A memetic algorithm (MA) for a multi-mode resourceconstrained project scheduling problem (MRCPSP) is proposed. We use a new fitness function and two very effective local search procedures in the proposed MA. The f...A memetic algorithm (MA) for a multi-mode resourceconstrained project scheduling problem (MRCPSP) is proposed. We use a new fitness function and two very effective local search procedures in the proposed MA. The fitness function makes use of a mechanism called "strategic oscillation" to make the search process have a higher probability to visit solutions around a "feasible boundary". One of the local search procedures aims at improving the lower bound of project makespan to be less than a known upper bound, and another aims at improving a solution of an MRCPSP instance accepting infeasible solutions based on the new fitness function in the search process. A detailed computational experiment is set up using instances from the problem instance library PSPLIB. Computational results show that the proposed MA is very competitive with the state-of-the-art algorithms. The MA obtains improved solutions for one instance of set J30.展开更多
This paper introduces a hybrid evolutionary algorithm for the resource-constrained project scheduling problem (RCPSP). Given an RCPSP instance, the algorithm identifies the problem structure and selects a suitable dec...This paper introduces a hybrid evolutionary algorithm for the resource-constrained project scheduling problem (RCPSP). Given an RCPSP instance, the algorithm identifies the problem structure and selects a suitable decoding scheme. Then a multi-pass biased sampling method followed up by a multi-local search is used to generate a diverse and good quality initial population. The population then evolves through modified order-based recombination and mutation operators to perform exploration for promising solutions within the entire region. Mutation is performed only if the current population has converged or the produced offspring by recombination operator is too similar to one of his parents. Finally the algorithm performs an intensified local search on the best solution found in the evolutionary stage. Computational experiments using standard instances indicate that the proposed algorithm works well in both computational time and solution quality.展开更多
Offshore engineering construction projects are large and complex,having the characteristics of multiple execution modes andmultiple resource constraints.Their complex internal scheduling processes can be regarded as r...Offshore engineering construction projects are large and complex,having the characteristics of multiple execution modes andmultiple resource constraints.Their complex internal scheduling processes can be regarded as resourceconstrained project scheduling problems(RCPSPs).To solve RCPSP problems in offshore engineering construction more rapidly,a hybrid genetic algorithmwas established.To solve the defects of genetic algorithms,which easily fall into the local optimal solution,a local search operation was added to a genetic algorithm to defend the offspring after crossover/mutation.Then,an elitist strategy and adaptive operators were adopted to protect the generated optimal solutions,reduce the computation time and avoid premature convergence.A calibrated function method was used to cater to the roulette rules,and appropriate rules for encoding,decoding and crossover/mutation were designed.Finally,a simple network was designed and validated using the case study of a real offshore project.The performance of the genetic algorithmand a simulated annealing algorithmwas compared to validate the feasibility and effectiveness of the approach.展开更多
This paper presents a new method to solve the resource-constrained project scheduling problem for software development. In this method,activity duration times are described as fuzzy variables and resource-constrained ...This paper presents a new method to solve the resource-constrained project scheduling problem for software development. In this method,activity duration times are described as fuzzy variables and resource-constrained software project scheduling problems are described as fuzzy programming models. First,how to model the software project scheduling problem under the fuzzy environment conditions is proposed. Second,in order to satisfy the different requirements of decision-making,two novel fuzzy project scheduling models,expected cost model and credibility maximization model,are suggested. Third,a hybrid intelligent algorithm integrated by genetic algorithm and fuzzy simulation is designed to solve the above two fuzzy programming models. Numerical experiments illustrate the effectiveness of the hybrid intelligent algorithm.展开更多
In this paper we formulate a bi-criteria search strategy of a heuristic learning algorithm for solving multiple resource-constrained project scheduling problems. The heuristic solves problems in two phases. In the pre...In this paper we formulate a bi-criteria search strategy of a heuristic learning algorithm for solving multiple resource-constrained project scheduling problems. The heuristic solves problems in two phases. In the pre-processing phase, the algorithm estimates distance between a state and the goal state and measures complexity of problem instances. In the search phase, the algorithm uses estimates of the pre-processing phase to further estimate distances to the goal state. The search continues in a stepwise generation of a series of intermediate states through search path evaluation process with backtracking. Developments of intermediate states are exclusively based on a bi-criteria new state selection technique where we consider resource utilization and duration estimate to the goal state. We also propose a variable weighting technique based on initial problem complexity measures. Introducing this technique allows the algorithm to efficiently solve complex project scheduling problems. A numerical example illustrates the algorithm and performance is evaluated by extensive experimentation with various problem parameters. Computational results indicate significance of the algorithm in terms of solution quality and computational performance.展开更多
This paper considers a project scheduling problem with the objective of minimizing resource availability costs appealed to finish al activities before the deadline. There are finish-start type precedence relations amo...This paper considers a project scheduling problem with the objective of minimizing resource availability costs appealed to finish al activities before the deadline. There are finish-start type precedence relations among the activities which require some kinds of renewable resources. We predigest the process of sol-ving the resource availability cost problem (RACP) by using start time of each activity to code the schedule. Then, a novel heuris-tic algorithm is proposed to make the process of looking for the best solution efficiently. And then pseudo particle swarm optimiza-tion (PPSO) combined with PSO and path relinking procedure is presented to solve the RACP. Final y, comparative computational experiments are designed and the computational results show that the proposed method is very effective to solve RACP.展开更多
The resource constrained project scheduling problem (RCPSP) and a decision-making model based on multi-agent systems (MAS) and general equilibrium marketing are proposed. An algorithm leading to the resource allocatio...The resource constrained project scheduling problem (RCPSP) and a decision-making model based on multi-agent systems (MAS) and general equilibrium marketing are proposed. An algorithm leading to the resource allocation decision involved in RCPSP has also been developed. And this algorithm can be used in the multi-project scheduling field as well.Finally, an illustration is given.展开更多
Project scheduling problem is mainly to determine the schedule of allocating resources in order to balance the total cost and the completion time. This paper chiefly uses chance theory to introduce project scheduling ...Project scheduling problem is mainly to determine the schedule of allocating resources in order to balance the total cost and the completion time. This paper chiefly uses chance theory to introduce project scheduling problem with uncertain variables. First, two types of single-objective programming models with uncertain variables as uncertain chance-constrained model and uncertain maximization chance-constrained model are established to meet different management requirements, then they are extended to multi-objective programming model with uncertain variables.展开更多
This study utilizes a time-precedence network technique to construct two models of multi-mode resource constrained project scheduling problem with discounted cash flows (MRCPSPDCF), individually including the progre...This study utilizes a time-precedence network technique to construct two models of multi-mode resource constrained project scheduling problem with discounted cash flows (MRCPSPDCF), individually including the progress payment (PP) and the payment at an equal time interval (ETI). The objective of each model is to maximize the net present value (NPV) for all cash flows in the project, subject to the related operational constraints. The models are characterized as NP-hard. A heuristic algorithm, coupled with two upper bound solutions, is proposed to efficiently solve the models and evaluate the heuristic algorithm performance which was not performed in past studies. The results show that the performance of proposed models and heuristic algorithm is good.展开更多
To solve the resource-constrained multiple project scheduling problem(RCMPSP) more effectively,a method based on timed colored Petri net(TCPN) was proposed.In this methodology,firstly a novel mapping mechanism between...To solve the resource-constrained multiple project scheduling problem(RCMPSP) more effectively,a method based on timed colored Petri net(TCPN) was proposed.In this methodology,firstly a novel mapping mechanism between traditional network diagram such as CPM(critical path method)/PERT(program evaluation and review technique) and TCPN was presented.Then a primary TCPN(PTCPN) for solving RCMPSP was modeled based on the proposed mapping mechanism.Meanwhile,the object PTCPN was used to simulate the multiple projects scheduling and to find the approximately optimal value of RCMPSP.Finally,the performance of the proposed approach for solving RCMPSP was validated by executing a mould manufacturing example.展开更多
This paper deals with the problem of project scheduling subject to multiple execution modes with non-renewable resources, and a model that handles some of monetary issues in real world applications.The objective is to...This paper deals with the problem of project scheduling subject to multiple execution modes with non-renewable resources, and a model that handles some of monetary issues in real world applications.The objective is to schedule the activities to maximize the expected net present value(NPV) of the project, taking into account the activity costs, the activity durations, and the cash flows generated by successfully completing an activity.Owing to the combinatorial nature of this problem, the current study develops a hybrid of branch-and-bound procedure and memetic algorithm to enhance both mode assignment and activity scheduling.Modifications for the makespan minimization problem have been made through a set of benchmark problem instances.Algorithmic performance is rated on the maximization of the project NPV and computational results show that the two-phase hybrid metaheuristic performs competitively for all instances of different problem sizes.展开更多
In supply chain management (SCM) environment, we consider a resource-constrained project scheduling problem (rcPSP) model as one of advanced scheduling problems considered by a constraint programming technique. We de...In supply chain management (SCM) environment, we consider a resource-constrained project scheduling problem (rcPSP) model as one of advanced scheduling problems considered by a constraint programming technique. We develop a hybrid genetic algorithm (hGA) with a fuzzy logic controller (FLC) to solve the rcPSP which is the well known NP-hard problem. This new approach is based on the design of genetic operators with FLC through initializing the serial method which is superior for a large rcPSP scale. For solving these rcPSP problems, we first demonstrate that our hGA with FLC (flc-hGA) yields better results than several heuristic procedures presented in the literature. We have revealed a fact that flc-hGA has the evolutionary behaviors of average fitness better than hGA without FLC.展开更多
In this study,we considered a bi-objective,multi-project,multi-mode resource-constrained project scheduling problem.We adopted three objective pairs as combinations of the net present value(NPV)as a financial performa...In this study,we considered a bi-objective,multi-project,multi-mode resource-constrained project scheduling problem.We adopted three objective pairs as combinations of the net present value(NPV)as a financial performance measure with one of the time-based performance measures,namely,makespan(Cmax),mean completion time(MCT),and mean flow time(MFT)(i.e.,minCmax/maxA^PF,minA/Cr/max7VPF,and min MFTI mdixNPV).We developed a hybrid non-dominated sorting genetic algorithm Ⅱ(hybrid-NSGA-Ⅱ)as a solution method by introducing a backward-forward pass(BFP)procedure and an injection procedure into NSGA-Ⅱ.The BFP was proposed for new population generation and post-processing.Then,an injection procedure was introduced to increase diversity.The BFP and injection procedures led to improved objective functional values.The injection procedure generated a significantly high number of non-dominated solutions,thereby resulting in great diversity.An extensive computational study was performed.Results showed that hybrid-NSGA-Ⅱ surpassed NSGA-Ⅱ in terms of the performance metrics hypervolume,maximum spread,and the number of nondominated solutions.Solutions were obtained for the objective pairs using hybrid-NSGA-Ⅱ and three different test problem sets with specific properties.Further analysis was performed by employing cash balance,which was another financial performance measure of practical importance.Several managerial insights and extensions for further research were presented.展开更多
基金The Spring Plan of Ministry of Education,China(No.Z2012017)
文摘In order to minimize the project duration of resourceconstrained project scheduling problem( RCPSP), a gene expression programming-based scheduling rule( GEP-SR) method is proposed to automatically discover and select the effective scheduling rules( SRs) which are constructed using the project status and attributes of the activities. SRs are represented by the chromosomes of GEP, and an improved parallel schedule generation scheme( IPSGS) is used to transform the SRs into explicit schedules. The framework of GEP-SR for RCPSP is designed,and the effectiveness of the GEP-SR approach is demonstrated by comparing with other methods on the same instances.
基金supported by the National Natural Science Foundation of China(71171038)
文摘A memetic algorithm (MA) for a multi-mode resourceconstrained project scheduling problem (MRCPSP) is proposed. We use a new fitness function and two very effective local search procedures in the proposed MA. The fitness function makes use of a mechanism called "strategic oscillation" to make the search process have a higher probability to visit solutions around a "feasible boundary". One of the local search procedures aims at improving the lower bound of project makespan to be less than a known upper bound, and another aims at improving a solution of an MRCPSP instance accepting infeasible solutions based on the new fitness function in the search process. A detailed computational experiment is set up using instances from the problem instance library PSPLIB. Computational results show that the proposed MA is very competitive with the state-of-the-art algorithms. The MA obtains improved solutions for one instance of set J30.
文摘This paper introduces a hybrid evolutionary algorithm for the resource-constrained project scheduling problem (RCPSP). Given an RCPSP instance, the algorithm identifies the problem structure and selects a suitable decoding scheme. Then a multi-pass biased sampling method followed up by a multi-local search is used to generate a diverse and good quality initial population. The population then evolves through modified order-based recombination and mutation operators to perform exploration for promising solutions within the entire region. Mutation is performed only if the current population has converged or the produced offspring by recombination operator is too similar to one of his parents. Finally the algorithm performs an intensified local search on the best solution found in the evolutionary stage. Computational experiments using standard instances indicate that the proposed algorithm works well in both computational time and solution quality.
基金funded by the Ministry of Industry and Information Technology of the People’s Republic of China(Nos.[2018]473,[2019]331).
文摘Offshore engineering construction projects are large and complex,having the characteristics of multiple execution modes andmultiple resource constraints.Their complex internal scheduling processes can be regarded as resourceconstrained project scheduling problems(RCPSPs).To solve RCPSP problems in offshore engineering construction more rapidly,a hybrid genetic algorithmwas established.To solve the defects of genetic algorithms,which easily fall into the local optimal solution,a local search operation was added to a genetic algorithm to defend the offspring after crossover/mutation.Then,an elitist strategy and adaptive operators were adopted to protect the generated optimal solutions,reduce the computation time and avoid premature convergence.A calibrated function method was used to cater to the roulette rules,and appropriate rules for encoding,decoding and crossover/mutation were designed.Finally,a simple network was designed and validated using the case study of a real offshore project.The performance of the genetic algorithmand a simulated annealing algorithmwas compared to validate the feasibility and effectiveness of the approach.
基金Supported by the National Natural Science Foundation of China (60975050)the Specialized Research Fund for the Doctoral Program of Higher Education of China (20070486081)
文摘This paper presents a new method to solve the resource-constrained project scheduling problem for software development. In this method,activity duration times are described as fuzzy variables and resource-constrained software project scheduling problems are described as fuzzy programming models. First,how to model the software project scheduling problem under the fuzzy environment conditions is proposed. Second,in order to satisfy the different requirements of decision-making,two novel fuzzy project scheduling models,expected cost model and credibility maximization model,are suggested. Third,a hybrid intelligent algorithm integrated by genetic algorithm and fuzzy simulation is designed to solve the above two fuzzy programming models. Numerical experiments illustrate the effectiveness of the hybrid intelligent algorithm.
文摘In this paper we formulate a bi-criteria search strategy of a heuristic learning algorithm for solving multiple resource-constrained project scheduling problems. The heuristic solves problems in two phases. In the pre-processing phase, the algorithm estimates distance between a state and the goal state and measures complexity of problem instances. In the search phase, the algorithm uses estimates of the pre-processing phase to further estimate distances to the goal state. The search continues in a stepwise generation of a series of intermediate states through search path evaluation process with backtracking. Developments of intermediate states are exclusively based on a bi-criteria new state selection technique where we consider resource utilization and duration estimate to the goal state. We also propose a variable weighting technique based on initial problem complexity measures. Introducing this technique allows the algorithm to efficiently solve complex project scheduling problems. A numerical example illustrates the algorithm and performance is evaluated by extensive experimentation with various problem parameters. Computational results indicate significance of the algorithm in terms of solution quality and computational performance.
基金supported by the National Natural Science Foundation of China(7120116671201170)
文摘This paper considers a project scheduling problem with the objective of minimizing resource availability costs appealed to finish al activities before the deadline. There are finish-start type precedence relations among the activities which require some kinds of renewable resources. We predigest the process of sol-ving the resource availability cost problem (RACP) by using start time of each activity to code the schedule. Then, a novel heuris-tic algorithm is proposed to make the process of looking for the best solution efficiently. And then pseudo particle swarm optimiza-tion (PPSO) combined with PSO and path relinking procedure is presented to solve the RACP. Final y, comparative computational experiments are designed and the computational results show that the proposed method is very effective to solve RACP.
文摘The resource constrained project scheduling problem (RCPSP) and a decision-making model based on multi-agent systems (MAS) and general equilibrium marketing are proposed. An algorithm leading to the resource allocation decision involved in RCPSP has also been developed. And this algorithm can be used in the multi-project scheduling field as well.Finally, an illustration is given.
文摘Project scheduling problem is mainly to determine the schedule of allocating resources in order to balance the total cost and the completion time. This paper chiefly uses chance theory to introduce project scheduling problem with uncertain variables. First, two types of single-objective programming models with uncertain variables as uncertain chance-constrained model and uncertain maximization chance-constrained model are established to meet different management requirements, then they are extended to multi-objective programming model with uncertain variables.
文摘This study utilizes a time-precedence network technique to construct two models of multi-mode resource constrained project scheduling problem with discounted cash flows (MRCPSPDCF), individually including the progress payment (PP) and the payment at an equal time interval (ETI). The objective of each model is to maximize the net present value (NPV) for all cash flows in the project, subject to the related operational constraints. The models are characterized as NP-hard. A heuristic algorithm, coupled with two upper bound solutions, is proposed to efficiently solve the models and evaluate the heuristic algorithm performance which was not performed in past studies. The results show that the performance of proposed models and heuristic algorithm is good.
文摘To solve the resource-constrained multiple project scheduling problem(RCMPSP) more effectively,a method based on timed colored Petri net(TCPN) was proposed.In this methodology,firstly a novel mapping mechanism between traditional network diagram such as CPM(critical path method)/PERT(program evaluation and review technique) and TCPN was presented.Then a primary TCPN(PTCPN) for solving RCMPSP was modeled based on the proposed mapping mechanism.Meanwhile,the object PTCPN was used to simulate the multiple projects scheduling and to find the approximately optimal value of RCMPSP.Finally,the performance of the proposed approach for solving RCMPSP was validated by executing a mould manufacturing example.
文摘This paper deals with the problem of project scheduling subject to multiple execution modes with non-renewable resources, and a model that handles some of monetary issues in real world applications.The objective is to schedule the activities to maximize the expected net present value(NPV) of the project, taking into account the activity costs, the activity durations, and the cash flows generated by successfully completing an activity.Owing to the combinatorial nature of this problem, the current study develops a hybrid of branch-and-bound procedure and memetic algorithm to enhance both mode assignment and activity scheduling.Modifications for the makespan minimization problem have been made through a set of benchmark problem instances.Algorithmic performance is rated on the maximization of the project NPV and computational results show that the two-phase hybrid metaheuristic performs competitively for all instances of different problem sizes.
文摘In supply chain management (SCM) environment, we consider a resource-constrained project scheduling problem (rcPSP) model as one of advanced scheduling problems considered by a constraint programming technique. We develop a hybrid genetic algorithm (hGA) with a fuzzy logic controller (FLC) to solve the rcPSP which is the well known NP-hard problem. This new approach is based on the design of genetic operators with FLC through initializing the serial method which is superior for a large rcPSP scale. For solving these rcPSP problems, we first demonstrate that our hGA with FLC (flc-hGA) yields better results than several heuristic procedures presented in the literature. We have revealed a fact that flc-hGA has the evolutionary behaviors of average fitness better than hGA without FLC.
文摘In this study,we considered a bi-objective,multi-project,multi-mode resource-constrained project scheduling problem.We adopted three objective pairs as combinations of the net present value(NPV)as a financial performance measure with one of the time-based performance measures,namely,makespan(Cmax),mean completion time(MCT),and mean flow time(MFT)(i.e.,minCmax/maxA^PF,minA/Cr/max7VPF,and min MFTI mdixNPV).We developed a hybrid non-dominated sorting genetic algorithm Ⅱ(hybrid-NSGA-Ⅱ)as a solution method by introducing a backward-forward pass(BFP)procedure and an injection procedure into NSGA-Ⅱ.The BFP was proposed for new population generation and post-processing.Then,an injection procedure was introduced to increase diversity.The BFP and injection procedures led to improved objective functional values.The injection procedure generated a significantly high number of non-dominated solutions,thereby resulting in great diversity.An extensive computational study was performed.Results showed that hybrid-NSGA-Ⅱ surpassed NSGA-Ⅱ in terms of the performance metrics hypervolume,maximum spread,and the number of nondominated solutions.Solutions were obtained for the objective pairs using hybrid-NSGA-Ⅱ and three different test problem sets with specific properties.Further analysis was performed by employing cash balance,which was another financial performance measure of practical importance.Several managerial insights and extensions for further research were presented.